| 1 | Carriage of following material from store center to site of work including loading & unloading at both ends maximum distance up to 60 Km. :- |
| 2 | (A) PCC Pole 11 Mtr. Long |
| 3 | (B) PCC Pole 8.5 mtr long |
| 4 | (C) ACSR Weasal Conductor |
| 5 | (D) 11 KV Pin Insulator with pin |
| 6 | (E) 11 KV Disc Insulator with fitting |
| 7 | (F) LT AB Cable of size 3x120 sq.mm |
| 8 | (G) LT AB Cable of size 3x95 sq.mm |
| 9 | (H) LT PVC Cable of size 1x400 sq.mm |
| 10 | (I) LT PVC Cable of size 3.5x150 sq.mm |
| 11 | (J) 250 KVA T/F 11/0.4V |
| 12 | (K) 100 KVA T/F 11/0.4V |
| 13 | (L) 11 KV Fuse set |
| 14 | (M) Stay set |
| 15 | (N) Earthing rod with GI wire (5 Mtr. Each) |
| 16 | (O) LT Distribution Box |
| 17 | (P) 11 KV TPMO |
| 18 | (Q) GI Wire 6/8 SWG |
| 19 | (R) Earthing Rod with GI wire |
| 20 | Errection PCC Pole 11 mtr long/PCC pole 8.5 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. |
| 21 | Errection of Double PCC Pole 11 mtr long/PCC pole 8.5 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of Soil for each pole including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. |
| 22 | Laying, lifting sagging of LT AB Cable of size 3x120. |
| 23 | Laying, lifting sagging of LT AB Cable of size 3x95. |
| 24 | Laying of ACSR Weasal Conductor for jumpering. |
| 25 | Fixing of LT PVC Cable of size 1x400 & 3.5x150 sq.mm. with complete work as per respo |
| 26 | Fixing of Stay rod complete as per norms. |
| 27 | Fixing of MS Earthing of each 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. |
| 28 | Fixing of 11 KV Pin Insulator with pin |
| 29 | Fixing of 11 KV Disc Insulator with fitting |
| 30 | Making of New 250 KVA T/F Plinth of size 6'x6'x3' (feet) as per respo |
| 31 | New Wiremesh Fencing of 250 KVA T/F with saprate gate and grouting of legs |
| 32 | Water level earthing of 250 KVA T/F as per respo |
| 33 | Safe placing of 250 KVA T/f on newly constructed plinth alongwith connection properly and proper jumpering of HT side and fixing of cable on LT side of T/f |
| 34 | Mounting of 100 KVA T/f with proper jumpering of HT side and fixing of cable on LT side of T/f on double pole |
| 35 | Fixing of 11 KV Fuse Set. |
| 36 | Fixing of 11 KV TPMO |
| 37 | Fixing of GI Wire for Earthing Rod |
| 38 | Fixing of LT Distribution box |
| 39 | Providing and fixing of LT Fuse Box with fuse wire of appropriate size |
| 40 | Providing and Fixing of Alum. Leg long barrel of various size |
| 41 | Providing and Fixing of Lead for connection of LT Distribution box |
| 42 | Providing and fixing of Stone Pad |
| 43 | Providing and fixing of Double circuit Tailless Unit with Fuse Strip wire of appropriate size |
| 44 | Providing and fixing of Danger Board with barbed wire including jumper |
| 45 | Providing and fixing of Copper L-piece 50x225x10mm (LS) |
| 46 | Providing and fixing of Copper L-piece 62x225x12mm (LS) |
| 47 | Grouting of Stay set |
| 48 | Grouting of poles |
| 49 | Providing and Fixing of MS Angle 65x65x6 sq.mm |
| 50 | Providing and Fixing of MS Nut and Bolts. |
| 51 | Providing and Fixing of various size of LT & 11 KV Clamps with nut and bolt |
| 52 | Providing and Fixing of Dropper Channel. (100x50x2028 mm.) |
| 53 | Providing and Fixing of Top channel. (125x65x2240 mm.) |
| 54 | Providing and Fixing of T-Off channel. |
| 55 | Providing and Fixing of LT Piercing connector of various size |
| 56 | Back Cartage of 100 KVA T/f (old & used) site to store centre meerut Please Enable Macros to View BoQ information |