|
| 1 | 13 Meter long STP (SP-70) | 13 Meter long STP (SP-70) |
| 2 | ACSR DOG CONDUCTOR (1.5 X 3 + 3% Sag and Jumpering = 4.635 + 1.0 = 5.635 KM.) | ACSR DOG CONDUCTOR (1.5 X 3 + 3% Sag and Jumpering = 4.635 + 1.0 = 5.635 KM.) |
| 3 | 33 KV XLPE Insulated Al. Cable 3 x 300 sq. mm. | 33 KV XLPE Insulated Al. Cable 3 x 300 sq. mm. |
| 4 | Polymeric 33 KV Pin Insulators | Polymeric 33 KV Pin Insulators |
| 5 | 33 KV Disc Fitting B & S Type – 70 KN | 33 KV Disc Fitting B & S Type – 70 KN |
| 6 | 33 KV Polymeric Disc Insulators B&S Type 70 KN | 33 KV Polymeric Disc Insulators B&S Type 70 KN |
| 7 | 33 KV 'V' Type X-arm | 33 KV 'V' Type X-arm |
| 8 | 33 KV Cross arm holding clamp with nuts, bolts & washers | 33 KV Cross arm holding clamp with nuts, bolts & washers |
| 9 | \\" E \\" bracket for 33 KV line (Galvanized) | \\" E \\" bracket for 33 KV line (Galvanized) |
| 10 | Armour rod with ferrule for Dog conductor | Armour rod with ferrule for Dog conductor |
| 11 | Angle 65x65x6 mm, 4300 mm long for bracing with clamps (Galvanized) | Angle 65x65x6 mm, 4300 mm long for bracing with clamps (Galvanized) |
| 12 | Top Channel 125x65 mm, 3200 mm long with 2 nos clamps (Galvanized) | Top Channel 125x65 mm, 3200 mm long with 2 nos clamps (Galvanized) |
| 13 | Droper Channel 100x50 mm, 3000 mm long with 2 nos clamps (Galvanized) | Droper Channel 100x50 mm, 3000 mm long with 2 nos clamps (Galvanized) |
| 14 | P.G. clamps for Reccoon/Dog | P.G. clamps for Reccoon/Dog |
| 15 | Nut, bolt with washer (Galvanized) | Nut, bolt with washer (Galvanized) |
| 16 | Guarding Angle 65x65x6x2600 mm (Galvanized) | Guarding Angle 65x65x6x2600 mm (Galvanized) |
| 17 | Guarding Angle 65x65x6x3600 mm (Galvanized) | Guarding Angle 65x65x6x3600 mm (Galvanized) |
| 18 | Holding clamp for guarding angle with nuts & bolts (Galvanized) | Holding clamp for guarding angle with nuts & bolts (Galvanized) |
| 19 | G.I. Barbed wire | G.I. Barbed wire |
| 20 | G.I. Wire No. 6 SWG | G.I. Wire No. 6 SWG |
| 21 | G.I. Wire No. 8 SWG | G.I. Wire No. 8 SWG |
| 22 | G.I. Wire No. 16 SWG | G.I. Wire No. 16 SWG |
| 23 | Stone Pad (300x300x75 mm.) | Stone Pad (300x300x75 mm.) |
| 24 | 33 KV Number plate with clamp with nuts, & bolts | 33 KV Number plate with clamp with nuts, & bolts |
| 25 | Danger board with clamp with nuts, & bolts | Danger board with clamp with nuts, & bolts |
| 26 | Alluminium binding wire- 6 SWG | Alluminium binding wire- 6 SWG |
| 27 | Alluminium paint | Alluminium paint |
| 28 | Red oxide paint | Red oxide paint |
| 29 | Turn Buckle (Galvanized) | Turn Buckle (Galvanized) |
| 30 | Eye bolt 12 x 110 mm (Galvanized) | Eye bolt 12 x 110 mm (Galvanized) |
| 31 | 33 KV Heat Shrinkable Jointing Kit Outdoor Type for 33 KV, 3x300 Sq. mm. XLPE Cable | 33 KV Heat Shrinkable Jointing Kit Outdoor Type for 33 KV, 3x300 Sq. mm. XLPE Cable |
| 32 | Clamps for fixing of cable and cable box (Galvanized) | Clamps for fixing of cable and cable box (Galvanized) |
| 33 | Supply of HDPE Pipe PN-6, 160mm dia Pipe for laying of 33KV, 3x300Sq.mm | Supply of HDPE Pipe PN-6, 160mm dia Pipe for laying of 33KV, 3x300Sq.mm |
