| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Dismantling one section fuse from distribution box and bringing back to section store. |
| 3 | Erection of suspension clamp for LT ABC of any size |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 5 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 6 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 7 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 8 | Fitting and erecting one HT Double PoleStructure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 9 | Installing One No. Insulation piercing connector of size Main : 16 to 95 , Tap:1.5 to 16 Sq.mm |
| 10 | Dismantling of 1.1 KV Aerial buncged Cable of size 3 x 70 + 1 x 16 (street light) + 1 x 50 Sq.mm. (insulated Messenger) |
| 11 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 12 | Dismantling of Anchor clamp / dead end clamp for LT AB Cable |
| 13 | Dismantling of suspension clamp suitable for LT AB cable |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Fitting and providing one HT stay for 11KV pole including digging and back filling pit in ordinary soil |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the grounf for earthing excluding provision for earthing |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Installing One No. 4 way Satellite Connector of size Main : 16 to 95 , Tap:4 to 35 Sq.mm to the LT AB cable of standard size |
| 19 | Installation of Insulation piercing connector for main to service line main : 16-95 sqmm, Tap 16-95 |
| 20 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 21 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials. |
| 22 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line reconnecting the same after completing the line work |
| 23 | Additional rate refitting/redoing shackle Set including reshackling one span while renewing any type of LT pole |
| 24 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 25 | Fitting one set (3No.) 11kV LA and givingconnections excluding earthing. |
| 26 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 27 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 28 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 29 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 30 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling treesincluding cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 31 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 32 | Fitting one additional section Fuse unit and giving connection from Transformer to fuse and Distribution to LT OH line |
| 33 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 34 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 + 1 x 50 sqmm with bare/insulated Messenger through existing poles |
| 35 | Erection of Anchor clamp dead end clamp for LT ABC of any size |
| 36 | Stringing of one km 3 PH 11 kV line with XLPE insulated ACSR Racoon or equivalent ( 3 conductors) after fitting insulators,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 37 | Providing bridging at Cut points for 3 PH11kV line with XLPE Insulated ACSR Raccoon or equalant (1 conductors) using IPC and respective conductors |
| 38 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and lettersshould be in black synthetic enamel paint.The size of the number should be at least2cm in height x 1.5cm in width. including cost of paint |
| 39 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 40 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 41 | Additional rate for excavation of one Pit for HT pole/ HT stay in hard laterite |
| 42 | Additional rate for excavation of one Pit for HT pole/ HT stay in soft rock Please Enable Macros to View BoQ information |