| 1 | Dismantling of StructuresDismantling of existing structures like culverts, bridges,retaining walls and other structure comprising ofmasonry, cement concrete, steel work, including T&Pand scaffolding wherever necessary, sorting thedismantled material, disposal of unserviceablematerial and stacking the serviceable material with alllifts and lead of 1000 m as per Technical SpecificationsClause 202 for Rural Roads of MORD(II) By Mechanical Meansa) Cement Concrete |
| 2 | Excavation for StructuresEarth work in excavation of foundation of structuresas per drawing and technical specification,including setting out, removing, spreading orstacking of spoils within a lead of 150 m. as directedand including trimming the sides of the trenches,leveling, dressing and ramming the bottom, andbackfilling with approved material complete as perdirection of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.a) upto 3 m depth(i) With pumping out water including shoringas required. |
| 3 | Sand filling in foundation trenches and at the backof abutments, wing-walls etc. with good local sandfree from earth in layers not exceeding 15 cm.including inundating each layer by profuse waterand poking and ramming layer by layer completeincluding supply of sand. Quality of sand is to beapproved by the Engineer-in-charge.cum 193.00 343.00Note : 1. Labour rate per m³ is provided; Cost of sand is tobe added to arrive at the complete item rate.2. Compaction factor of dry clean sand is 0.835 |
| 4 | Providing and laying Pitching on slopes laid overprepared filter media including boulder apron laiddry in front of toe of embankment complete as perdrawing and Technical specifications.I. Stone/Boulder |
| 5 | Plain / Reinforced Cement Concrete in Openfoundation with or without reinforcements, in anypart of foundation of bridges / culverts with gradedstone chips of appropriate nominal sizes, includingscreening and cleaning of coarse aggregates, fineaggregate (sand) conforming to proper gradingzone, both of approved quality and cement, asnecessary, cost of curing with water, including costand carriage of all materials and includingpreparation of design mix, approval of the same bythe Engineer-in-Charge, cost for quality control,sampling, testing etc. including cost of formwork butexcluding reinforcement complete as per drawingand technical specifications.A )PCC Grade M20 |
| 6 | Uprooting and Removing Stumps & roots, compactionof backfilling and stacking of serviceable material bymanual means as per Technical Specifications Clause201 for Rural Roads of MORD.A. Lead upto 100 mi) Girth above 300 mm to 600 mm |
| 7 | Weaving wire mattress as directed with wire of 4mmdia. and making sausage crate of required shapeafter tying all intersections including joininglongitudinal ends, closing ends of sausage, carriageof wire to site of work complete in all respect as perdirection of the Engineer-in-charge including cost ofsupply of G.I. wire. (With 100mm x 100mm mesh.) |
| 8 | Filling properly the empty sausage crates withboulders of any size & shape with hand packing afterpreparation of bed of placement, placing the cratein position, carriage of boulders from road stacks witha lead upto 150m etc. complete in all respectincluding stitching the rest of the crate with wire(passage for filling boulders) after filling up the cratewith boulders and launching the crate in position ifnecessary and as directed by the Engineer-incharge.[Rate provided is exclusive of the cost of stoneboulders and sausage crate |
| 9 | Construction of Sub Base using Local Materials,spreading in uniform layers with Motor grader onprepared surface, including screening the metal asnecessary, mixing by mix in place method withRotavator at OMC, and compacting with vibratoryroller to achieve the desired density, lighting,guarding and barricading including cost andcarriage of all materials and making necessaryearthen bundh of one metre wide on each side toprotect the edges complete as per Clause 401 ofSpecifications for Road & Bridge Works of MoRT&H(5th Revision).(iv) For Construction of Sub Base by compactingriver bed materials |
| 10 | Add GST @ 18% |
| 11 | Add Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |