| 1 | CONSTRUCTION OF R.C.C DRAIN WITH COVER AND P.C.C FROM SHILA DEVI HOUSE TO SANJAY GUPTA AT WARD NO 18 UNDER NAGAR PARISHAD GUMLA |
| 2 | Labour for cleaning the worksite before and after work etc. |
| 3 | Dismantling RCC work including staaking servicable materials & countable stacks within 15m lead &disposal of unservicable material within all complete as per the direction of E/I. |
| 4 | Earthwork in excavation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M including all lifts levelling,ramming the foundation trenches ,removing roots of tree,shrubs all complete as per approved design , building specification and direction of E/i. |
| 5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all lifts including cost of all materials, labour ,royalty and taxes all complete as per building specification and direction of E/I .(Mode of measurment compacted volume) |
| 6 | Supplying and laying ( properly as per design and drawing )rip-rap with good quality of boulders duly packed including the cost of materials , royality all taxes etc. But excluding the cost of carriage all complete as per specification and direction of E/I. |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone - iii) : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 9 | centering and shuttering including strutting, proping etc. and removal of form for foundation, footings, bases of columns, etc for mass concrete |
| 10 | Providing tor steel reinforcement of 10 mm, 12mm ,16mm dia. Rods as per approved design and drawing excluding carriage of bars to work site including cutting , bending , binding with anneled wire with coast of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. ( Valid for TATA/SAIL (5.5.5)1.25% =0.54 M3= 4240KG |
| 11 | 10 MM (60%) |
| 12 | 12MM (40%) |
| 13 | P/F on wall face unplasticised rigid PVC rain water pipe conffirming of IS: 133592 of 75 mm dia . |
| 14 | CARRIAGE OF MATERIALS |
| 15 | sand( lead upto 20 km) |
| 16 | stone chips (lead upto 7 km) |
| 17 | steel( lead upto 1 km) |
| 18 | Cement ( lead upto 1 km) |
| 19 | BOULDER(LEAD UPTO 7KM) |
| 20 | Add 18 % GST |
| 21 | Adding Labour Cess @ 1% of Estimated Cost |
| 22 | Add Silanyas/Udghatan & Sign Board Please Enable Macros to View BoQ information |