| 1 | Taking out existing unserviceable/serviceable CI/MS/GI/PVC/CPVC/UPVC Pipe 300 mm bore dia from the trenches including disconnecting branch connections, fittings and control valves complete all as specified and directed (Excavation and earth work shall be measured and paid for separately). |
| 2 | All as per srl item No 1 above but 250mm bore complete all as specified and directed. |
| 3 | All as per srl item No 1 above but 200mm bore ccomplete all as specified and directed. |
| 4 | All as per srl item No 1 above but 150mm bore complete all as specified and directed. |
| 5 | All as per srl item No 1 above but 100mm bore complete all as specified and directed. |
| 6 | All as per srl item No 1 above but 80mm bore complete all as specified and directed. |
| 7 | Supply and laying Mild steel pipe 300mm bore IS-3589(1981) with 6mm thickness (ERW) with all fittings such as MS flanged , gasket with required no of holes, MS connecting piece suitable size of nut and bolts and washers, MS bends, connecting piece etc complete all as specified & directed |
| 8 | Supply and laying DI K 9 tubings medium grade dia ISI Mark with all fittings such as elbow, bends, sockets, nipples and union etc and fixed complete laid in trench for the 150 mm dia including taking down complete all as specified and directed. |
| 9 | All as per item No 8 above but 200 DI K-9 tubings medium grade complete all as specified and directed. |
| 10 | All as per item No 8 above but 150 mm bore GI tubings medium grade complete all as specified and directed. |
| 11 | All as per item No 8 above but 100mm bore GI tubings medium grade complete all as specified and directed. |
| 12 | All as per item No 8 above but 80mm bore GI tubings medium grade complete all as specified and directed. |
| 13 | Supply and fix Foot valve for 200 mm dia including GI flanged Bolts/Nuts/washers gasket etc all and removal of old valve and fixed complete all as specified and directed. |
| 14 | All as per item No 13 above but 150 mm bore pipe complete all as specified and directed. |
| 15 | All as per item No 13 above but 100 mm bore pipe complete all as specified and directed. |
| 16 | All as per item No 13 above but 80 mm bore pipe complete all as specified and directed. |
| 17 | Supply and fix Air Release valve for 150mm bore of pipe including GI flanged Bolts/Nuts/washers gasket etc all and removal of old valve and fixed complete all as specified and directed. |
| 18 | All as per item No 17 above but 80 mm bore pipe complete all as specified and directed. |
| 19 | All as per item No 17 above but 50 mm bore pipe complete all as specified and directed. |
| 20 | Supply and fix Non Return Valve for 300 mm dia including GI flanged Bolts/Nuts/washers gasket etc all and removal of old valve and fixed complete all as specified and directed. |
| 21 | All as per item No 20 above but 200 mm bore pipe complete all as specified and directed. |
| 22 | All as per item No 20 above but 150 mm bore pipe. complete all as specified and directed. |
| 23 | All as per item No 20 above but 100 mm bore pipe complete all as specified and directed. |
| 24 | All as per item No 20 above but 80 mm bore pipe. complete all as specified and directed. |
| 25 | Excavating in trenches n exe 1.5 m wide and not exceeding 1.5 m in depth and getting out in hard/dense soil for laying of GI pipe complete all as specified and directed. |
| 26 | Returning filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm in soil complete all as specified and directed. |
| 27 | Removing excavated soil to a distance not exc 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. |
| 28 | Material and labour for heavy duty sluice valve 300mm bore complete with iron wheel conforming to IS 1969,PN 1.6 of double flanged and drilled end provided with high tensile steel spindle including GI flanged Bolts/Nuts/washers gasket etc all and removal of old valve complete all as specified and directed |
| 29 | All as per item No 28 above but 250 mm bore pipe complete all as specified and directed. |
| 30 | All as per item No 28 above but 200 mm bore pipe complete all as specified and directed. |
| 31 | All as per item No 28 above but 150 mm bore pipe complete all as specified and directed. |
| 32 | All as per item No 28 above but 100 mm bore pipe complete all as specified and directed. |
| 33 | All as per item No 28 above but 80 mm bore pipe complete all as specified and directed. |
