| 1 | Detail of Work |
| 2 | Providing and fixing of Electronic (E/F/& O/C PROTECTION lRELAY Complete. |
| 3 | Safely Carriage of 33 KV CT 200/100/1A/400/200/1A from ESC SRE to site of work including loading and unloading at both ends (distance 40 KM) |
| 4 | Safely Carriage of 11 KV Outgoing VCB 200/100/5A/11 KV Incomming VCB 300/600/5A from ESC SRE to Site of work including loading and unloading at both ends. |
| 5 | Safely Carriage of 33 KV VCB 800 A from ESC SRE to Site of work including loading and unloading at both ends. |
| 6 | Safely Carriage of 33 KV Control Pannel for Double T/F from ESC SRE to Site of work including loading and unloading at both ends. |
| 7 | Safely Carriage of 33 KV Control Pannel for Single T/F from ESC SRE to Site of work including loading and unloading at both ends. |
| 8 | Safely Carriage of 11 KV CT 200/100/5A from ESC SRE to site of work including loading and unloading at both ends (distance 40 KM) |
| 9 | Safely Carriage of Control Cable 4x2.5/2x2.5 from ESC SRE to site of work including loading and unloading at both ends (distance 40 KM) |
| 10 | Safely Carriage of Batter Set 1 No (24 Volt) & Battery Charger 1 No (24 Volt ) from ESC SRE to site of work including loading and unloading at both ends (distance 40 KM) |
| 11 | Safely Carriage of 11 KV XLPE Cable 3x300 sq.mm from ESC SRE to site of work including loading and unloading at both ends (distance 40 KM) |
| 12 | Providing and fixing of 11 KV CT 200/100/5A with polymer pin insulator and connection properly. |
| 13 | Safely Installation of 11 KV Outgoing VCB/Incomming VCB and connection properly. |
| 14 | Safely Installation of Battery Charger (24 Volt). |
| 15 | Safely Installation of Battery Set (24 Volt). |
| 16 | Safely Installation of 33 KV VCB 800A and connection properly. |
| 17 | Safely Installation of 33 KV Control Pannel for Double T/F and connection properly. |
| 18 | Safely Installation of 33 KV Control Pannel for Single T/F and connection properly. |
| 19 | laying of Control Cable 4x2.5 sq.mm |
| 20 | laying of Control Cable 2x2.5 sq.mm |
| 21 | laying of 11 KV XLPE Cable 3x300 sq.mm |
| 22 | Safely Fixing of 11 KV Jointing Kit siz 3x300 indoor type |
| 23 | Safely Fixing of 11 kV Jointing Kit siz 3x300 Outdoor type |
| 24 | Safely installation of 33 KV CT (200/100/1-1-1A) /(400/200/1A) and connection properly. |
| 25 | Water Earthing of 10 MVA T/F by boring of 60 Ft deep & fixing of 60 ft. G.I pipe 11/2\\" Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the 10 MVA T/F providing of required charcoal & salt in the pipe |
| 26 | Repairing of Plinth of Power T/F |
| 27 | To remove power T/F form Plinth for rapair of Plinth and put on again at rapaired pilinth. |
| 28 | Providing of LT Busing Rod |
| 29 | To change LT busing Rod, Open 08 MVA T/F & after work completion securing it back |
| 30 | Providing, Fixing and Changing LT Copper Bus Bar |
| 31 | Delta Earthing of 08 MVA T/F |
| 32 | Repairing of Plinth of Power 08 MVA T/F |
| 33 | Providing and installation of WTI Meter and OTI Mter For Power T/F |
| 34 | Safely removal of old and used LT Bushing Road (01 No) & Old and Damage Copper Bus Bar (03 No) from Site to ESC SRE including loading and unloading at both ends. |
| 35 | Safely removal of old and used 11 KV O/G and I/C VCB from Site to ESC SRE including loading and unloading at both ends. |
| 36 | Safely removal of old and used 33 KV VCB from Site to ESC SRE including loading and unloading at both ends. |
| 37 | Safely removal of old and used 33 KV Control Pannel for Double T/F from Site to ESC SRE including loading and unloading at both ends. |
| 38 | Safely removal of old and used Relay from site to ESC SRE including loading and unloading at both ends. |
| 39 | Safely removal of 11 KV CT 200/100/5A from site to ESC SRE including loading and unloading at both ends. |
| 40 | Safely removal of 33 KV CT from site to ESC SRE including loading and unloading at both ends. |
| 41 | Safely removal of WTI and OTI Meter from site to ESC SRE including loading and unloading at both ends. |
| 42 | Safely removal of Batter Set (24 Volt) & Battery Charger (24 Volt ) from site to ESC SRE including loading and unloading at both ends. Please Enable Macros to View BoQ information |