| 34 | Clamps for holding of H.D.P.E. Pipe (Galvanized) | Clamps for holding of H.D.P.E. Pipe (Galvanized) |
| 35 | Earthing of Pole by M.S. earthing Rod of 20 x2500 mm and 6 SWG earthing wire etc. | Earthing of Pole by M.S. earthing Rod of 20 x2500 mm and 6 SWG earthing wire etc. |
| 36 | Stay Complete (G.I Stay rod 20x1800 mm, Stay Insulator, Stay wire 7/8 SWG and Stay clamp, concreting, Nut, bolt with washer) | Stay Complete (G.I Stay rod 20x1800 mm, Stay Insulator, Stay wire 7/8 SWG and Stay clamp, concreting, Nut, bolt with washer) |
| 37 | Concreting with muffing of S.T. Pole 13.0 Mtr. long | Concreting with muffing of S.T. Pole 13.0 Mtr. long |
| 38 | Tree Branches chopping/cutting compensation | Tree Branches chopping/cutting compensation |
| 39 | Digging of Trench by excavation of earth laying of brick on both side, filling of sand, laying of cable put the sand & brick on cable & earth ramming and dressing properly with complete job for laying 33 KV XLPE cables of sizes 3x300 Sq.mm. including cost of bricks, sand, clamps etc. | Digging of Trench by excavation of earth laying of brick on both side, filling of sand, laying of cable put the sand & brick on cable & earth ramming and dressing properly with complete job for laying 33 KV XLPE cables of sizes 3x300 Sq.mm. including cost of bricks, sand, clamps etc. |
| 40 | Digging of trench and Laying of 3x300 sq.mm. cable in H.D.P.E Pipe PN-6, 160mm dia below ground level as per Resspo norms/site requirement by open trench Method, back filling of earth, ramming and dressing properly complete Job | Digging of trench and Laying of 3x300 sq.mm. cable in H.D.P.E Pipe PN-6, 160mm dia below ground level as per Resspo norms/site requirement by open trench Method, back filling of earth, ramming and dressing properly complete Job |
| 41 | Laying of 33 KV, 3x300 sq.mm. XLPE Cable underground in trunches. | Laying of 33 KV, 3x300 sq.mm. XLPE Cable underground in trunches. |
| 42 | Laying of 33 KV, 3x300 XLPE Cable with H.D.P.E. Pipe on Double Pole Structure | Laying of 33 KV, 3x300 XLPE Cable with H.D.P.E. Pipe on Double Pole Structure |
| 43 | Laying of 33 KV, 3x300 XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. | Laying of 33 KV, 3x300 XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. |
| 44 | Road Restoration Charge (Kachha Road) | Road Restoration Charge (Kachha Road) |
| 45 | Road Restoration Charge (Pakka Road) | Road Restoration Charge (Pakka Road) |
| 46 | Cable Route Marker | Cable Route Marker |
| 47 | Tee Channel 125 x 65 x 2240 mm. x 1 No. with Clamp, nuts & bolts | Tee Channel 125 x 65 x 2240 mm. x 1 No. with Clamp, nuts & bolts |
| 48 | Angle 65 x 65 x 6 x 2700 mm. with Clamp, nuts & bolts | Angle 65 x 65 x 6 x 2700 mm. with Clamp, nuts & bolts |
| 49 | Shifting of old conductor and accessories on new line (Whole Line) | Shifting of old conductor and accessories on new line (Whole Line) |
| 50 | 11 KV LINE :- 8.5 Mtr. long PCC Pole | 11 KV LINE :- 8.5 Mtr. long PCC Pole |
| 51 | 11 KV Polymeric Disc Insulators B&S Type 4500 Kg. | 11 KV Polymeric Disc Insulators B&S Type 4500 Kg. |
| 52 | Disc Fittings for Dog/Raccoon 4500 Kg. | Disc Fittings for Dog/Raccoon 4500 Kg. |
