| 1 | Precision Air Conditioning System (13 Tr) At Data Centre 2 (Terminal 3) |
| 2 | Supply of PAC( 13 TR) as per tender spec |
| 3 | ITC of PAC( 13 TR) as per tender spec |
| 4 | Supply of Lowside works for PAC( 13 TR) |
| 5 | ITC of Lowside works for PAC( 13 TR) |
| 6 | Dismantling of existing PACs, including Outdoor Units |
| 7 | Precision Air Conditioning System (6 Tr) At DR (ATC Building) |
| 8 | Supply of PAC( 6 TR) as per tender spec |
| 9 | ITC of PAC( 6 TR) as per tender spec |
| 10 | Supply of Lowside works for PAC( 6 TR) |
| 11 | ITC of Lowside works for PAC( 6 TR) |
| 12 | Dismantling of existing PACs, including Outdoor Units |
| 13 | Intelligent Power Distribution Unit(iPDU) |
| 14 | Supply of iPDU as per tender spec |
| 15 | ITC of iPDU as per tender spec |
| 16 | Equipment Rack and TAP-OFF BOXES |
| 17 | SITC of Equipment Rack (42 U) |
| 18 | SITC of TAP-OFF BOXES |
| 19 | Very Early Smoke Detection Apparatus(VESDA) System in a Data Centres |
| 20 | Supply of VESDA System for DC 1 & DC 2 |
| 21 | ITC of VESDA System for DC 1 & DC 2 |
| 22 | Supply of VESDA System for DR |
| 23 | ITC of VESDA System for DR |
| 24 | Water Leak Detection System in a Data Centres |
| 25 | Supply of Water Leak Detection System for DC 1 & DC 2 |
| 26 | ITC of Water Leak Detection Systemfor DC 1 & DC 2 |
| 27 | Supply of Water Leak Detection System for DR |
| 28 | ITC of Water Leak Detection System for DR |
| 29 | Air Purification System in a Data Centres |
| 30 | Supply of Air Purification System for DC 1, DC 2 & DR |
| 31 | ITC of Air Purification System |
| 32 | Data Centre Infrastructure Management (DCIM) System |
| 33 | Supply of DCIM Hardware |
| 34 | ITC of DCIM Hardware |
| 35 | Supply of DCIM Software |
| 36 | ITC of DCIM Software |
| 37 | SITC of monitoring nodes with License |
| 38 | Fire Alarm & Suppression Systems for DC 1 & DC 2 |
| 39 | SITC of Gas Release Panel |
| 40 | SITC of Cylinder(80 Litre) |
| 41 | SITC of Clean Agent |
| 42 | SITC of Master Multi Cylinder Kit |
| 43 | SITC of Slave Cylinder Kit |
| 44 | SITC of Manifold Assembly |
| 45 | SITC of Non-Return Valves (NRVs) |
| 46 | SITC of Pressure switch |
| 47 | SITC of Abort Switch |
| 48 | SITC of Manual Release switch |
| 49 | SITC of Conventional Multi detector |
| 50 | SITC of Response Indicator |
| 51 | SITC of Hooter cum strobe |
| 52 | SITC of Copper armoured Cable |
| 53 | SITC of Cylinder Strap |
| 54 | Miscellaneous Items(Like Sign Stickers, packing charges & Modification of existing of MS seamless pipe) |
| 55 | FIRE ALARM & SUPPRESSION SYSTEMS for DR |
| 56 | SITC of Gas Release Panel |
| 57 | SITC of Cylinder(80 Litre) |
| 58 | SITC of Clean Agent |
| 59 | SITC of Master Multi Cylinder Kit |
| 60 | SITC of Slave Cylinder Kit |
| 61 | SITC of Manifold Assembly |
| 62 | SITC of Non-Return Valves (NRVs) |
| 63 | SITC of Pressure switch |
| 64 | SITC of Abort Switch |
| 65 | SITC of Manual Release switch |
| 66 | SITC of Conventional Multi detector |
| 67 | SITC of Response Indicator |
| 68 | SITC of Hooter cum strobe |
| 69 | SITC of Copper armoured Cable |
| 70 | SITC of Cylinder Strap |
| 71 | Miscellaneous Items(Like Sign Stickers, packing charges & Modification of existing of MS seamless pipe) |
| 72 | Buy back of existing PACs and Fire Suppression System at DC 2 and DR. |
| 73 | Comprehensive Annual Maintenance Contract for 2 years, inclusive of spares and accessories. AMC starts after the warranty period of 5 year. All amounts in Rs are inclusive of all taxes, levies, transportation, etc. |
| 74 | 1st Year Manpower Charges |
| 75 | 2nd Year Manpower Charges |
| 76 | 3rd Year Manpower Charges |
| 77 | 4th Year Manpower Charges |
| 78 | 5th Year Manpower Charges |
| 79 | 6th Year Manpower Charges |
| 80 | 7th Year Manpower Charges |
| 81 | 1st Year Maintenance Charges |
| 82 | 2nd Year Maintenance Charges |
| 83 | 3rd Year Maintenance Charges |
| 84 | 4th Year Maintenance Charges |
| 85 | 5th Year Maintenance Charges |
| 86 | 6th Year CAMC |
| 87 | 7th Year CAMC Please Enable Macros to View BoQ information |