Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | 11 KV LINE BIFERCATION AMBA PANEL INDUSTRIAL IN B.PLAN 2026-27 SCHEME, IN THE JURISDICTION OF EDD-GARH UNDER EDC HAPUR. (01 NO WORK) DPR 71 |
| 2 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 3 | DISC FITTING 45 KN |
| 4 | ACSR DOG CONDUCTOR |
| 5 | 11 KV COMP. POLY. PIN INSULATOR |
| 6 | STAY SET |
| 7 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 8 | 11 KV VCB OUTGOING |
| 9 | GI X-ARM ANGLE |
| 10 | 11 KV CABLE BOX O/D TYPE SIZE 3X120 SQ.MM |
| 11 | 11 KV HT XLPE CABLE 3X120 SQ.MM. |
| 12 | Laying, stringing and final sagging of ACSR Dog conductor complete in all respects, including providing and fixing of holding clamps, nuts, bolts and E-brackets, wherever required, as per RESPO/drawing norms, including all labour, tools & plants, handling, hoisting and allied works for proper completion of work as directed by the Engineer-in-Charge |
| 13 | Grouting and fixing of stay rod of size 20 ร 1800 mm complete in all respects, including excavation, providing and laying cement concrete of size 0.60 ร 0.60 ร 0.30 m in ratio 1:4:8 (1 cement : 4 coarse sand : 8 graded 40 mm brick ballast), backfilling, proper ramming, fixing, tightening and nozzling of stay wire with stay rod and pole to the required tension as per RESPO drawings/norms, including providing and fixing stay clamp made of M.S. flat of size 50 ร 6 mm with suitable nuts, bolts and loops, and all labour, tools & plants and grouting material as directed by the Engineer-in-Charge. |
| 14 | Making and filling of 11 KV XLPE cable jointing kit suitable for 3 ร 120 Sq.mm cable, complete in all respects, including proper plumbing and taping of XLPE cable, providing, fixing and crimping of suitable size approved quality lugs, including cost of lugs, tapes and all jointing materials, labour, tools & plants required for satisfactory completion of work as per RESPO norms and directions of the Engineer-in-Charge. |
| 15 | Installing, testing and commissioning of 11 KV VCB outgoing panel complete in all respects, including mounting, alignment, interconnection, control wiring, earthing, nuts, bolts, clamps and all associated accessories, labour, tools & plants required for proper installation and satisfactory operation as per approved drawings, departmental specifications and directions of the Engineer-in-Charge |
| 16 | Providing, fabricating and fixing of side bracket made of M.S. channel and M.S. angle, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, complete in all respects as per RESPO norms and directions of the Site In-charge/Engineer-in-Charge, including all labour, tools & plants required for satisfactory completion of work.. |
| 17 | Erection of 11 KV V-type cross arm complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 18 | Erection of 11 KV pin insulator complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 19 | Erection of 11 KV disc insulator with fittings complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 20 | Providing and fixing of T-off clamp complete with suitable nuts, bolts and all associated accessories, as per RESPO norms/approved drawings, including all labour, tools & plants required for proper installation and satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 21 | 33 KV LINE STRENGTHING IN B.PLAN 2026-27 SCHEME, IN THE JURISDICTION OF EDD-GARH UNDER EDC HAPUR. (03 NO WORK) 17,18,19 |
| 22 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 23 | ACSR DOG CONDUCTOR |
| 24 | EARTH ROD |
| 25 | 33 KV COMP. POLY. PIN INSULATOR |
| 26 | PCC POLE 11 MTR. |
| 27 | STAY SET |
| 28 | STAY WIRE |
| 29 | GI WIRE 4MM/8SWG |
| 30 | 33 KV CROSS ARM 100X50 MM |
| 31 | 33 KV CABLE BOX O/D TYPE SIZE 3X300 |
| 32 | 33 KV XLPE CABLE TYPE SIZE 3X300 SQ.MM. |
| 33 | Erection and fixing of the following materials complete in all respects, including all required T&P, labour, handling, lifting, fastening and allied works for proper installation as per departmental specifications, RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 34 | 33 KV COMP. POLY. PIN INSULATOR |
| 35 | STAY WIRE |
| 36 | GI WIRE 4MM/8SWG |
| 37 | Erection and fixing of single PCC pole, 11 mtr long, for 11 KV line complete in all respects, including digging of suitable pit, positioning, alignment, dressing and fixing of requisite accessories as per RESPO drawings/norms, including providing and fixing of F-bracket made of M.S. flat of size 50 ร 6 mm, holding clamps made of M.S. flat of size 50 ร 6 mm with suitable nuts and bolts, and all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 38 | Laying, stringing and final sagging of ACSR Dog conductor complete in all respects, including providing and fixing of holding clamps, nuts, bolts and E-brackets wherever required, as per RESPO/drawing norms, including all labour, tools & plants, handling, hoisting and allied works required for proper completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 39 | Grouting and fixing of stay rod of size 20 ร 1800 mm complete in all respects, including excavation, providing and laying cement concrete of size 0.60 ร 0.60 ร 0.30 m in ratio 1:4:8 (1 cement : 4 coarse sand : 8 graded 40 mm brick ballast) as per drawing, backfilling, proper ramming and allied civil works, including fixing, tightening and nozzling of stay wire with stay rod and pole