| 1 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 60M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches. |
| 2 | Ordinary Centering and shuttering for R.C.C or CC work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. |
| 3 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For Base concrete etc. Including cost of all Materials, Labour, T&P. etc. Complete. |
| 4 | R.C.C. (M-25 grade) 1:1:2 In Abutment, Pier, slab, Floor wearing coat etc. Including cost of all materials, labour and T&P etc. all completion of work. |
| 5 | C.C. (M-20 grade) 1:1.5:3 In Toe wall, CC blocks, wings wall. Including cost of all materials, labour and T&P etc. all completion of work. |
| 6 | Laying Non cohesive/Cohesion less (ordanary sand) back filling adjoing the RCC structure. including cost of all labour and T&P.etc. complete. |
| 7 | Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete. |
| 8 | Supplying and Fixing 100 MM dia 0.60 M Length G.I Pipe in draining Spoit I/C Cost of all Materials , labour, T&P etc. required for proper complition of work. |
| 9 | Supply and Laying Settlement Joint with G.P/Copper/Stainless Steel water stop including cost of all labour and T&P etc.Complete. |
| 10 | Providing & fixing 225MM wide water stop seal including cost of all Material,labour and T&P etc. Complete. |
| 11 | Providing weep holes in abutment and wing wall including cost of all labour, material and T&P etc Completion of work as per directed by the Engineer in Charge. |
| 12 | Supplying & laying of Graded Gravel (Sgingle) in filter(20-40 mm) in layer i/c all cost of labour material T&P etc complete |
| 13 | Supplying & laying of Graded Gravel (Sgingle) in filter(4-20 mm) in layer i/c all cost of labour material T&P etc complete |
| 14 | Supplying & laying of Coarse sand in filter in layer i/c all cost of labour material T&P etc complete. |
| 15 | Filling up sealing compound or making contraction joint including cost of all Material,labour and T&P etc. Complete. |
| 16 | Earth work in back filling lead upto 1.00 km by power transport i/c cost of all materials, labour, T&P etc. required for proper completion of work. |
| 17 | Supply and Laying of R.B.M.i/c cost of all materials, labour, T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information |