| 1 | STRENTHNING OF 33 KV LINE B.PLAN 2026-27 SCHEME AT VARIOUS SITE OF EDD-HAPUR, UNDER EDC HAPUR (3 No. Work) (DPR N0. 13, 14, 15) |
| 2 | Carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0–50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 3 | PCC Pole 11.0M Long |
| 4 | 33 KV XLPE Cable 3x300 sqmm |
| 5 | 33 KV Termination Kit 3x300 sqmm O/D |
| 6 | 33 KV Polymeric Pin insulator with pin |
| 7 | 33KV V-Type Cross arm |
| 8 | Earthing Complete |
| 9 | Erection and fixing of the following materials as per relevant RESPO/departmental norms and specifications, including proper installation, alignment, tightening, and commissioning at site. the scope of work includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, and complete site restoration, along with responsibility of the contractor for obtaining necessary permissions, resolving Right of Way (ROW) issues, and completing the work as per directions of Engineer-in-Charge |
| 10 | 33 KV XLPE Cable 3x300 sqmm |
| 11 | 33 KV Termination Kit 3x300 sqmm O/D |
| 12 | 33 KV Polymeric Pin insulator with pin |
| 13 | 33KV V-Type Cross arm |
| 14 | Earthing Complete |
| 15 | Erection and fixing of pole structure for PCC Pole 11 mtr 33 KV HT line including excavation of suitable size pits, providing and fixing of insulators, and complete installation of all requisite accessories strictly as per RESPO drawings/standard norms; including providing and fixing of holding clamps made of M.S. flat of size 50×6 mm with suitable nuts & bolts, alignment, tightening and all allied works; the scope of work includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, formation of pits, and complete site restoration; the contractor shall also be responsible for obtaining all necessary permissions, resolving Right of Way (ROW) issues, and completing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 16 | Grouting of PCC Pole 11 mtr supports in CC 1:4:8 (cement, sand & 40 mm brick ballast) in block size 450×450 mm up to 1/6th depth of full length of support below ground level and 300 mm above ground level (plinth), using CC 1:4:8 (cement, coarse sand and stone grit) including mufting as per approved drawing; the work shall include excavation, backfilling, proper ramming, and curing complete in all respects with all required materials; the scope further includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, and complete site restoration; the contractor shall also be responsible for obtaining necessary permissions, resolving Right of Way (ROW) issues, and executing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 17 | Laying of 33 kV HT XLPE cable of size 3×300sq.mm underground through manual method digging briks and sands, including proper dressing and positioning of cable, leaving adequate spare cable in loop shape at both ends as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, cable pulling equipment, alignment, safety arrangements and all allied works and materials will be provided by contractor; measurement shall be made on actual length of cable laid at site and payment shall be made accordingly as per departmental standards and directions of the Engineer-in-Charge. |
| 18 | Providing and laying of 140 mm dia (O/D) PN-4, PE-80 grade, UV stabilized HDPE pipe in standard lengths (6 m each) by HDD method for laying of underground cable, complete in all respects as per relevant IS specifications and directions of the Site In-charge; the scope of work includes formation of entry and exit pits, drilling with suitable machinery and drilling fluid, alignment, jointing, insertion of pipe, protection of existing utilities, and complete site restoration; the work also includes cost of all labour, tools & plants (T&P), machinery, materials, safety arrangements and all allied works required for proper execution; the contractor shall be responsible for obtaining necessary permissions, resolving Right of Way (ROW) issues, and completing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 19 | Laying of 33 kV HT XLPE cable of size 3×300sq.mm including proper dressing and positioning of cable, leaving adequate spare cable in loop shape at both ends as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, cable pulling equipment, alignment, safety arrangements and all allied works and materials will be provided by contractor; measurement shall be made on actual length of cable laid at site and payment shall be made accordingly as per departmental standards and directions of the Engineer-in-Charge. |
| 20 | Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs, Nut and Botls as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. only earth rod and GI wire will be provided by department. |