to the required tension as per RESPO drawings/norms, including providing and fixing stay clamp made of M.S. flat of size 50 ร 6 mm with suitable nuts, bolts and loops, and all grouting materials, labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 40 | Earthing of supports with M.S. earth rod of size 20 ร 2540 mm complete in all respects, including excavation of pit, driving of M.S. rod at a distance of 3.0 m from the support and 0.5 m below ground level, and connection of support with earth electrode using suitable size G.I. wire and earthing lugs, including providing and fixing of proper size nuts, bolts and all associated accessories, as per RESPO drawings/norms, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 41 | Grouting of PCC supports complete in all respects with cement concrete in ratio 1:4:8 (1 cement : 4 coarse sand : 8 graded 40 mm brick ballast) in block size 450 ร 450 mm up to 1/6th of the full length of support below ground level, including providing 300 mm plinth above ground level with cement concrete in ratio 1:3:6 (1 cement : 3 coarse sand : 6 graded stone grit) with proper mufting as per approved drawing, including backfilling, proper ramming and providing all required grouting materials, labour, tools & plants for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 42 | Providing and fixing of 6 inch dia Class-B G.I. pipe over 33 KV 3 ร 300 Sq.mm XLPE cable and LT XLPE cable before mounting on double pole structure, complete in all respects, including providing and fixing of suitable clamps, sealing of top and bottom ends of pipe, burying one end of pipe approximately 500 mm below ground level, mounting and clamping of cable on double pole structure, and making connection with overhead line at both ends, including all labour, tools & plants and associated materials required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 43 | Making and filling of 33 KV XLPE cable jointing kit suitable for 3 ร 300 Sq.mm cable complete in all respects, including proper plumbing and taping of XLPE cable, providing, fixing and crimping of suitable size approved quality lugs, including cost of lugs, tapes and all jointing materials, labour, tools & plants required for satisfactory completion of work as per RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 44 | Erection of 33 KV V-type cross arm complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 45 | Providing and trenchless laying of 200 mm O/D PE-80, PN-4 grade UV stabilized HDPE pipe conforming to relevant IS specifications in standard 6 mtr length for laying of underground cable, complete in all respects as per RESPO norms, including cost of HDPE pipe, jointing, handling, labour, tools & plants and all associated works required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 46 | Providing and fixing of stone pad complete in all respect, including supply of approved quality stone pad, necessary excavation, dressing, leveling, proper positioning, packing with sand/soil, and all labour, tools, plants, and materials required for satisfactory completion of work as per departmental specifications and directions of Engineer-in-Charge. |
| 47 | Laying of 33 KV XLPE cable of size 3 ร 300 Sq.mm underground through HDPE pipe complete in all respects, including pulling, dressing, alignment and leaving spare cable in loop shape at both ends as per RESPO norms, including all labour, tools & plants and associated works required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 48 | Providing and fixing of holding clamp complete in all respects, including suitable nuts, bolts and all associated accessories, as per RESPO norms/approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 49 | Jumpering and line energisation work complete in all respects, including proper connection, tightening, testing and commissioning as per RESPO norms/approved drawings, including all labour, tools & plants and associated materials required for safe and satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 50 | safe de-erection and dismantling of existing/old electrical materials at site, including careful removal without damage to reusable items, and carriage of dismantled materials from site of work to Electricity Store Centre, Hapur, with loading and unloading at both ends over kachha and pakka roads, strictly as per directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, transportation, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 51 | 11 KV LINE STRENGTHING IN B.PLAN 2026-27 SCHEME, IN THE JURISDICTION OF EDD-GARH UNDER EDC HAPUR. (11 NO WORK) DPR 61,62,63,64,65,66,67,68,69,70,71 |
| 52 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 53 | DISC FITTING 45 KN |
| 54 | ACSR WEASEL CONDUCTOR |
| 55 | ACSR RABBIT CONDUCTOR |
| 56 | ACSR DOG CONDUCTOR |
| 57 | EARTH ROD |
| 58 | 11 KV COMP. POLY. PIN INSULATOR |
| 59 | PCC POLE 8.5 MTR. |
| 60 | PCC POLE 11 MTR. |
| 61 | STAY SET |
| 62 | STAY WIRE |
| 63 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 64 | GI WIRE 10SWG |
| 65 | GI X-ARM ANGLE |
| 66 | 11 KV VTYPE STEEL CROSS ARM |
| 67 | 33 KV CABLE BOX O/D TYPE SIZE 3X300 |
| 68 | 11 KV CABLE BOX O/D TYPE SIZE 3X120 SQ.MM |
| 69 | 33 KV XLPE CABLE TYPE SIZE 3X300 SQ.MM. |
| 70 | 11 KV HT XLPE CABLE 3X120 SQ.MM. |
| 71 | 11 KV XLPE CABLE 3X300 SQ.MM. |
