|
| 1 | Safe carriage of the following Centralised material from any Store Centre of PVVNL/Baghpat/Baraut to work site /JE store with loading & unloading at both ends respectively. |
| 2 | PCC Pole 11 MTr |
| 3 | PCC Pole 8.5 MTr |
| 4 | ABC cable 3x120+1x95+1x16 sq mm |
| 5 | 33 KV 3x300 XLPE Cable |
| 6 | H/S O/D 33 KV 3x300 sqmm J/kit |
| 7 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 8 | Stay Set Complete 16x1800 |
| 9 | 33 KV VCB 800A, 750MVA |
| 10 | 33 kv Fuse Set |
| 11 | 33 KV TPMO |
| 12 | 33 KV CT |
| 13 | 33 KV PT |
| 14 | Battery Set |
| 15 | Battery Charger |
| 16 | 11 kv VCB Incoming 600/300/5A 350 MVA |
| 17 | 11 kv VCB Outgoing 200/100/5A 350 MVA |
| 18 | 11 KV Disc Insulator T&C type 4500kg. |
| 19 | 11 KV Disc Fitting T&C type 4500kg. |
| 20 | 11 KV Pin insulator (Polymeric) with Nut |
| 21 | 33 kv Disc Fitting for drop B&S type |
| 22 | 33 kv Disc Insulator B&S Polymeric Type |
| 23 | 33 KV Line Isolator 800 A |
| 24 | 33 KV Lightening Arrestor |
| 25 | 11 KV fuse Set |
| 26 | 11 KV TPMO With Polymeric Insulator |
| 27 | control Cable 4x2.5 sqmm2 |
| 28 | control Cable 2x2.5 sqmm2 |
| 29 | Polymeric 33KV Pin Insulator |
| 30 | ACSR Dog Condutor |
| 31 | ACSR Weasel Conductor |
| 32 | ACSR Rabbit Conductor |
| 33 | 11 kv V Type Cross Arm 65x65x6 mm, MS Angle |
| 34 | 11/0.4 KV T/F 25 KVA |
| 35 | 11/0.4 KV T/F 100 KVA |
| 36 | 33 KV X arm |
| 37 | 11 kv XLPE Cable 3x300 sqmm |
| 38 | 11 kv Cable Joint Kit 3x300 I/D |
| 39 | 11 kv Cable Joint Kit 3x300 I/D |
| 40 | Proper Installation/Fabrication/laying/fixing/binding etc. of the above and Following Centralised Material With proper connection including All the Accessories and complete work in all respect (as per resspo norms and site requirement) (All work in the Contractor Scope with Carriage of material to different work site including loading & unloading at both ends respectively). |
| 41 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 08.5 Mtr AND 9 MTR PCC POLE . |
| 42 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 11 Mtr. |
| 43 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |
| 44 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |