| 1 | Detail of Work |
| 2 | Safely cartage of other complete line material Weasal Conductor/Xlpe Cable (Except PCC) from ESC, SRE/ JE store to site of work including loading, unloading at both ends |
| 3 | Safely carriage of 250 KVA T/F from ESC, SRE to site of work including loading & unloading at both ends.. |
| 4 | Safely carriage of 11 KV Fuse set from ESC, SRE to site of work including loading & unloading at both ends.. |
| 5 | Safely Installation of 11 KV Fuse set and connection Properly |
| 6 | Providing and Fixing LT Incoming panel with metering eq & fixing arrangement (LS) |
| 7 | Providing and fixing Al Lug long barrel off size |
| 8 | Fixing of 11 KV stay rods (Stay Set) by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 9 | Providing and fixing CopperL-piece 50x225x10/62x225x12 mm (LS) |
| 10 | Providing and Fixing 11 KV Danger board with clamp nuts & bolts. for ST Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 11 | Constriction of plinth for installation of 250 KVA T/F of size 2x2x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC Top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 12 | Removal of 100 KVA T/F From the D/P & Carriage From Site to ESC, SRE including loading & unloading at both ends. |
| 13 | Safely installation of New 250 KVA T/F on the plinth by private crain with proper alignment and Complete fitting including making connection and commissioning |
| 14 | Laying and making connections of LT PVC XlPE cable 3.5x400 sq.mm. from T/F to double pole (approx to 15 Mtr). |
| 15 | Chemical Earthing for 250 KVA T/F 50 mm 3 meter long with 2 bags of 25 kg compound each. |
| 16 | Providing & Making of Wiremesh fencing size 2.5x2.5x2.5 mtr with grouting making frame of MS angle 45x45x6 mm and fixing four no MS strip size 25x6 mm at equal distance in between the frame and fixing square mesh of 50 mm squre in each frame the fencing should cover all side of T/F with providing 1 no door size 6x3 with sitakni & dandala with green paints (British/Asian/enamel paints) |
| 17 | Providing and Fixing of Double Circuit Tail less unit 300 amp. incoming Circuit connected with copper Bus Bar of proper Rating for 250 KVA T/F. in the Frame made of MS Angle 45x45x5 mm Fitted with G.I Nut Bolt & Fixing the same Top of Plinth/Near Ground level as per Site Requirement |
| 18 | Safely cartage of PCC poles 8.5 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 19 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 20 | Erection of single support on PCC poles (8.5 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 21 | Erection of single support on PCC poles (11 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 22 | Concreting of PCC Pole 8.5/11 Mtr long with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 23 | Earthing of Pole by MS earthing rod properly |
| 24 | Concreting of stay rod in ratio 1:4:8 with Ist class brick ballast with cement, sand. |
| 25 | Fixing of 11KV stay rods by digging of pits in block of 600X600X300 mm. & with nozzling of stay wire 7/10 / 7/8 SWG and fitting the same on the pole. |
| 26 | fixing of Stay wire and fitting the same on the pole. |
| 27 | Providing and fixing of GI barbed wire on the each pole. |
| 28 | fixing of Earth wire and fitting the same on the pole. |
| 29 | Providing and fixing of stone ped 300x300x75 |
| 30 | Providing and fixing of Number plate with clamp on the each pole. |
| 31 | Providing and Fixing Danger board with clamp nuts & bolts. for PCC Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 32 | Providing of fixing All type MS Clamp for PCC poles with nuts bolts made of new MS flat iron 50x5 mm. |
| 33 | Providing & Fixing of nuts and bolts properly. |
| 34 | Fixing of Cross Arm V-Type . |
| 35 | Providing & Fabrication charges of M.S. Angel 75x75x6x2028mm |
| 36 | Providing & Fabrication charges of M.S. Channel 125x65x2240mm |
| 37 | Fixing of 11 KV Polymeric Disc Insulator properly. |
| 38 | Fixing of 11 KV Disc Fitting properly. |
| 39 | Fixing of 11 KV Polymeric Pin Insulator properly. |
| 40 | Fixing of 11 KV Pin with nuts properly. |
| 41 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Line complete properly. |
| 42 | Laying, lifting, stringing proper sagging of 11 KV XLPE cable 3x185sq mm of including complete etc |
| 43 | Providing & fixing of G.I. Pipe 100/120 mm 4/6\\" dia (Classs B) 3.5 mtr. Long at the both side of double pole |
| 44 | Fixing of 11 KV Jointing Kit 3x185 O/D for XLPE cable |
| 45 | Safely carriage of 11 KV O/G VCB (CTR 200/1005A). from ESC, SRE to site of work including loading & unloading at both ends. |
| 46 | Safely Installation of 11 KV O/G VCB (CTR 200/1005A).complete with fixing and making cable connection with proper alignment in all respect. |
| 47 | Water Level Earthing of 11 KV VCB by boring 60 ft. deep and providing & fixing 60 ft. G.I. pipe 1½ dia (Jindal class B) and connecting with G.I. strip of size 40x5 mm with providing of requireed charcoal and salt in the pipe properly. |
| 48 | Removal of old ACSR weasel/Rabbit/Dog conductor (250 Kg), Rail Pole (08 No) Scarp (470 +315 Kg) from the Existing 11KV/ LT lines with making roll of conductor and shifting the same to ESC, SRE/J.E store including loading and unloading at both ends. Please Enable Macros to View BoQ information |