| 72 | Erection and fixing of the following materials complete in all respects, including all required T&P, labour, handling, lifting, fastening and allied works for proper installation as per departmental specifications, RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 73 | DISC FITTING 45 KN |
| 74 | 11 KV COMP. POLY. PIN INSULATOR |
| 75 | STAY WIRE |
| 76 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 77 | GI WIRE 10SWG |
| 78 | GI X-ARM ANGLE |
| 79 | 33 KV XLPE CABLE TYPE SIZE 3X300 SQ.MM. |
| 80 | 11 KV HT XLPE CABLE 3X120 SQ.MM. |
| 81 | Erection and fixing of single PCC pole, 8.50 mtr long, for 11 KV line complete in all respects, including digging of suitable pit, positioning, alignment and fixing of requisite accessories as per RESPO drawings/norms, including providing and fixing of F-bracket made of M.S. flat of size 50 ร 6 mm and holding clamps made of M.S. flat of size 50 ร 6 mm with suitable nuts and bolts, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 82 | Laying, stringing and final sagging of ACSR Dog conductor complete in all respects, including providing and fixing of holding clamps, nuts, bolts and E-brackets wherever required, as per RESPO/drawing norms, including all labour, tools & plants, handling, hoisting and allied works required for proper completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 83 | Laying, stringing and final sagging of ACSR Weasel conductor complete in all respects, including providing and fixing of holding clamps, nuts, bolts and E-brackets wherever required, as per RESPO/drawing norms, including all labour, tools & plants, handling, hoisting and allied works required for proper completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 84 | Laying, stringing and final sagging of ACSR Rabbit conductor complete in all respects, including providing and fixing of holding clamps, nuts, bolts and E-brackets wherever required, as per RESPO/drawing norms, including all labour, tools & plants, handling, hoisting and allied works required for proper completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 85 | Grouting and fixing of stay rod of size 20 ร 1800 mm complete in all respects, including excavation, providing and laying cement concrete of size 0.60 ร 0.60 ร 0.30 m in ratio 1:4:8 (1 cement : 4 coarse sand : 8 graded 40 mm brick ballast) as per approved drawing, including backfilling, proper ramming and allied works, fixing, tightening and nozzling of stay wire with stay rod and pole to the required tension as per RESPO drawings/norms, including providing and fixing stay clamp made of M.S. flat of size 50 ร 6 mm with suitable nuts, bolts and loops, and all grouting materials, labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 86 | Earthing of supports with M.S. earth rod of size 20 ร 2540 mm complete in all respects, including excavation of pit, driving of M.S. rod at a distance of 3.0 m from the support and 0.5 m below ground level, and connection of support with earth electrode using suitable size G.I. wire and earthing lugs, including providing and fixing of proper size nuts, bolts and all associated accessories, as per RESPO drawings/norms, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 87 | Grouting of PCC supports complete in all respects with cement concrete in ratio 1:4:8 (1 cement : 4 coarse sand : 8 graded 40 mm brick ballast) in block size 450 ร 450 mm up to 1/6th of the full length of support below ground level, including providing 300 mm plinth above ground level with cement concrete in ratio 1:3:6 (1 cement : 3 coarse sand : 6 graded stone grit) with proper mufting as per approved drawing, including backfilling, proper ramming and providing all required grouting materials, labour, tools & plants for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 88 | Providing and fixing of 6 inch dia Class-B G.I. pipe over 33 KV 3 ร 300 Sq.mm XLPE cable and LT XLPE cable before mounting on double pole structure, complete in all respects, including providing and fixing of suitable clamps, sealing of top and bottom ends of pipe, burying one end of pipe approximately 500 mm below ground level, mounting and clamping of cable on double pole structure, and making connection with overhead line at both ends, including all labour, tools & plants and associated materials required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 89 | Making and filling of 33 KV XLPE cable jointing kit suitable for 3 ร 300 Sq.mm cable complete in all respects, including proper plumbing and taping of XLPE cable, providing, fixing and crimping of suitable size approved quality lugs, including cost of lugs, tapes and all jointing materials, labour, tools & plants required for satisfactory completion of work as per RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 90 | Making and filling of 11 KV XLPE cable jointing kit suitable for 3 ร 120 Sq.mm cable complete in all respects, including proper plumbing and taping of XLPE cable, providing, fixing and crimping of suitable size approved quality lugs, including cost of lugs, tapes and all jointing materials, labour, tools & plants required for satisfactory completion of work as per RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 91 | Providing, fabricating and fixing of side bracket made of M.S. channel and M.S. angle complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 92 | Erection of 33 KV V-type cross arm complete in all respects, including providing and fixing of holding clamps, nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 93 | Providing and trenchless laying of 200 mm O/D PE-80, PN-4 grade UV stabilized HDPE pipe conforming to relevant IS specifications in standard 6 mtr length for laying of underground cable, complete in all respects as per RESPO norms, including cost of HDPE pipe, jointing, handling, labour, tools & plants and all associated works required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 94 | Laying of 11 KV XLPE cable of size 3 ร 125 Sq.mm underground through HDPE pipe complete in all respects, including pulling, dressing, alignment and leaving spare cable in loop shape at both ends as per RESPO norms, including all labour, tools & plants and associated works required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 95 | Laying of 33 KV XLPE cable of size 3 ร 300 Sq.mm underground through HDPE pipe complete in all respects, including pulling, dressing, alignment and leaving spare cable in loop shape at both ends as per RESPO norms, including all labour, tools & plants and associated works required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 96 | Providing and fixing of danger board complete in all respects, including providing and fixing of all required accessories such as suitable clamps, nuts, bolts and allied materials, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 97 | Providing and fixing of stone pad of size 300 ร 300 ร 75 mm complete in all respects, as per RESPO norms and approved drawings, including excavation, dressing, leveling, proper positioning, packing and fixing with all labour, tools & plants and associated materials required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 98 | Providing and fixing of F-clamp complete in all respects, including suitable nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 99 | Providing and fixing of holding clamp complete in all respects, including suitable nuts, bolts and all associated accessories, as per RESPO norms and approved drawings, including all labour, tools & plants required for satisfactory completion of work as directed by the Site In-charge/Engineer-in-Charge. |
| 100 | Providing and fixing Top Channel of approved make and required dimensions conforming to RESPO norms and specifications; work includes material supply, transport, unloading, cutting to size, hoisting, alignment, and rigidly securing in position with approved fasteners, hardware, and scaffolding at any height or location, complete in all respects as per the manufacturer's guidelines and to the entire satisfaction and direction of the Site In-charge. |
| 101 | Providing and fixing G.I. Barbed Wire fencing of approved make, weight, and gauge conforming strictly to RESPO norms and standard technical specifications; work includes supplying, transporting, and unrolling required lines of horizontal and diagonal strands, tightly stretching, aligning, and securely fixing to concrete/steel/stone posts using approved G.I. staples, binding wire, or fasteners, including all leads, lifts, necessary scaffolding, tools, tackles, and labor required to complete the installation in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 102 | Providing and fixing M.S. / G.I. / High-Tensile Nut and Bolt assemblies of approved make, grade, and required diameters/lengths conforming strictly to RESPO norms and standard technical specifications; work includes supply, transport, positioning, aligning, and rigidly tightening to the specified torque using appropriate washers (plain/spring) and tools, including all necessary scaffolding, labor, leads, and lifts required to complete the fastening work in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 103 | Erection of structural steel bracing sets of size 4.3 m x 4.3 m fabricated from M.S. angle sections of size 65 mm x 65 mm x 6 mm, conforming strictly to RESPO norms and technical specifications; work includes hoisting, lifting, proper positioning, leveling, aligning, and rigidly securing the assembly using approved holding clamps, structural nuts, bolts, and washers of required sizes, including the cost of all fastening hardware, necessary tools, tackles, scaffolding, staging, leads, lifts, and labor required to complete the installation in all respects as per standard engineering practices and under the strict direction and entire satisfaction of the Site In-charge. |
| 104 | 33 KV PROTECTION OF SUB-STATION IN B.PLAN 2026-27 SCHEME, IN THE JURISDICTION OF EDD-GARH UNDER EDC HAPUR.(01 NO WORK) DPR 39 |
| 105 | Carriage of 33 KV VCB from Electricity store center Hapur/J,E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site lncharge. |
| 106 | Carriage of 33 KV CT OUT DOOR from Electricity store center Hapur/J,E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site lncharge. |
| 107 | 33 KV Installation of VCB |
| 108 | 33 KV Installation of CT OUTDOOR |
| 109 | Providing & Making and Fixing of side breckit by MS. Channel, MS angle by providing Holding Clamp & nut bolt as per RESPO Norms, and as per direction of site incharge. |
| 110 | Erecetion of 11 KV Disc Insulator with Fitting by providing Holding Clamp & nut bolt as per RESPO Norms, and as per direction of site incharge. |
