| 1 | Safe carriage of the following Centralised material from any Store Centre of PVVNL/Baghpat/Baraut to work site /JE store with loading & unloading at both ends respectively. |
| 2 | PCC Pole 8.50 Mtr |
| 3 | PCC Pole 11 Mtr |
| 4 | PCC Pole 09 Mtr |
| 5 | 11 KV Cable Jointing Kit (3x300 mm) outdoor |
| 6 | 11 kv Cross Arm |
| 7 | 33 kv Cross Arm |
| 8 | 11 KV Disc Insulator T&C type 4500kg. |
| 9 | 33 KV Disc Insulator Dropper B&S Type. |
| 10 | 33 KV Disc Insulator B&S Fitting |
| 11 | 11 KV Disc Insulator T&C type with Fitting |
| 12 | 11 KV fuse Set |
| 13 | 33 KV Pin insulator (Polymeric) |
| 14 | 11 KV Pin insulator (Polymeric) with Nut |
| 15 | 11 KV TPMO With Polymeric Insulator |
| 16 | 11 kv VCB Incoming 600/300/5A 350 MVA |
| 17 | 11 kv VCB Outgoing 200/100/5A 350 MVA |
| 18 | 11/0.4 KV T/F 63 KVA |
| 19 | 11/0.4 KV T/F 100 KVA |
| 20 | 11/0.4 KV T/F 250 KVA |
| 21 | 33 KV CT |
| 22 | 33 kv Fuse Set |
| 23 | 33 KV PT |
| 24 | 33 KV VCB 800A, 750MVA |
| 25 | Battery Set |
| 26 | Battery Charger |
| 27 | 33 kv Lightening Arrestor |
| 28 | ABC cable 3x95+1x70+1x16 sq mm |
| 29 | ABC cable 3x120+1x95+1x16 sq mm |
| 30 | ACSR Rabbit Conductor |
| 31 | ACSR Weasel Conductor |
| 32 | ACSR Dog Conductor |
| 33 | control Cable 4x2.5 sqmm2 |
| 34 | control Cable 2x2.5 sqmm2 |
| 35 | Distribution Box Three Phase |
| 36 | Complete Earthing of pole by MS earthing rod of 20x2500mm and 6 SWG Earthing wire etc |
| 37 | LT Xlpe cable Al 1x400 sqmm. |
| 38 | LT Xlpe cable Al 1x240 sqmm. |
| 39 | LT Xlpe cable Al 1x120 sqmm. |
| 40 | LT PVC Cable Al 3.5x70 sq mm |
| 41 | Stay set Complete 16x1800 |
| 42 | 11 kv XLPE Cable 3x70 sq mm |
| 43 | 11 kv XLPE Cable 3x185 sq mm |
| 44 | Proper Installation/Fabrication/laying/fixing/binding etc. of the above and Following Centralised Material With proper connection including All the Accessories and complete work in all respect (as per resspo norms and site requirement) (All work in the Contractor Scope with Carriage of material to different work site including loading & unloading at both ends respectively). |
| 45 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 08.5 Mtr AND 9 MTR PCC POLE . |
| 46 | Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms.PCC Pole 11 Mtr. |
| 47 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |
| 48 | Double pole structure with ST/PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of double pole For HT/LT Line and complete work as per RESSPO Norms.PCC 8.5Mtr/PCC 11Mtr./PCC 9Mtr/STP 11Mtr/STP 13Mtr Pole Please Enable Macros to View BoQ information |