| 34 | Material and labour for heavy duty butterfly valve 150mm bore complete with iron wheel conforming to IS 1969,PN 1.6 of double flanged and drilled end provided with high tensile steel spindle including GI flanged Bolts/Nuts/washers gasket etc all and removal of old valve complete all as specified and directed. |
| 35 | All as per item No 34 above but 100 mm bore pipe complete all as specified and directed. |
| 36 | All as per item No 34 above but 80 mm bore pipe complete all as specified and directed. |
| 37 | All as per item No 34 above but 50 mm bore pipe complete all as specified and directed. |
| 38 | Repair to foot valve 200 mm bore in position by replacement of UNSV parts such as Brass ring packing/Rubber packing , nuts, bolts, washers rubber insertion sheet complete all as required to make it functional complete all as specified & directed. |
| 39 | Repair to foot valve 150 mm bore in position by replacement of UNSV parts such as Brass ring packing/Rubber packing , nuts, bolts, washers rubber insertion sheet complete all as required to make it functional complete all as specified & directed . |
| 40 | Material and labour for valve chamber on existing chamber foundation with 230mm thick brick wall in CM 1:4, 75mm thick coping in PCC 1:2:4 (Type B1), 15mm thick plaster in CM 1:4 over all internal and external wall surface, 25x25x4mm thick MS Angle iron frame and 3.0 mm thick MS sheet cover with hinges and necessary locking arrangements painting with two coats of synthetic enamel paint over one coat of red oxide primer all as specified and directed including dismantling and removal of existing damaged chamber except PCC foundation complete all as specified and directed of following internal size :- |
| 41 | 600 x 600 x 600mm |
| 42 | 900 x 900 x 900mm |
| 43 | 1000 x1000 x 1000mm |
| 44 | M & L for Pipes galvanized, \\" Medium class\\" , supplied and laid complete including fittings in trenches/ on walls/ on floors etc, as required for 40 mm bore complete all as specified and directed. |
| 45 | M & L for Pipes galvanized, \\" Medium class\\" , supplied and laid complete including fittings in trenches/ on walls/ on floors etc, as required for 50 mm bore complete all as specified and directed. |
| 46 | Cutting of existing 50 mm dia GI pipe in position for inserting new Tee/short pieces of required size including complete all as specified and directed. |
| 47 | Cutting/removing of bushes/small trees/vegetation growth upto a distance of appx 50 mtr around the UG sump,OHT,Pump house not exc 30cms deep incl drains all around the plant incl rough surface leveling/cutting,filling upto 12\\" height/ depth all around the plant and burning at a distance of 50mtr (minimum) in the presence of Engr-in-charge including sprinkling the round up chemicals for drying/killing the bushes,shrubs etc. complete all as specified and directed. |
| 48 | Material and labour for rubber ring tyton joint suitable for CI cast iron cenrtigugally cast socket and spigot end pipe of 200mm dia complete all as specified and as directed. |
| 49 | Material and labour for rubber ring tyton joint suitable for CI cast iron cenrtigugally cast socket and spigot end pipe of 300 mm dia complete all as specified and as directed. |
| 50 | M&L for Bends (any type, radius and angle) tapers any type, (straight, bend, increasing, decreasing or double socket etc.) Tee pieces single branch. \\"Y\\" junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs upto 100 mm to 300mm complete all as specified and directed. |
| 51 | M & L for Mild steel plates, plain or chequered, 5mm thick Gde-E-250) Quality-A or over in thickness in available sizes for use as duct covers as per existing size including taking out of old one complete all as specified and directed. |
| 52 | Demolition of Concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 53 | M&L Providing Cement concrete in roof kerb or mud stops,rounded or chamfered on edges mm graded (12.5 mm) aggregate type B0 1:2:4 in roof kerbs or mud stops, rounded or chamfered on edges complete all as specified and directed. |
| 54 | Supply and fixing in repalacement water level indicator electronic type suitable for over head tank(OHT) and UG sumps incl provn of PVC Copper cable 0.5 sqmm 10 core(approx 150M) from OHT to Pump House(Existing Sources) and water level sensor 07 Nos complete set including taking out old unserviceable water level indicator complete all as specified and directed. Please Enable Macros to View BoQ information |