| 111 | Providing and fixing of COPPER CONTROL CABLE SIZE 2X2.25 SQ.MM. , as per RESPO/Norms and as per direction of site incharge. |
| 112 | Providing, installing, testing, and commissioning of maintenance-free Water Level Chemical Earthing System conforming to IS:3043 specifications for distribution transformers and substations; scope includes boring an earth pit of required depth, inserting a heavy-duty copper-bonded steel electrode or GI pipe (minimum 3-meter length), backfilling the pit with eco-friendly moisture-retaining Earth Enhancement Chemical Compound, providing a dedicated funnel arrangement with a perforated GI watering pipe running to the root of the electrode for manual moisture replenishment, constructing a rigid brick masonry/pre-cast concrete inspection chamber with a heavy-duty removable cover plate at ground level, and establishing secure structural connections to the equipment earth grid using proper size GI/copper strips, inclusive of all excavation in any soil strata, backfilling, ramming, hardware, labor, tools, tackles, and transportation, complete in all respects as per the directions of the Engineer-in-Charge. |
| 113 | Providing and fixing of MS channel as per RESPO/Norms and as per direction of site incharge. |
| 114 | Providing and fixing of MS Angle as per RESPO/Norms and as per direction of site incharge. |
| 115 | Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge. |
| 116 | 33 KV VCB IN B.PLAN 2026-27 SCHEME, IN THE JURISDICTION OF EDD-GARH UNDER EDC HAPUR. ( 07 NO WORK) DPR 20,21,22,23,24,25,26 |
| 117 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 118 | 33 KV CT OUTDOOR CTR 200/100/1 |
| 119 | CONTROL PANNEL 33 KV DOUBLE T/F |
| 120 | 33 KV OUTDOOR TYPE VCB |
| 121 | Providing, fabricating, and fixing M.S. Side Brackets of required design and dimensions, utilizing approved M.S. Channel and M.S. Angle sections, conforming strictly to RESPO norms and standard technical specifications; scope of work includes material supply, cutting, welding, drilling, rust-preventive primer coating, hoisting, proper alignment, and rigidly securing the brackets in position using appropriate holding clamps, nuts, bolts, and washers, inclusive of all necessary staging, scaffolding, tools, tackles, labor, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 122 | Providing, laying, testing, and commissioning of PVC/XLPE insulated, PVC sheathed 2 Core x 2.25 sq.mm. Copper Control Cable (armored/unarmored) of approved make and grade, conforming strictly to RESPO norms and relevant IS specifications; work includes supply, transportation, storage, unrolling, straightening, and laying of cable through existing pipes, conduits, cable trays, or trenches, including dressing, clamping, structural clipping, proper tag identification, end-termination using required size copper lugs, glands, glands-earthing, and testing (insulation resistance and continuity tests), inclusive of all labor, tools, tackles, scaffolding, leads, and lifts, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 123 | Providing, laying, testing, and commissioning of PVC/XLPE insulated, PVC sheathed 4 Core x 2.25 sq.mm. Copper Control Cable (armored/unarmored) of approved make and grade, conforming strictly to RESPO norms and relevant engineering specifications; work includes supply, transportation, storage, unrolling, straightening, and laying of cable through existing pipes, conduits, cable trays, or trenches, including systematic dressing, clamping, structural clipping, proper tag identification, end-termination using required size copper lugs, glands, glands-earthing, and necessary testing (insulation resistance and continuity tests), inclusive of all labor, tools, tackles, scaffolding, staging, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 124 | Construction of Vacuum Circuit Breaker (VCB) plinth of size 2.0 m x 2.0 m x 1.5 m suitable for a 250 KVA transformer/system, executed strictly as per approved structural drawings and RESPO norms; work includes excavation, providing and laying Cement Concrete (CC) 1:4:8 (1 cement : 4 sand : 8 graded brick ballast) in foundation, constructing side walls using 1st class brickwork in cement mortar 1:4 (1 cement : 4 fine sand), applying 12 mm thick cement plaster 1:4 (1 cement : 4 fine sand) on exposed surfaces, backfilling inside the plinth with brick ballast including systematic watering and heavy ramming/compaction, and casting a finished Reinforced Cement Concrete (RCC) top slab in 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate) including necessary reinforcement steel, shuttering, centering, and curing; rate shall be fully inclusive of all material supply, transport, machinery, scaffolding, labor, leads, and lifts, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 125 | Providing, laying, testing, and commissioning of PVC/XLPE insulated, PVC sheathed 6 Core x 2.25 sq.mm. Copper Control Cable (armored/unarmored) of approved make and grade, conforming strictly to RESPO norms and relevant engineering specifications; work includes supply, transportation, storage, unrolling, straightening, and systematic laying of cable through existing pipes, conduits, cable trays, or trenches, including dressing, clamping, structural clipping, proper tag identification, end-termination using required size copper lugs, compression glands, glands-earthing, and mandatory pre-commissioning testing (insulation resistance and continuity tests), inclusive of all labor, tools, tackles, scaffolding, staging, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 126 | Propviding and Intallation all requrment for Earthing of neutral By Boring and lowering of G.I. Pipe size 32 mm dia... into the ground up to water level 80 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will bc bolted to the Nf.S. earth strip for TIF neutral connection, the earth strip '*Vill be welded to the G.l. pipe and neutral earthing support, as per direction of site incharge. |
| 127 | INSTALLATION OF 100 KVA ADDITONAL TF IN B.PLAN 2026-27 SCHEME AT VARIOUS SITE OF EDD-GARH, UNDER EDC HAPUR (No. of Work 5) 121,122,123,124,128 |
| 128 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 129 | DISC FITTING 45 KN |
| 130 | ACSR WEASEL CONDUCTOR |
| 131 | EARTH ROD |
| 132 | A.B CABLE L.T (3X120+1X95+1X16) SQ MM |
| 133 | D.O FUSE SET |
| 134 | 11 KV TPMO SWITCH |
| 135 | 11 KV COMP. POLY. PIN INSULATOR |
| 136 | PCC POLE 8.5 MTR. |
| 137 | PCC POLE 11 MTR. |
| 138 | STAY SET |
| 139 | STAY WIRE |
| 140 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 141 | LT ALU. XLPE CABLE 3.5X150 SQ. MM |
| 142 | GI WIRE 4MM/8SWG |
| 143 | GI X-ARM ANGLE |
| 144 | 100 KVA TRANSFORMER |
| 145 | LT XLPE CABLE 3.5X150 SQ.MM. |
| 146 | Erection and fixing of the following materials complete in all respects, including all required T&P, labour, handling, lifting, fastening and allied works for proper installation as per departmental specifications, RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 147 | DISC FITTING 45 KN |
| 148 | 11 KV COMP. POLY. PIN INSULATOR |
| 149 | STAY WIRE |
| 150 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 151 | LT ALU. XLPE CABLE 3.5X150 SQ. MM |
| 152 | GI WIRE 4MM/8SWG |
| 153 | GI X-ARM ANGLE |
| 154 | LT XLPE CABLE 3.5X150 SQ.MM. |
| 155 | Erection of Double Pole (DP) structure utilizing 8.5-meter long PCC poles, complete with all necessary structural accessories and conforming strictly to approved RESPO drawings and norms; work includes excavation, pole erection, alignment, backfilling, and fabrication, supply, and fixing of M.S. Top and Dropper Channels, M.S. TIF Angles, and E-Brackets; installation of 11 KV Pin Insulators with pins and Disc Insulators with appropriate hardware/disc fittings; providing and fixing structural stays, bracings, and assemblies fabricated from M.S. Flat of size 50 mm x 6 mm, secured tightly with proper size nuts, bolts, and washers; execution of complete standard jumpering, binding, and PG clamping work using appropriate conductors/accessories to ensure electrical continuity; rate shall be fully inclusive of all structural steel, hardware, insulation materials, machinery, tools, tackles, scaffolding, labor, leads, and lifts at any height, complete in all respects as per standard engineering practices under the strict direction and entire satisfaction of the Site In-charge. |
| 156 | Erection of Double Pole (DP) structure utilizing 11-meter long PCC poles, complete with all structural accessories and conforming strictly to approved RESPO drawings and norms; work includes excavation, pole erection, leveling, alignment, and backfilling; fabrication, supply, and fixing of M.S. Top and Dropper Channels, M.S. TF Angles, and E-Brackets; installation of 11 KV Pin Insulators with pins and Disc Insulators with appropriate hardware/disc fittings; providing and fixing structural bracings, ties, and support assemblies fabricated from M.S. Flat of size 50 mm x 6 mm, secured tightly with proper size nuts, bolts, and washers; execution of complete standard jumpering, binding, and PG clamping work using appropriate conductors to ensure reliable electrical continuity; rate shall be fully inclusive of all structural steel fabrication, hardware, insulation components, handling machinery, tools, tackles, scaffolding, labor, leads, and lifts at any height, complete in all respects as per standard electrical engineering practices under the strict direction and entire satisfaction of the Site In-charge. |
| 157 | Providing and laying Stone Pad base blocks of size 300 mm x 300 mm x 75 mm of approved quality and strength, conforming strictly to RESPO drawings and norms; work includes supply, transportation, storage, necessary excavation or surface preparation, leveling, and dressing of soil, proper positioning, rammed leveling, and alignment of the stone pads beneath poles, structures, or stays to act as a solid bearing foundation, including the cost of all materials, machinery, tools, tackles, handling labor, leads, and lifts at any location, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 158 | Providing and fixing heavy-duty M.S. Holding Clamps fabricated to required profiles and dimensions, complete with matching Nut, Bolt, and Washer assemblies of approved make and size, conforming strictly to RESPO drawings and norms; work includes material supply, transport, proper positioning around poles, structures, or machinery, alignment, and rigid fastening/tightening to specified torque, inclusive of all anti-corrosive primer/paint coatings, necessary tools, tackles, scaffolding, labor, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 