| 21 | Providing and fixing of all types of clamps including F-type clamps, holding clamps, cross-arm clamps, etc., along with suitable nuts & bolts, complete in all respects strictly as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, alignment, tightening, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 22 | Providing and fixing of M.S. Channel 100x50x5mm and M.S. Angle 65x65x6mm complete in all respects, including proper mounting, alignment and tightening with all required accessories, strictly as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 23 | M.S. Channel 125x65x6mm |
| 24 | M.S. Angle 65x65x6mm |
| 25 | Providing and fixing of stone pad complete in all respect, including supply of approved quality stone pad, necessary excavation, dressing, leveling, proper positioning, packing with sand/soil, and all labour, tools, plants, and materials required for satisfactory completion of work as per departmental specifications and directions of Engineer-in-Charge. |
| 26 | safe de-erection and dismantling of existing/old electrical materials at site, including careful removal without damage to reusable items, and carriage of dismantled materials from site of work to Electricity Store Centre, Hapur, with loading and unloading at both ends over kachha and pakka roads, strictly as per directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, transportation, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 27 | INSTALLATION OF INCREASING CAP. 100-250 KVA DT IN B.PLAN 2026-27 SCHEME AT VARIOUS SITE OF EDD-I HAPUR, UNDER EDC HAPUR (10 No. Work) (DPR N0. 476, 477, 478, 482, 483, 485, 487, 492, 496 & 581 ) |
| 28 | Safe carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0–50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 29 | PCC Pole 8.5M Long |
| 30 | 11/0.440 KV 250 KVA DT |
| 31 | LT AB CABLE 3x120+1x95+1x16 sqmm |
| 32 | LT PVC Alu. 1X240 sqmm |
| 33 | LT PVC Alu. 3.5X400 sqmm |
| 34 | 11KV Polymeric Pin insulator with pin |
| 35 | 11KV Disc insulator T&C Type 45 KN with Fitting |
| 36 | Earthing Complete |
| 37 | Stay Set Complete |
| 38 | 11 Fuse Set |
| 39 | Erection and fixing of Double pole structure for PCC Pole 8.5 mtr 11KV HT line including excavation of suitable size pits, providing and fixing of shackle insulators, and complete installation of all requisite accessories strictly as per RESPO drawings/standard norms; including providing and fixing of holding clamps made of M.S. flat of size 35×5 mm with suitable nuts & bolts, alignment, tightening and all allied works; the scope of work includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, formation of pits, and complete site restoration; the contractor shall also be responsible for obtaining all necessary permissions, resolving Right of Way (ROW) issues, and completing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 40 | Grouting of PCC Pole 8.5 mtr supports in CC 1:4:8 (cement, sand & 40 mm brick ballast) in block size 450×450 mm up to 1/6th depth of full length of support below ground level and 300 mm above ground level (plinth), using CC 1:4:8 (cement, coarse sand and stone grit) including mufting as per approved drawing; the work shall include excavation, backfilling, proper ramming, and curing complete in all respects with all required materials; the scope further includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, and complete site restoration; the contractor shall also be responsible for obtaining necessary permissions, resolving Right of Way (ROW) issues, and executing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 41 | Providing and fixing of M.S. Channel 100x50x5mm and M.S. Angle 65x65x6mm complete in all respects, including proper mounting, alignment and tightening with all required accessories, strictly as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 42 | Providing and fixing of all types of double pole clamps including, holding clamps, top channel clamps, dropper channel clamps etc., along with suitable nuts & bolts, complete in all respects strictly as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, alignment, tightening, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 43 | Providing and fixing of follwings petty meterial as per as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, alignment, tightening, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 44 | Barbed wire |
| 45 | 11 KV Danger Board |
| 46 | Providing & Fixing of high quality long barrel Al. lugs off size. Each lug must be crimp by proper crimping tool as per RESPO/Drawing Norms and as per direction of site incharge. |
