Name of Work:- fo|qr forj.k [k.M & izFke cMkSr ds v/khu fo|qr forj.k mi[k.M & izFke cMkSr ds {ks= esa fctusl Iyku okZ 2026&27 ds vUrxZr fofHkUu enksa esa Lohd`r 30 ua0 dk;Z o vU; lEcfU/kr dk;ZA
Sl. No.
Item Description
1
Safe carriage of the following Centralised material from any Store Centre of PVVNL/Baghpat/Baraut to work site /JE store with loading & unloading at both ends respectively.
2
PCC Pole 8.5 Mtr
3
PCC Pole 11 Mtr
4
11 KV Cable Jointing Kit (3x300 mm) outdoor
5
11 kv Cross Arm
6
33 kv Cross Arm
7
11 KV Disc fitting
8
11 KV Disc Insulator T&C type 4500kg.
9
11 KV fuse Set
10
11 KV Pin insulator (Polymeric) with Nut
11
11 KV TPMO With Polymeric Insulator
12
11 kv VCB Incoming 600/300/5A 350 MVA
13
LT XLPE Cable Al 1x400 sq mm
14
LT XLPE Cable Al 1x120 sq mm
15
11 kv VCB Outgoing 200/100/5A 350 MVA
16
11/0.4 KV T/F 100 KVA
17
11/0.4 KV T/F 250 KVA
18
11/0.4 KV T/F 25 KVA
19
ABC cable 3x95+1x70+1x16 sq mm
20
ABC cable 3x120+1x95+1x16 sq mm
21
ACSR Weasel Conductor
22
ACSR Dog Conductor
23
Distribution Box Three Phase
24
Complete Earthing
25
LT PVC Cable Al 3.5x150/70 sq mm
26
Stay set Complete 16x1800
27
33KV XLPE Cable 3x300 sq mm
28
Proper Installation/Fabrication/laying/fixing/binding etc. of the above and Following Centralised Material With proper connection including All the Accessories and complete work in all respect (as per resspo norms and site requirement) (All work in the Contractor Scope with Carriage of material to different work site including loading & unloading at both ends respectively).
29
Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 08.5 Mtr AND 9 MTR PCC POLE .
30
Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 11 Mtr.
31
Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information
32
Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.