| 1 | LT Line Improvement & Strengthening Related Works- |
| 2 | Cartage of line material from Central Store to JE’s Store and later on to site of works on day to day basis as per site requirement such as 11 KV Cross Arms, 11 KV Pin with insulator, 11 KV Disc Insulators, ACSR Conductor, GI Wire, MS Angle & MS Channel All Line Material etc. |
| 3 | Cartage of PCC Pole ( 8.5 Meter ) from central store to JE Store with loding/unloading and from JE store to work site with loading/unloading etc. |
| 4 | Cartage of PCC Pole ( 11 Meter ) from central store to JE store with loding/unloading and from JE store to work site with loading/unloading etc. |
| 5 | Erection of 8.5 meter PCC Pole as single support for LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 6 | Erection of 11 meter PCC Pole as single support for LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 7 | Providing & Fixing of Dead & Clamp with I hook |
| 8 | Providing & Fixing of Distribution Box with clamp |
| 9 | Providing & Fixing of Suspension Clamp with I hook |
| 10 | Providing & Fixing of all types of Clamps as per site requirement |
| 11 | Providing and Fixing Concreting of pole/stay |
| 12 | Laying of ABC cable Overhead of different size as per site requirement |
| 13 | Laying, Lifting, Stringing of proper sagging of ACSR Dog for 4 Phase 4 wire LT Line including binding |
| 14 | Fixing of 11 KV V type Steel Cross Arm, Pin, Disc, fitting etc |
| 15 | Providing of earthing rods and Earthing of poles with earthing rod complete in all respect. |
| 16 | Providing & Fixing LT piercing Connector all size |
| 17 | Providing & Fixing of Distribution Connecting lead |
| 18 | Providing & Fixing of Nut & Bolt. |
| 19 | Fixing of LT Sakle Insulator with nuts. |
| 20 | Cartage of Dismantled All line material from site to JE store and JE Store to Central Store |
| 21 | Feeder Bifurcation Related Works- |
| 22 | Cartage of 11 KV PCC/ST Poles from central store to JE Store and later on JE Store to different work sites with loading / Unloading at both ends. |
| 23 | Cartage of different line materials , 11 KV Pin/ Insulator, Disc insulators, 11 KV XLPE Cable etc from central store to JE Store and later on JE Store to different work sites with loading / Unloading at both ends. |
| 24 | Erection of 11 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 25 | Erection of Double Pole on STP Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work. |
| 26 | Laying of 11 KV XLPE cable Underground in trench of different size as per site requirement including binding etc. |
| 27 | Providing & Fixing of HDPE Pipe for laying 11 KV XLPE Cable |
| 28 | Laying of 11 KV XLPE cable Overhead of different size as per site requirement including binding etc. |
| 29 | Providing and filling of 11 KV XLPE CABLE Jointing kits properly.. |
| 30 | Fixing of 11 KV Insulator with nuts. |
| 31 | Fixing of 11 KV Disc Insulator with fitting nuts. |
| 32 | Providing, Mounting and fixing of G I pipe in the 11 KV cables and binding on the poles properly.. |
| 33 | Grouting/Concreting of Poles in ratio 1:4:8 |
| 34 | Cartage of 11 KV VCB from central store to JE Store and later on JE Store to different work sites with loading / Unloading at both ends. |
| 35 | installation of 11 KV VCB by making connection through Lead/Cable properly. |
| 36 | Earthing & Grauting of each 11 KV Line Pole properly after drive of electrodes of size 20mmx250mm and connection the earthing point with GI Wire. |
| 37 | Providing / fixing of MS Bolts / Nuts off sizes. |
| 38 | Providing and Fixing of Number & Danger Plate |
| 39 | Providing & Fixing of GI pipe 6 and 8 swg wire, Al. binding wire |
