| 1 | The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Aonla, Bareilly Approx. distance upto 100 Km. Including safe loading and unloading. |
| 2 | PCC Pole 8.5 Mtr |
| 3 | PCC Pole 9 Mtr |
| 4 | PCC Pole 11 Mtr |
| 5 | ACSR Weasal |
| 6 | ACSR DOG Conductor |
| 7 | 33 KV XLPE 3x300 Sq Mm |
| 8 | Outdoor 33 KV Jointing Kit Sutable for 33 KV XLPE Cable 3x300 sqmm |
| 9 | Straight Through 33 KV Jointing Kit Sutable for 33 KV XLPE Cable 3x300 sqmm |
| 10 | 33 KV PT |
| 11 | 33 KV Line Isolator |
| 12 | 33 KV Bus Isolator |
| 13 | 33 KV Lightening Arrestor |
| 14 | Battery Set (12 Cell, 2 V, 200AH) |
| 15 | Battery Charger |
| 16 | 33 KV Double Transformer Control Panel |
| 17 | Other Line material |
| 18 | Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms |
| 19 | PCC Pole 8.5 Mtr (Single) |
| 20 | PCC Pole 9 Mtr (Single) |
| 21 | PCC Pole 11 Mtr (Single) |
| 22 | Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
| 23 | PCC Pole 8.5 Mtr (Single) |
| 24 | PCC Pole 9 Mtr (Single) |
| 25 | PCC Pole 11 Mtr (Single) |
| 26 | The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms |
| 27 | Laying, Stringing & Sagging of Following Conductor complete in all respect |
| 28 | ACSR Weasal |
| 29 | ACSR DOG Conductor |
| 30 | The work of digging of pits, erection of Stay Clamp, Insulator etc. |
| 31 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. |
| 32 | Under Ground Laying of 33 KV XLPE Cable 3x300 sqmm by HDD Method in as per norms complete in all respect |
| 33 | Under Ground Laying of 33 KV XLPE Cable 3x300 sqmm by digging trench method as per norms complete in all respect |
| 34 | Supply & Laying of 6\\" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6\\" would be Provided by contractor at his own cost) |
| 35 | Supply & Laying of HDPE Pipe 140 mm at various places i.e road crossing & Hoisting etc. complete in all respect ((HDPE pipe 140 mm would be Provided by contractor at his own cost) |
| 36 | Filling of Outdoor/Straigh Through Cable Jointing Kit suitable for 33 KV 3x300 sqmm Xlpe Cable complete in all respect |
| 37 | 33 KV Cable Fault Location Detection by Fault Loacator Machine complete in all respect |
| 38 | Installation/Errection/Fixing of 33 KV PT as per norms complete in all respect |
| 39 | Installation/Errection/Fixing of 33 KV Bus Isolator as per norms complete in all respect |
| 40 | Installation/Errection/Fixing of 33 KV Line Isolator as per norms complete in all respect |
| 41 | Installation/Errection/Fixing of 33 KV Lightening Arrestor as per norms complete in all respect |
| 42 | Installation/Errection/Fixing of 33 KV Double Transformer Control Panel as per norms complete in all respect |
| 43 | Installation of Battery Set/ Battery Charger as per norms complete in all respect |
| 44 | Supply & Fixing of Over current Earthfault Relay 1/5 Amp as per norms complete in all respect |
| 45 | Supply & Fixing of WTI as per norms complete in all respect |
| 46 | Supply & Fixing of OTI as per norms complete in all respect |
| 47 | Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost) |
| 48 | Stone Pad 300x300x75 mm |
| 49 | Holding Clamp for T Off, Cross Arm and Expouser Pole |
| 50 | Danger Board |
| 51 | Barbed Wire |
| 52 | 33 KV F-Bracket |
| 53 | 11 KV F-Bracket Please Enable Macros to View BoQ information |