| 47 | Providing & Fixing of high quality Henley type tailless unit protection cubical panel 500A, 650V for 250 KVA DT including fixing of all accessories by providing all required materials such as long barrel lugs, glands, nuts & bolts etc.) each lug must be crimp by proper crimping tool as per RESPO/Drawing Norms and as per direction of site incharge. |
| 48 | Erection & Fixing of 11KV D.O. fuse set Protection unit for 250 KVA DT including fixing of all accessories by providing all required materials (like suitable lugs, nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 49 | Safely installation of 11/0.440 KVA 250 DT with the help of crane/manual labour at LT Sub-Station Double Pole by providing proper size aluminium Long barel lug for HT/LT as per direction of site incharge. |
| 50 | Laying of LT ABC 3x120+1x95+1x16 sqmm using suspension clamps, I-hook and dead end clamp inculding jumpering work with peircing connector, cable connection with distribution box for proper completion of work as per RESPO Norms, and as per direction of site incharge. |
| 51 | Erection and laying of LT PVC Alu. 1X240 sqmm inculding proper connection with long barrel lug, proper 3 nos crimping on each lug, LT fuse set/SMC box for proper completion of work as per RESPO Norms, and as per direction of site incharge. |
| 52 | Fixing and Grauting of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works and materials will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. only stay set and stay wire will be provided by department. |
| 53 | Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs, Nut and Botls as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. only earth rod and GI wire will be provided by department. |
| 54 | Providing and erection of Chemical Earthing for neutral of DT with GI strip 50x6mm including excavation of pit and using necessary chemical and electrode to obtain results ≤ 1 ohm, 3M apart from support, below the ground level and connection below the earth electrodes with the help of G.I. strip & earthing lugs, Nut and Bolts as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. |
| 55 | Providing & Fixing of coper L-Piece 50x225x10 mm (LS) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 56 | Providing & Fixing of coper L-Piece 50x225x10 mm (LS) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 57 | Construction of TIF plinth suitable for 250KVA (size of 2x2x 1.5 mtr.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). 1st class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 are duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour, as per direction o site incharge. |
| 58 | Provinding & fixing of safety fencing (MS) for 11/0.4 KV, 250KVA DT, With supply of material required for MS fencing upto DT upper level by constructing 1 feet masnary wall with bricks & 4x8 feet frames bolted and welded alongwith, the constrution of frames with 75x75x6 mm corrosion free MS angle, 8 SWG M.S. GI wire mess corrosion free made of construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle to be fitted on vertical posts. and dual door gate to facilitate entry and exit with locking arrangements. The vertical Posts/Horizontal post shall be made of M.S. GI angle . Such post shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge. (All metalic materilas should be Galvanized & Corrosion free) |
| 59 | Providing and fixing of stone pad complete in all respect, including supply of approved quality stone pad, necessary excavation, dressing, leveling, proper positioning, packing with sand/soil, and all labour, tools, plants, and materials required for satisfactory completion of work as per departmental specifications and directions of Engineer-in-Charge. |
| 60 | Safe Dismentling and carriage of old & used 11/0.440 KV 100 KVA DT from site to Electricity Store Centre at Hapur including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0–50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 61 | INSTALLATION OF INCREASING CAP. 25-100 KVA DT IN B.PLAN 2026-27 SCHEME AT VARIOUS SITE OF EDD-I HAPUR, UNDER EDC HAPUR (5 No. Work) (DPR N0. 535, 540, 541, 542 & 547) |
| 62 | Safe carriage of departmental materials from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0–50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 63 | PCC Pole 8.5M Long |
| 64 | 11/0.440 KV 100 KVA DT |
| 65 | LT AB CABLE 3x120+1x95+1x16 sqmm |
| 66 | LT AB CABLE 3x95+1x70+1x16 sqmm |
| 67 | LT PVC Alu. 3.5X150 /70 sqmm |
| 68 | Earthing Complete |
| 69 | Stay Set Complete |
| 70 | LT distributon Box |
| 71 | 11 Fuse Set |
