|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: The Divisional Manager, Domkal Division, WBSEDCL Name of Work: Shifting of electrical equipments from old CRB to new CRB and construction of new CRB with boundary wall and other related Civil work at Raninagar 33/11 KV switch yard under Domkal Division,WBSEDCL :Ref: Contract No:DKL/e-Tender/26-27/01 dated 25.05.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Item No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words (INR) |
| 2 | Dismantling of existing of 33KV C&R Panel , SCADA Compatible for individual control of power transformers with differential relay from old CRB and re-installation the same to new CRB. |
| 3 | Dismantling of existing RTCC PNL from old CRB and re-installation the same tyo new CRB. |
| 4 | Removal of existing 1.1KV 4C x 2.5 sq. mm Copper Control cable from existing cable trenches and relaying the same to new cable trenches with all complete. |
| 5 | Removal of existing 1.1KV 8C x 2.5 sq. mm Copper Control cable from existing cable trenches and relaying the same to new cable trenches with all complete. |
| 6 | Removal of existing 1.1KV 12C x 2.5 sq. mm Copper Control cable from existing cable trenches and relaying the same to new cable trenches with all complete. |
| 7 | Re-installation of 30V,100 AH Battery from existing CRB to new CRB |
| 8 | Re-installation of 30V, 35 A Automatic Float cum Boost Battery Charger from existing CRB to new CRB. |
| 9 | Re-installation of AC 3-Phase 4W (1A) CT/PT operated AMR. Tri-vector 33 KV Feeder meter from old CRB to new CRB. |
| 10 | Re- installation of A.C. 3 Phase, 3W CT/PT operated AMR. Tri-Vector 11 KV Feeder Meter from old CRB to new CRB |
| 11 | Re-arranging for Installation of Data communication system including hardwares & cable with telephone modem, MRI for all meters for 33/11KV sub-station having features for LAN and Remote connectivity along with supply of Materials. |
| 12 | Relaying & dressing of existing healthy portion of 11 KV 3C, 300 sq mm XLPE cable in the new cable trenches. |
| 13 | Laying of 1.1 KV 185 sq. Mm 4C , PVC Cable. |
| 14 | Laying of 1.1 KV 120 sq. Mm 4C , XLPE Cable. |
| 15 | Laying of 1.1 KV 50 sq. Mm 4C , PVC Cable. |
| 16 | Laying of 1.1 KV 25 sq. Mm 4C , PVC Cable. |
| 17 | Laying of 1.1 KV 16 sq. Mm 2C , PVC Cable. |
| 18 | Laying of 1.1 KV 10 sq. Mm 2C , PVC Cable. |
| 19 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 185 sq. mm 4C , PVC Cable. |
| 20 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 120 sq. mm 4C , XLPE Cable. |
| 21 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 50 sq. mm 4C , PVC Cable. |
| 22 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 25 sq. mm 4C , PVC Cable. |
| 23 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 16 sq. mm 2C , PVC Cable. |
| 24 | Making End Termination Joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 KV 10 sq. mm 2C , PVC Cable. |
| 25 | Re-installation of A.C. Switch Board from old CRB to new CRB. |
| 26 | Re-installation of D.C. Switch Board from old CRB to new CRB. |
| 27 | Dismantling of existing Switchgear (Shunt trip) with VCB (12KV 350MVA 1250/800A) 4 Panel (1IN +0BC+3OUT) from old CRB and re-installation the same to new CRB. |
| 28 | Erection of Switchgear (Shunt trip) with VCB (12KV 350MVA 1250/800A) 8 Panel (2IN +1BC+5OUT). |
| 29 | Erection of Switchgear (Shunt trip) with VCB (12KV 350MVA 1250/800A) 1 Panel (0IN +1BC+0OUT) (One Buscoupler PNL along with Adaptor) |
| 30 | Dismantling of existing Switchgear (Shunt trip) with VCB (12KV 350MVA 1250/800A) 3 Panel (1IN +0BC+2OUT) from old CRB and return to store in good condition. |
| 31 | Dismantling of existing Switchgear (Shunt trip) with VCB (12KV 350MVA 1250/800A) 4 Panel (1IN +1BC+2OUT) from old CRB and return to store in good condition. |
| 32 | Removal/Uprooting & returning of different size of 1.1 KV PVC cable. Qty taken L.S amount as not submitted by site office in the list of returnable materials) Total in Figures 642086.0 23 Six Lakh Forty Two Thousand &Eighty Six Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |