|
| 1 | Earthwork in Excavation in dry soil with manual labour ive disposal of earth, labour, T&P etc. for complettion of work |
| 2 | Brick ballast M-15, 4.00 CM gauge all material, labour and T&P etc. |
| 3 | C.C. 1:2:4 (M-15)with stone ballast 10 to 20 mm/ cum i/e all cost of material, labour. T&P ete for proper completion of work/cum |
| 4 | R.C.C. 1:1:2 (M-25) i/e all cost of material, labour. T&P etc for proper completion of work |
| 5 | Providing & laying Wearing Coat with 1:1.5:3 cement concrete i/c all cost of material, labour T&P etc complete. |
| 6 | Supplying and filling brick bats |
| 7 | Steel Reinforcement (TMT) i/e cost of material labour. T & P etc for proper completion of work |
| 8 | Providing and fixing P.V.C. pipe 75mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc. |
| 9 | Laying R.cc hume pipe 1200 mm dia including labour, T&P etc. complete. |
| 10 | E/W for making diversion & ramp on both side of bridge by power transport |
| 11 | Providing and laying brick on edge soling (Kharanja) |
| 12 | S/F marble year plate i/c writing |
| 13 | Finishing parapet wall with Weather Paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour,T&P |
| 14 | S/I graded filter in layers with all cost of lead and lift in all complete work |
| 15 | S/F wheel gaured of stone size 150x150x600mm with all cost of material in all complete work |
| 16 | Dismentling on edge soiling in all complete work |
| 17 | Excavation for diversion of drain all cost of lead and lift in all complete work |
| 18 | E/W in removing road diversion and bundh after completion f work it will bw used in all complete work |
| 19 | E/W in silt clearance slush and lahel clearnce i.c all lift and lead dressing |
| 20 | Dwatering by 7.5 HP pump for E/w in foundation Laying cc & RCC in foundation in all complete work |
| 21 | Add 18%GST Please Enable Macros to View BoQ information |