| 1 | CONSTRUCTION OF PCC ROAD FROM BHATA ORAON HOUSE TO KAMLANAND PUBLIC SCHOOL AT WARD NO 19 AND FOR CONSTRUCTION OF R.C.C DRAIN WITH COVER AT NIRMAL GUPTA HOUSE TO CHAIRMAN GALI AT WARD NO 8 UNDER NAGAR PARISHAD GUMLA |
| 2 | PCC ROAD FROM BHATA ORAON HOUSE TO KAMLANAND PUBLIC SCHOOL AT WARD NO 19 |
| 3 | Labour for cleaning the worksite before and after work etc. |
| 4 | Dismantling plain cement or lime concrete work including staaking servicable materials & countable stacks within 15m lead &disposal of unservicable material within all complete as per the direction of E/I. |
| 5 | Earthwork in excavation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M including all lifts levelling,ramming the foundation trenches ,removing roots of tree,shrubs all complete as per approved design , building specification and direction of E/i. |
| 6 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all lifts including cost of all materials, labour ,royalty and taxes all complete as per building specification and direction of E/I .(Mode of measurment compacted volume) |
| 7 | Supplying and laying ( properly as per design and drawing )rip-rap with good quality of boulders duly packed including the cost of materials , royality all taxes etc. But excluding the cost of carriage all complete as per specification and direction of E/I. |
| 8 | Providing P.C.C 200 M in nominal mix of ( 1:1.5:3)in foundation with approved quality of stone chips 20 mm to 6 mm size grade and clean coarse sand of F.M 2.5 to 3 including screening , shuttering mixing cement concrete in mixer and placing in position , vibrating , striking , curing taxes and royalty all complete as per building specification and direction of E/I. |
| 9 | centering and shuttering including strutting, proping etc. and removal of form for foundation, footings, bases of columns, etc for mass concrete |
| 10 | Back earth filling in foundation trenches and plinth in layer nit exceeding 150mm..do…do…all complete job. |
| 11 | CARRIAGE OF MATERIALS |
| 12 | sand( lead upto 20 km) |
| 13 | stone chips (lead upto 7 km) |
| 14 | Cement ( lead upto 2 km) |
| 15 | STONE (lead up to 8km) |
| 16 | R.C.C Drain with cover at nirmal gupta house to chairman gali at ward no 8 |
| 17 | Labour for cleaning the worksite before and after work etc. |
| 18 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 19 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 20 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 21 | Earthwork in excavation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M including all lifts levelling,ramming the foundation trenches ,removing roots of tree,shrubs all complete as per approved design , building specification and direction of E/i. |
| 22 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all lifts including cost of all materials, labour ,royalty and taxes all complete as per building specification and direction of E/I .(Mode of measurment compacted volume) |
| 23 | Providing Designation 75B one brick flate soling joint filled with local sand including cost of taxes watering royalty all complete as per building specification and direction of E/I. |
| 24 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone - iii) : 3 graded stone aggregate 20 mm nominal size) |
| 25 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone - iii) : 3 graded stone aggregate 20 mm nominal size) SLAB |
| 26 | centering and shuttering including strutting, proping etc. and removal of form for foundation, footings, bases of columns, etc for mass concrete |
| 27 | Providing tor steel reinforcement of 10 mm, 12mm ,16mm dia. Rods as per approved design and drawing excluding carriage of bars to work site including cutting , bending , binding with anneled wire with coast of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. ( Valid for TATA/SAIL (5.5.5)@ 1.25 % |
| 28 | 8mm( 45%) |
| 29 | 10 mm( 45%) |
| 30 | 12 mm (10%) |
| 31 | P/F on wall face unplasticised rigid PVC rain water pipe conffirming of IS: 133592 of 75 mm dia . |
| 32 | CARRIAGE OF MATERIALS |
| 33 | sand( lead upto 20 km) |
| 34 | stone chips (lead upto 7 km) |
| 35 | steel( lead upto 1 km) |
| 36 | Cement ( lead upto 1 km) |
| 37 | Bricks( lead upto 8 km) |
| 38 | Add 18 % GST |
| 39 | Adding Labour Cess @ 1% of Estimated Cost |
| 40 | Add Silanyas/Udghatan & Sign Board Please Enable Macros to View BoQ information |