|
| 1 | The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Baheri, Bareilly Approx. distance upto 100 Km. Including safe loading and unloading. |
| 2 | PCC Pole 8.5 Mtr |
| 3 | PCC Pole 9 Mtr |
| 4 | PCC Pole 11 Mtr |
| 5 | AB Cable 3x95 sqmm |
| 6 | ACSR Weasal Conductor |
| 7 | ACSR DOG Conductor |
| 8 | 11 KV XLPE 3x120 Sq Mm |
| 9 | 11 KV XLPE 3x185 Sq Mm |
| 10 | 33 KV XLPE 3x300 Sq Mm |
| 11 | Outdoor 11 KV Jointing Kit Sutable for 11 KV XLPE Cable 3x120 sqmm |
| 12 | Outdoor 11 KV Jointing Kit Sutable for 11 KV XLPE Cable 3x185 sqmm |
| 13 | Intdoor 11 KV Jointing Kit Sutable for 11 KV XLPE Cable 3x185 sqmm |
| 14 | Outdoor 33 KV Jointing Kit Sutable for 33 KV XLPE Cable 3x300 sqmm |
| 15 | 33 KV PT |
| 16 | 33 KV CT |
| 17 | 33 KV Lightening Arrestor |
| 18 | Battery Set (12 Cell, 2 V, 200AH) |
| 19 | Battery Charger |
| 20 | 33 KV Double Transformer Control Panel |
| 21 | Other Line material |
| 22 | Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms |
| 23 | PCC Pole 8.5 Mtr (Single) |
| 24 | PCC Pole 8.5 Mtr (Single) |
| 25 | PCC Pole 9 Mtr (Single) |
| 26 | PCC Pole 11 Mtr (Single) |
| 27 | PCC Pole 11 Mtr (Double) |
| 28 | Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
| 29 | PCC Pole 8.5 Mtr (Single) |
| 30 | PCC Pole 8.5 Mtr (Single) |
| 31 | PCC Pole 9 Mtr (Single) |
| 32 | PCC Pole 11 Mtr (Single) |
| 33 | PCC Pole 11 Mtr (Double) |
| 34 | The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms |
| 35 | Laying, Stringing & Sagging of Following Conductor complete in all respect |
| 36 | ACSR Weasal Conductor |
| 37 | ACSR DOG Conductor |
| 38 | AB Cable 3x95 sqmm |
| 39 | The work of digging of pits, erection of Stay Clamp, Insulator etc. |
| 40 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. |
| 41 | Construction of T/F plinth 2x2x1 m3 or Minimum 4 Cubic Meter (As per Site Requirement) for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect |
| 42 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) or Minimum 200 Sq Feet (As per Site Requirement)by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
| 43 | Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE) |
| 44 | Under Ground Laying of 11 KV XLPE Cable 3x120 sqmm in double circuit in as per norms complete in all respect |
| 45 | Under Ground Laying of 11 KV XLPE Cable 3x185 sqmm in Single circuit in as per norms complete in all respect |
| 46 | Gaurding as per norms complete in all respect |
| 47 | Under Ground Laying of 33 KV XLPE Cable 3x300 sqmm by digging trench method as per norms complete in all respect |
| 48 | Hoisting of 11 KV XLPE Cable Size 3x120 sqmm size on double pole with GI pipe of size 6 \\" dia including the jumpering complete with clamps , nut and bolts. |
| 49 | Hoisting of 11 KV XLPE Cable Size 3x185 sqmm size on double pole with GI pipe of size 6 \\" dia including the jumpering complete with clamps , nut and bolts. |
| 50 | Hoisting of 33 KV XLPE Cable Size 3x300 sqmm size on double pole with GI pipe of size 6 \\" dia 4 Mtr long including the jumpering complete with clamps , nut and bolts. |
| 51 | Supply & Laying of 6\\" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6\\" would be Provided by contractor at his own cost) |
| 52 | Supply & Laying of HDPE Pipe 140 mm at various places i.e road crossing & Hoisting etc. complete in all respect ((HDPE pipe 140 mm would be Provided by contractor at his own cost) |
| 53 | Filling of Outdoor Cable Jointing Kit suitable for 11 KV 3x120 sqmm Xlpe Cable complete in all respect |
| 54 | Filling of Outdoor/Indoor Cable Jointing Kit suitable for 11 KV 3x185 sqmm Xlpe Cable complete in all respect |
| 55 | Filling of Outdoor/Straigh Through Cable Jointing Kit suitable for 33 KV 3x300 sqmm Xlpe Cable complete in all respect |
| 56 | Installation/Errection/Fixing of 33 KV PT as per norms complete in all respect |
| 57 | Installation/Errection/Fixing of 33 KV CT as per norms complete in all respect |
| 58 | Installation/Errection/Fixing of 33 KV Lightening Arrestor as per norms complete in all respect |
| 59 | Installation/Errection/Fixing of 33 KV Double Transformer Control Panel as per norms complete in all respect |
| 60 | Installation of Battery Set/ Battery Charger as per norms complete in all respect |
| 61 | Supply & Fixing of Over current Earthfault Relay 1/5 Amp as per norms complete in all respect |
| 62 | Supply & Fixing of WTI/OTI as per norms complete in all respect |
| 63 | Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost) |
| 64 | MS Nut & Bolt off Different Size with washer |
| 65 | Holding Clamp for S/s with Bolt & Nut |
| 66 | 11 KV F Clamp With Nut & Bolt |
| 67 | 33 KV F Clamp With Nut & Bolt |
| 68 | 11 KV X Arm Holding Clamp |
| 69 | 11 KV X Arm Holding Clamp with Nut & Bolt |
| 70 | PG Clamp |
| 71 | Stone Pad 300x300x75 mm |
| 72 | Number Plate |
| 73 | Bots & Nut |
| 74 | Danger Board With Clamp |
| 75 | Barbed Wire |
| 76 | Piercing Connector |
| 77 | Suspension Clamp |
| 78 | J Hook |
| 79 | Dead End Clamp |
| 80 | Eye Hook |
| 81 | LT Clamp with Nut & Bolt |
| 82 | Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto100 Km including loading & unloading. |
| 83 | Scarp Please Enable Macros to View BoQ information |