| 40 | Water level earthing of neutral and body of distribution transformers of 11/0.4 kv transformers by boaring of earth upto water level (15 to 20 Mtr.) and lowering of GI Pipe 32 mm dia upto water level and connecting the same by ms flate of size 40x4 mm with transformers. The transformer will be earthed properly including/cutting, jointing, welding etc. of MS Earth Strip and connecting one earthing with the neutral bushing of transformer and other to the body of transformer at several points. The GI Pipes will be connected to each other with the help of G.I. Sockets and a cap will be provided on the upper part of the G.I. Pipe for pouring of water during summer season. |
| 41 | Providing and Fixing Holding Clamps |
| 42 | Laying /Fixing of Weasel Conductor |
| 43 | Laying /Fixing of Dog Conductor |
| 44 | Providing & Fabrication and fixing of Channel ,Angle as per site requirement . |
| 45 | Fixing of O/D Jointing kit suitable for 11 XLPE cable. |
| 46 | Fabrication and fixing of MS Angle (65x65x6) mm bracing with clamp and MS Channel, fixing of all 11 KV Accessories & Base Channel. |
| 47 | Fabrication and fixing of Topper & Droper MS Channel & MS Angle (65x65x6) mm bracing with clamp, fixing of all 11 KV Accessories & Base Channel. |
| 48 | Laying & fixing of line material like cross arm/channel etc. |
| 49 | Laying & fixing of 11KV E-brackets |
| 50 | Laying & fixing of Clamp & lugs |
| 51 | 11 KV Line Improvement & Strengthening Related Works- |
| 52 | Cartage of ST/PCC Pole (11 mter 70 No and 8.5 Meter 02 No. ) from central store to JE Store with loding/unloading and from JE store to work site with loading/unloading etc. |
| 53 | Cartage of line Material from Central Store to JE store and JE store to different work site including loading & unloading at both ends. |
| 54 | Erection of 11 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 55 | Erection of 8.5 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 56 | Laying /Fixing of Dog Conductor |
| 57 | Laying /Fixing of Weasel Conductor |
| 58 | Laying of 11 KV XLPE cable Underground in trench of different size as per site requirement including binding etc. |
| 59 | Providing & Fixing of HDPE Pipe for laying 11 KV XLPE Cable |
| 60 | Laying of 11 KV XLPE cable Overhead of different size as per site requirement including binding etc. |
| 61 | Providing of MS earth electrodes and making earthing etc of poles. |
| 62 | Providing and filling of 11 KV XLPE CABLE Jointing kits properly.. |
| 63 | Fixing of 11 KV Insulator with nuts. |
| 64 | Fixing of 11 KV Disc Insulator with fitting nuts. |
| 65 | Fixing of 11 KV V Type Steel Cross Arm |
| 66 | Providing of earthing rods and Earthing of poles with earthing rod complete in all respect. |
| 67 | Grouting/Concreting of poles |
| 68 | Providing & Fabrication and fixing of Channel ,Angle as per site requirement . |
| 69 | Providing and Fixing of all type off size Clamps(suspension,Dead end ,Holding,J-Huk) as per site requirement. |
| 70 | Providing and Fixing Nut and Bolts off size. |
| 71 | Providing & Fixing of GI pipe 6 and 8\\" Inch |
| 72 | Providing & Fixing of GI wire of 6 SWG & 8 SWG |
| 73 | Erection of Stay Rod complete after digging of pit of required size and grouting the same in block of size 0.60 x0.60x 0.30 Mtr. and nuzzling at the both ends and filling the pit with excavated Earth soil with proper ramming. |
| 74 | Fabrication and fixing of MS Angle mm bracing with clamp and MS Channel, fixing of all 11 KV Accessories & Base Channel. As per site requirement. |
| 75 | Providing and Fixing of Number & Danger Plate |
| 76 | Providing and Fixing GI Barbed Wire (as per site requirement) |
| 77 | Cartage of Dismantled All line material from site to JE store. Please Enable Macros to View BoQ information |