| 1 | Cartage of the following material from center Stores, Asfabad, Firozabad or from any other place to dump site, [Distance 00.00 Km to 30.00 Km] including the work of its loading and unloading at the respective ends and also including the work of dragging etc and also including the cost of arrangement of laborer, T&P carrier etc required for proper completion of work. | Cartage of the following material from center Stores, Asfabad, Firozabad or from any other place to dump site, [Distance 00.00 Km to 30.00 Km] including the work of its loading and unloading at the respective ends and also including the work of dragging etc and also including the cost of arrangement of laborer, T&P carrier etc required for proper completion of work. |
| 2 | 8.5/9 meter long PCC pole | 8.5/9 meter long PCC pole |
| 3 | 11/13 meter long ST pole | 11/13 meter long ST pole |
| 4 | 10/16 KVA transformer | 10/16 KVA transformer |
| 5 | 25 KVA transformer | 25 KVA transformer |
| 6 | 63 KVA transformer | 63 KVA transformer |
| 7 | Weasel conductor, and other line material | Weasel conductor, and other line material |
| 8 | Drilling of hole in M. S. channel and angle for Double pole, guarding, Extra “T” | Drilling of hole in M. S. channel and angle for Double pole, guarding, Extra “T” |
| 9 | Opening of HT/LT fittings from the damaged single support of 8.5/9 meter long PCC pole at various places, including the cost of arrangement of labourer, T&P etc required for proper completion of work | Opening of HT/LT fittings from the damaged single support of 8.5/9 meter long PCC pole at various places, including the cost of arrangement of labourer, T&P etc required for proper completion of work |
| 10 | Making coils of spread and dismantled conductor with utmost care for its maximum possible laying on the support or to place in store. | Making coils of spread and dismantled conductor with utmost care for its maximum possible laying on the support or to place in store. |
| 11 | Erection of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. | Erection of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. |
| 12 | Erection of 8.5/9 meter long PCC pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. | Erection of 8.5/9 meter long PCC pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. |
| 13 | Erection of 11/13 meter long ST pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. | Erection of 11/13 meter long ST pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. |
| 14 | Installation and grouting of following as RESPO manual in ratio 1:4:8 in cement, sand and brick ballast. | Installation and grouting of following as RESPO manual in ratio 1:4:8 in cement, sand and brick ballast. |
| 15 | 11 KV Stay set | 11 KV Stay set |
| 16 | Straightening of tilted / bended 8.5/9 meter long PCC pole / 11/13 meter long ST pole, as per RESPO norms. | Straightening of tilted / bended 8.5/9 meter long PCC pole / 11/13 meter long ST pole, as per RESPO norms. |
| 17 | Installation of Extra “T” as per RESPO manual | Installation of Extra “T” as per RESPO manual |
| 18 | Re nozzling and tightening of stay, as per RESPO norms | Re nozzling and tightening of stay, as per RESPO norms |
| 19 | Chopping of trees | Chopping of trees |
| 20 | Replacement of following damaged fittings. | Replacement of following damaged fittings. |
| 21 | 11 KV pin insulator | 11 KV pin insulator |
| 22 | 11 KV disk insulator | 11 KV disk insulator |
| 23 | Replacement material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. | Replacement material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. |
| 24 | 11 KV cross arm holding clamp with nut & bolt | 11 KV cross arm holding clamp with nut & bolt |
| 25 | 11 KV U clamp with nut & bolt | 11 KV U clamp with nut & bolt |
| 26 | 11 KV F clamp with nut & bolt | 11 KV F clamp with nut & bolt |
| 27 | Various Size 11 KV outdoor Jointing Kit | Various Size 11 KV outdoor Jointing Kit |
| 28 | Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. | Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. |
| 29 | 10/16 KVA transformer | 10/16 KVA transformer |
| 30 | 25 KVA transformer | 25 KVA transformer |
| 31 | 63 KVA transformer | 63 KVA transformer |
| 32 | Laying, sagging and stringing and jumpering/ binding etc of the following conductor on the aforesaid newly erected Poles as pre RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc required for proper completion of work. | Laying, sagging and stringing and jumpering/ binding etc of the following conductor on the aforesaid newly erected Poles as pre RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc required for proper completion of work. |
| 33 | ACSR weasel conductor | ACSR weasel conductor |
| 34 | Dog Conductor | Dog Conductor |
| 35 | AB Cable | AB Cable |
| 36 | Re-sagging, binding and jumpering of loose following conductor as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P carrier etc required for proper completion of work. | Re-sagging, binding and jumpering of loose following conductor as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P carrier etc required for proper completion of work. |
| 37 | ACSR weasel conductor | ACSR weasel conductor |
| 38 | Dog Conductor | Dog Conductor |
| 39 | AB Cable | AB Cable |
| 40 | Tightening of loose guarding | Tightening of loose guarding |