|
| 1 | Renovation of Open well |
| 2 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 3 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 4 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 6 | OD517503/2025-2026:Random Rubble masonry in cement motor 1:8 for top belt of retaining wall including simultaneous pointing to be exposed faces of masonry labour charges cost and conveyance materials etc. complete as per the direction of departmental officers at site |
| 7 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 8 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 9 | OD519703/2025-2026:Engaging Coolie |
| 10 | Pipe laying |
| 11 | OD441931/2025-2026: Excavating trenches of required width for pipes ,cables etc including excavation forsockets and dressing of sides ,ramming of bottoms,depth upto 1.5m,including getting out the excavated soiland then returning the soil as required,in layers not exceeding 20cm in depth including consolidating eachdeposited layer by ramming,watering etc and disposing of surplus excavated soil as directed,within a lead of50m.All kinds of soil.pipes,cables etc not exceeding 80mm dia (2.10.1.1 modified |
| 12 | OD519673/2025-2026:Supplying and fixing PVC pipes of ISI marked 50 mm dia 10 kgf/cm2 includingjointing of pipes with one step PVC solvent cement testing of joints including cost of specialsetc.. complete as per direction of Engineer in charge. |
| 13 | OD519688/2025-2026:Supplying and fixing 50 mm PVC Ball Valve of good quality as per directions ofdepartmental officers at site |
| 14 | OD519693/2025-2026:Supplying and fixing PVC pipes of 50MM 6kg including specials from the stackingplace at site with solvent cement etc., lovering in to the trenches already made, placing in position, aligningthe pipe line to the line and level jointing the pipe and specials with solvent cement and testing the pipe linewith water to the required test pressure, including hire charges for all tools testing equipments cost andconveyance of water etc.. complete Please Enable Macros to View BoQ information |