| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Providing one Driven Earth using earth pipe of size 38.1mm dia2.5m length including digging separate pit at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP including conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading charges |
| 5 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. |
| 6 | Providing one Earth using GI earth pipe of size 40mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. (excludes cost of earthpipe, earthchamber and covering slab). |
| 7 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials |
| 9 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing) |
| 10 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 11 | Fitting and erecting one HT A type pole in position including fitting cross arm, digging and back filling pit in ordinary soil (as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 12 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 13 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 14 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 15 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision for earthing |
| 16 | Drilling hole of various sizes on existing Channel/Cross arm |
| 17 | Fitting and providing one HT Fly stay for 11KV Pole using HT PSC pole including. digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthing (excluding provision for earthing) |
| 18 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil |
| 19 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 20 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 21 | Dismantling one damaged HT PSC/RCCStrut pole including removal of clamps and stacking. |
| 22 | Additional rate for providing one Disc set PG clamp etc complete on any type of HT pole for making cut point |
| 23 | Provding WP support with PSC pole including digging & backfilling pit in ordinary soil excluding transportation of poles |
| 24 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 25 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 26 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 27 | Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials. |
| 28 | Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance ofall materials. |
| 29 | Reshackling one span LT OH Additionalconductor including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials complete. |
| 30 | Re-joining one snapped LT conductor after removing damaged portion includingReshackling and conveyance of all materials complete. |
| 31 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 32 | Stringing of one km 3 ph 11 kV line with XLPE insulated ACSR Racoon or equivalent ( 3 conductors) after fitting insulators ,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree brancxhes whereever necessary excluding cut points |
| 33 | Transferring LT three ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 34 | Transferring LT single ph 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 35 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint.The size of the number should be at least2cm in height x 1.5cm in width. including cost of paint. |
| 36 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 37 | Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 38 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 39 | Renewal of existing damaged/old 11kVPSC/RCC DP with new 'A' type DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles. |
| 40 | Dismantling one section fuse from structure and bringing back to section store. |
| 41 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 42 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 43 | Additional rate for excavation of Pit for 'A'type pole in Hard Laterite. |
| 44 | Fitting and providing one Strut using 'A' type pole, including digging and back filling pit in ordinary soil. |
| 45 | Providing bridging at Cut points for 3 PH11kV line with XLPE Insulated ACSR Raccoon or equalant (1 conductors) using IPC and respective conductors |
| 46 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carrying up to 2 drum including loading and unloading using crane Please Enable Macros to View BoQ information |