| 53 | Top Channel 100x50 mm, 2240 mm long with 2 nos clamps (Galvanized) | Top Channel 100x50 mm, 2240 mm long with 2 nos clamps (Galvanized) |
| 54 | Droper Channel 100x50 mm, 2028 mm long with 2 nos clamps (Galvanized) | Droper Channel 100x50 mm, 2028 mm long with 2 nos clamps (Galvanized) |
| 55 | Angle 65x65x6x2700 mm Bracing Set with Clamps. (Galvanized) | Angle 65x65x6x2700 mm Bracing Set with Clamps. (Galvanized) |
| 56 | P.G. clamps | P.G. clamps |
| 57 | Painting number mark with Paint | Painting number mark with Paint |
| 58 | Concreting of PCC 8.5 Mtr. long | Concreting of PCC 8.5 Mtr. long |
| 59 | Stay Complete (GI Stay Rod 16x1800mm, Stay Insulator, Stay wire 7/10 SWG and Stay clamp, concreting, Nut, bolt with washer) | Stay Complete (GI Stay Rod 16x1800mm, Stay Insulator, Stay wire 7/10 SWG and Stay clamp, concreting, Nut, bolt with washer) |
| 60 | Supply of HDPE Pipe 140mm dia | Supply of HDPE Pipe 140mm dia |
| 61 | 11 KV 3x185 XLPE Cable | 11 KV 3x185 XLPE Cable |
| 62 | H/S O/D 11 KV 3x185 sqmm J/kit | H/S O/D 11 KV 3x185 sqmm J/kit |
| 63 | Digging of Trench by excavation of earth laying of brick on both side, filling of sand, laying of cable put the sand & brick on cable & earth ramming and dressing properly with complete job for laying 11 KV XLPE cables of sizes 3x185 Sq.mm. including cost of bricks, sand, clamps etc. | Digging of Trench by excavation of earth laying of brick on both side, filling of sand, laying of cable put the sand & brick on cable & earth ramming and dressing properly with complete job for laying 11 KV XLPE cables of sizes 3x185 Sq.mm. including cost of bricks, sand, clamps etc. |
| 64 | Laying of H.D.P.E. Pipe underground below the Highway/Road or as per drawing approved by Highway/Road by HDD Method along with laying of 11 KV, 3x185 Sq. mm. XLPE Cable in H.D.P.E. Pipe | Laying of H.D.P.E. Pipe underground below the Highway/Road or as per drawing approved by Highway/Road by HDD Method along with laying of 11 KV, 3x185 Sq. mm. XLPE Cable in H.D.P.E. Pipe |
| 65 | Laying of 11 KV, 3x185 sq.mm. XLPE Cable underground in trunches. | Laying of 11 KV, 3x185 sq.mm. XLPE Cable underground in trunches. |
| 66 | Laying of 11 KV, 3x185 XLPE Cable with H.D.P.E. Pipe on Double Pole Structure | Laying of 11 KV, 3x185 XLPE Cable with H.D.P.E. Pipe on Double Pole Structure |
| 67 | Laying of 11 KV, 3x185 XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. | Laying of 11 KV, 3x185 XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. |
| 68 | Carriage of following material from Center Store to Site: 13 Meter long STP (SP-70) | Carriage of following material from Center Store to Site: 13 Meter long STP (SP-70) |
| 69 | ACSR DOG CONDUCTOR (1.5 X 3 + 3% Sag and Jumpering = 4.635 + 1.0 = 5.635 KM.) | ACSR DOG CONDUCTOR (1.5 X 3 + 3% Sag and Jumpering = 4.635 + 1.0 = 5.635 KM.) |
| 70 | 33 KV XLPE Insulated Al. Cable 3 x 300 sq. mm. | 33 KV XLPE Insulated Al. Cable 3 x 300 sq. mm. |
| 71 | 33 KV 'V' Type X-arm | 33 KV 'V' Type X-arm |
| 72 | 11 KV LINE :- 8.5 Mtr. long PCC Pole | 11 KV LINE :- 8.5 Mtr. long PCC Pole |
| 73 | 11 KV 3x185 XLPE Cable | 11 KV 3x185 XLPE Cable |