| 1 | SCHEDULE - A : CIVIL & PLUMBING WORKS |
| 2 | SCHEDULE - B : CIVIL & PLUMBING WORKS CONTRACT D2C-11: CIVIL WORKS FOR CONSTRUCTION OF BOUNDARY WALL OF SANOTH DEPOT OF RITHALA-KUNDLI CORRIDOR OF DELHI MRTS PHASE IV. Bill of Quantities Preamble S.No. Item |
| 3 | The Bill of Quantities shall be read in conjuncton with Instructions to Tenderers, General and Special Conditons of Contract, Notice Inviting Tender, Outline Construction Specifications (R4, June 2025), Outline Design Specifictions (R2, July 2021), all Employer's Requirements including appendices, Conditions of Contract on Safety & Health and Environment (May 2025) and Tender Drawings. |
| 4 | Tenderers should quote the percentage above (+)/ below (-)/ at par in respect of single schedule (i.e. Schedule-'A' and Schedule-'B' of the BOQ). Rates in schedule A & B are inclusive of all taxes & duties. |
| 5 | The rates and prices to be tendered in the unit priced Bill of Quantities are for completed and finished items of work and complete in all respect. |
| 6 | If the tenderer fails to quote their rates, the tender may be treated as incomplete and non-responsive and shall be rejected. |
| 7 | Tenderers shall quote their offer in Indian Rupees (INR) only |
| 8 | Errors will be corrected by the employer for any arithmetic errors in computation or summation as per contract conditions. |
| 9 | The work executed against the BOQ items would be paid on measurement basis. The payment for items given in the BOQ shall be made on the basis of actually executed quantities. |
| 10 | It will be deemed to include cost of all plants, labour, supervision, materials, scaffolding for masonry work & any work etc. G.I. binding wire, all lead & lifts, carriage, transport, all temporary works, erection, maintenance, utility identification, survey, all other works mentioned in all Employer's Requirements including appendices, Conditions of Contract on Safety & Health and Environment, contractor's profit and establishment/overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contract. For taxes and duties, refer clause 11.1.1 of General Condition of Contract (December 2025) and C2.6 of ITT. |
| 11 | The Contractor may raise their 'On Account' payments on monthly basis as per the status of work on the last day of the respective month. |
| 12 | In case of any discrepancy between amount quoted in figures and in words, the amount in figures shall be treated as sacrosanct. |
| 13 | The payment under the payment schedule will cover all work specified in the tender drawings and /or provided in the scope of work. The schedule of payment will not get modified due to alterations of any type so far as the modifications/alterations are within the scope of work and/or provided for in the tender drawings. |
| 14 | The Financial Package (Pricing Document) must be uploaded by the same person who is authorized as per the submitted Power of attorney (POA) and who has uploaded the Technical Package using a valid Class-III digital signature on behalf of the Tenderer. CONTRACT D2C-11: CIVIL WORKS FOR CONSTRUCTION OF BOUNDARY WALL OF SANOTH DEPOT OF RITHALA-KUNDLI CORRIDOR OF DELHI MRTS PHASE IV. ANNEXURE 13APROFORMA FOR STATEMENT OF MINOR DEVIATIONS(Refer Clause C 2.2 and C15.1 of ITT) The following are the particulars of minor deviations from the requirements of the Tender Document: S. No Clause Deviations Price adjustment for each deviation/s Note:1. The Tenderer shall indicate price adjustment against each deviation in Annexure 13A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer.2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the tenderer has not proposed any deviations from tender documents.3. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Annexure, it will have no effect.4. All deviations have been listed and priced in the financial proposal and deviations not priced will be treated as null and void and stand withdrawn. Please Enable Macros to View BoQ information |