| 1 | Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. |
| 2 | STP / PCC Pole 11 /8.5 mtr long |
| 3 | 33KV/11 KV X-arm |
| 4 | Stay Set Complete |
| 5 | 33 KV/11KV XLPE Cable 3x300 sq.mm |
| 6 | 33 KV/ 11KV Cable Jointing Kit 3x300 sq.mm |
| 7 | 33 kv/ 11KV Pin Insulator with Pin |
| 8 | 33 kv /11 KV Disc Insulator with Fitting |
| 9 | Earthing Rod Complete |
| 10 | ACSR DOG Conductor |
| 11 | G.I WIRE 6 SWG |
| 12 | 11 KV VCB |
| 13 | Errection PCC Pole 11 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting of the pole with proper ramming after completion of work. |
| 14 | Laying of 33 XLPE/11KV Cable 3x300 sq.mm |
| 15 | Laying of ACSR DOG Conductor |
| 16 | Fixing of 33 KV Pin Insulator with fitting |
| 17 | Fixing 33 kv Disc Insulator with Fitting |
| 18 | Fixing of 33 KV/11KV X-arm V type |
| 19 | Fixing of 33 KV Jointing Kit 3x300 sq.mm |
| 20 | Fixing of Stay set for 33 kv & 11 kv complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 21 | Fixing of MS Earthing rod of each 33 kv & 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. |
| 22 | Fixing of 11 KV X-arm |
| 23 | Providing and fixing Holding Clamp |
| 24 | Providing and fixing Stone Pad |
| 25 | Providing and fixing F bracket |
| 26 | Grouting of Pole |
| 27 | Grouting of Stay |
| 28 | Providing and fixing of MS Nut and bolts |
| 29 | Providing and fixing of F clamp for Top Insulator |
| 30 | Laying & Fixing of G.I Wire 6 SWG |
| 31 | Installation and commissioning of 11 KV VCB . |
| 32 | Supply and Erection of Water level Earthing by Boring and lowering by Providing of G.I. Pipe size 40 mm dia, into the ground upto water level or minimum 20 Mtr, which ever is more, with the lower end of solid copper cone Approx 224 mm long and 750 gm in weight shall be provided and screwed in pipe as well bringing out a continuous copper wire 6 swg, from the cone upto he ground surface where it will be bolted to the G.I. Strip for Transformer nuetral connection, the G.I Strip will be connected to star point through providing Copper Bond Strip of size- 35x6 mm, as per Pvvnl Guidline. |
| 33 | Back Carriage of old and defective 11 KV VCB . |
| 34 | Providing and laying of Control Cable 2x2.5 sqmm Please Enable Macros to View BoQ information |