159 | Providing and fixing heavy-duty M.S. Clamps fabricated to required design, shape, and dimensions, complete with appropriate size Nut, Bolt, and Washer assemblies of approved make, conforming strictly to RESPO drawings and norms; work includes material supply, transportation, precise positioning, alignment, and rigid tightening around poles, structural members, or equipment, inclusive of rust-preventive primer and paint coatings, all necessary tools, tackles, scaffolding, staging, labor, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 160 | Safe handling, lifting, positioning, and installation of a 100 KVA Distribution Transformer onto an existing LT Sub-Station Double Pole structure or Concrete Plinth, utilizing an appropriate capacity crane, mechanical hoists, or manual labor with all safety equipment; work includes proper alignment, leveling, structural securing, and providing and crimping appropriate sizes of heavy-duty Aluminium Long Barrel Lugs for all HT (High Tension) and LT (Low Tension) terminal connections to ensure low-resistance termination, inclusive of all handling machinery, rigging tools, safety tackles, scaffolding, specialized labor, leads, and lifts at any height, executed complete in all respects as per standard electrical engineering practices and under the strict direction and entire satisfaction of the Site In-charge. |
| 161 | Providing, laying, stringing, testing, and commissioning of XLPE insulated LT Aerial Bunched Cable (ABC) of size 3x120 + 1x95 + 1x16 sq.mm. (comprising three phase conductors, one insulated messenger wire, and one street light conductor) of approved make, conforming strictly to RESPO norms and relevant standard specifications; work includes unrolling, straightening, hoisting, and tensioning of the cable along poles/structures using appropriate sagging equipment, providing and fixing necessary hardware including suspension clamps, dead-end/anchoring clamps, I-hooks, pole brackets, stainless steel strapping with buckles, and insulation piercing connectors (IPCs) for jointing or tapping; scope covers proper dressing, securing, and mid-span clamping to maintain standard clearances, inclusive of all machinery, winches, pulling tackles, scaffolding, safety gear, labor, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 162 | Grouting & fixing of stay rods (20x1800)mm including all work o excavation, cement concrete in size (0.60x0.60xO.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge. |
| 163 | Earthing of supports with MS earth Rod of (20x2500) mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge. |
| 164 | Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballst) Grouting will be done in the block of size (450x450)mm xl/6th o full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge |
| 165 | Wrapping of barbed wire on 11KV ST/PCC poles as anti-climbing device for a length of 0.9mtrs. Wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 mtr from the ground complete, including providing & fixing of lower end & upper end clamps made of M.S. Flat 40X5mm complete with nuts & bolts and all other required material and T&P., as per direction of site inchargc. |
| 166 | Laying , Stringing and final sagging of ACSR Weasel Conductor, as per RESPO[Drawing Norms and as per direction of site incharge. |
| 167 | Erection & Fixing of 11KV Fuse/DO Fuse Set set on PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. |
| 168 | Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 169 | Providing & Fixing of LT fuse set Protection unit for 100 KVA TF with SMC Box including fixing of all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 170 | Erection & Fixing of 11KV TPMO set on PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. |
| 171 | Providing & Fixing of MS ANGLE & MS CHANNEL all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 172 | MS Channel |
| 173 | MS Angle |
| 174 | Jumpering and line energisation work properly as per RESPO Norms and as per direction of site incharge. |
| 175 | INSTALLATION OF 250 KVA ADDITONAL TF IN B.PLAN 2026-27 SCHEME AT VARIOUS SITE OF EDD-GARH, UNDER EDC HAPUR 117, 118, 119,120, 125, 126, 127 |
| 176 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0โ50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 177 | DISC FITTING 45 KN |
| 178 | ACSR WEASEL CONDUCTOR |
| 179 | EARTH ROD |
| 180 | A.B CABLE L.T (3X120+1X95+1X16) SQ MM |
| 181 | D.O FUSE SET |
| 182 | 11 KV TPMO SWITCH |
| 183 | 250 KVA 11/0.4 KV TRANSFORMER NEW |
| 184 | 11 KV COMP. POLY. PIN INSULATOR |
| 185 | PCC POLE 8.5 MTR. |
| 186 | PCC POLE 11 MTR. |
| 187 | STAY SET |
| 188 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 189 | LT ALU. XLPE CABLE 3.5X400 SQ. MM |
| 190 | Erection and fixing of the following materials complete in all respects, including all required T&P, labour, handling, lifting, fastening and allied works for proper installation as per departmental specifications, RESPO norms and directions of the Site In-charge/Engineer-in-Charge. |
| 191 | DISC FITTING 45 KN |
| 192 | 11 KV COMP. POLY. PIN INSULATOR |
| 193 | 11 KV COMP. POLY. DISC INSULATOR 45 KN |
| 194 | Erection of double pole structure with all accessories on PCC Pole 8.5 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. TIF Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing Norms by providing all made o M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site incharge. |
| 195 | Erection of double pole structure with all accessories on PCC Pole 11 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. TIF Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing Norms by providing all made o M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, as per direction of site incharge. |
| 196 | Safely installation of 250 KVA transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge. |
| 197 | Laying of LT ALU. XLPE Cable Al. 3.5x400 sqmm by Porviding al lug and panching with cremping tool Complection work properly, as per RESPO/Norms and as per direction of site incharge. |
| 198 | Laying , Stringing and final sagging of ACSR Weasel Conductor, as per RESPO[Drawing Norms and as per direction of site incharge. |
| 199 | Laying of LT ABC 3x120+1x95+1x16 sqmm by providing suspension Clamp dead end Clamp, I-Hook etc and completion work properly, as per RESPO Norms, and as per direction of site incharge. |
| 200 | Grouting & fixing of stay rods (20x1800)mm including all work o excavation, cement concrete in size (0.60x0.60xO.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, as per direction of site incharge. |
| 201 | Earthing of supports with MS earth Rod of (20x2500) mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts, as per direction of site incharge. |
| 202 | Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballst) Grouting will be done in the block of size (450x450)mm xl/6th o full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge |
| 203 | Construction of TF plinth suitable for 250KVA (size of 2x2x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). 1st class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 are duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour, as per direction o site incharge. |
| 204 | Construction of safety fencing (MS) for Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal anglen-iron to be fitted on vertical posts. Pickets (i required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 75x75x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge. |
| 205 | Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 206 | Erection & Fixing of 11KV Fuse/DO Fuse Set set on PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. |
| 207 | Erection & Fixing of 11KV TPMO set on PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. |
| 208 | Providing & Fixing of stone pad 300x300x75 mm as per RESPO/Drawing Norms and as per direction of site incharge. |
| 209 | Providing & Fixing of Holding Clamp With Nut & Bolt as per RESPO/Drawing Norms and as per direction of site incharge. |
| 210 | Providing & Fixing of ALU. LUG 240 SQ.MM.(LS) OFF SIZE as per RESPO/Drawing Norms and as per direction of site incharge. |
| 211 | Providing, installing, testing, and commissioning of heavy-duty Tail-less Fuse Units (LT distribution/bushing bars) of approved make, rating, and specifications conforming strictly to RESPO norms and standard electrical designs; work includes material supply, hoisting, proper alignment, mounting onto the distribution transformer LT bushings or DP structure steelwork, making solid, low-resistance direct connections, and providing all necessary copper/aluminium links, hardware, nuts, bolts, and washers, inclusive of all safety gear, specialized labor, tools, tackles, leads, and lifts at any height, complete in all respects under the strict direction and entire satisfaction of the Site In-charge. |
| 212 | Providing & Fixing of MS ANGLE & MS CHANNEL all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 213 | Providing, installing, testing, and commissioning of maintenance-free Chemical Earthing System of approved make and design, conforming strictly to RESPO norms, IS 3043, and IEEE 80 standards; work includes augering/boring an earth pit of required diameter and depth, supplying and lowering a high-conductivity Copper-bonded Steel / G.I. Earth Electrode of specified length and diameter, completely backfilling the surrounding void with moisture-retaining, non-corrosive Earth Enhancement Chemical Compound (Bentonite/Carbon based) mixed with water as per manufacturer guidelines, constructing a brick masonry / pre-cast concrete inspection chamber with a heavy-duty CI/concrete cover plate on top, providing an integrated copper/G.I. terminal busbar with required hardware for down-conductor connectivity, and conducting final earth resistance testing to ensure values remain well within permissible electrical limits, inclusive of all excavation, materials, labor, tools, and tackles, complete under the direction and entire satisfaction of the Site In-charge. |
| 214 | Propviding and Intallation all requrment for Earthing of neutral By Boring and lowering of G.I. Pipe size 32 mm dia... into the ground up to water level 80 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will bc bolted to the Nf.S. earth strip for TIF neutral connection, the earth strip '*Vill be welded to the G.l. pipe and neutral earthing support, as per direction of site incharge. |
| 215 | Jumpering and line energisation work properly as per RESPO Norms and as per direction of site incharge. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 ยท All Rights Reserved. Terms of Usage | Privacy Policy