| 1 | CONSTUCTION OF DRAINAGE |
| 2 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means |
| 3 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 4 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 |
| 5 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer |
| 6 | 12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork) |
| 7 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 8 | OD72478/2024-2025:Supplying and laying interlocking tile 60mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete. |
| 9 | OD72479/2024-2025:Providing and fixing of rolled steel eaqual angle s ize 25mmx 25mm x5 mm having a weight of 1.8 kg /m welded on a frame of 200 mm x 200 mm made of rolled steel eaqual angle of ISA 2525 for Gretings on drainage walls including cost of screens and welding tubes fixed in position etc. complete |
| 10 | 8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer . |
| 11 | 8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 |
| 12 | OD90274/2024-2025:Providing and fixing cattele grid with ISMC 400 to form an outer frame and ISA 40/40 with 3.5 kg/mtr welded inside the frame at a spacing of 2.5cm outer to outer including cost of welding,materials, labour etc Please Enable Macros to View BoQ information |