| 1 | clearing grass and removal of rubish upto a distance of 50m outside the pheriphery of the area |
| 2 | Dense graded Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen profile 5% of DBM |
| 3 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with Modified Graded Packed Bitumen. |
| 4 | providing and applying prime coat with ss1 grade bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying..do.do |
| 5 | Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) |
| 7 | Solar Powered Road Marker (Solar Stud) Supplying ofSolar Raised Pavement Markers made of polycarbonatemolded body with circular shape, solar powered, LED selfillumination in active mode 360 degree illumination andreflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lensface in passive mode.The marker shall support a load of..DO.DO |
| 8 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks with in 15 M.lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 9 | Earthwork in excavation in foundation trenches do--do-- complete job. |
| 10 | Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve at crusher |
| 11 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 14 | providing Tor steel reinforcement as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. |
| 15 | 8mm dia |
| 16 | 10mm dia |
| 17 | Carrige of Materials: |
| 18 | (A) Sand - 35KM |
| 19 | (B) S/Chips- 20 KM |
| 20 | (C)S/dust 20 KM |
| 21 | Add : Goods & Services Tax (G.S.T.) - 18% |
| 22 | Add : Labour Cess - 1% |
| 23 | Add: cost of sign board and photography Please Enable Macros to View BoQ information |