| 72 | Erection and fixing of Single pole structure for PCC Pole 8.5 mtr 11KV HT line including excavation of suitable size pits, providing and fixing of shackle insulators, and complete installation of all requisite accessories strictly as per RESPO drawings/standard norms; including providing and fixing of holding clamps made of M.S. flat of size 35×5 mm with suitable nuts & bolts, alignment, tightening and all allied works; the scope of work includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, formation of pits, and complete site restoration; the contractor shall also be responsible for obtaining all necessary permissions, resolving Right of Way (ROW) issues, and completing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 73 | Grouting of PCC Pole 8.5 mtr supports in CC 1:4:8 (cement, sand & 40 mm brick ballast) in block size 450×450 mm up to 1/6th depth of full length of support below ground level and 300 mm above ground level (plinth), using CC 1:4:8 (cement, coarse sand and stone grit) including mufting as per approved drawing; the work shall include excavation, backfilling, proper ramming, and curing complete in all respects with all required materials; the scope further includes cost of all labour, tools & plants (T&P), machinery, drilling/excavation, safety arrangements, protection of existing utilities, and complete site restoration; the contractor shall also be responsible for obtaining necessary permissions, resolving Right of Way (ROW) issues, and executing the work as per departmental standards and directions of the Engineer-in-Charge. |
| 74 | Providing and fixing of all types of single pole clamps including, holding clamps, top channel clamps, dropper channel clamps etc., along with suitable nuts & bolts, complete in all respects strictly as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, alignment, tightening, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 75 | Providing and fixing of follwings petty meterial as per as per RESPO drawings/standard norms and directions of the Site In-charge; the scope of work includes all labour, tools & plants (T&P), handling, installation, alignment, tightening, safety arrangements and all allied works necessary for proper completion of the work as per departmental standards and directions of the Engineer-in-Charge. |
| 76 | Suspension clamps |
| 77 | I-hook |
| 78 | Peircing connector 95 sqmm |
| 79 | Barbed wire |
| 80 | 11 KV Danger Board |
| 81 | Providing & Fixing of LT fuse set Protection unit for 100 KVA DT with SMC Box including fixing of all accessories by providing all required materials (like suitable nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 82 | Erection & Fixing of 11KV D.O. fuse set Protection unit for 250 KVA DT including fixing of all accessories by providing all required materials (like suitable lugs, nuts & bolts etc.) as per RESPO/Drawing Norms and as per direction of site incharge. |
| 83 | Safely installation of 11/0.440 KVA 100 DT with the help of crane/manual labour at LT Sub-Station Double Pole by providing proper size aluminium Long barel lug for HT/LT as per direction of site incharge. |
| 84 | Laying of LT ABC 3x120+1x95+1x16 sqmm using suspension clamps, I-hook and dead end clamp inculding jumpering work with peircing connector, cable connection with distribution box for proper completion of work as per RESPO Norms, and as per direction of site incharge. |
| 85 | Laying of LT ABC 3x95+1x70+1x16 sqmm using suspension clamps, I-hook and dead end clamp inculding jumpering work with peircing connector, cable connection with distribution box for proper completion of work as per RESPO Norms, and as per direction of site incharge. |
| 86 | Erection and laying of LT PVC Alu. 3.5x150/70 sqmm inculding proper connection with long barrel lug, proper 3 nos crimping on each lug, LT fuse set/SMC box for proper completion of work as per RESPO Norms, and as per direction of site incharge. |
| 87 | Fixing and Grauting of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops, includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works and materials will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. only stay set and stay wire will be provided by department. |
| 88 | Providing and fixing of stone pad complete in all respect, including supply of approved quality stone pad, necessary excavation, dressing, leveling, proper positioning, packing with sand/soil, and all labour, tools, plants, and materials required for satisfactory completion of work as per departmental specifications and directions of Engineer-in-Charge. |
| 89 | Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs, Nut and Botls as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. only earth rod and GI wire will be provided by department. |
| 90 | REPALACEMENT OF 33 KV VCB IN B.PLAN 2026-27 SCHEME AT 33/11 KV RAMPUR ROAD S/S, EDD-I HAPUR, UNDER EDC HAPUR (01 No. Work) (DPR N0. 19) |
| 91 | Safe carriage of 33 KV VCB 800A, 750MVA with steel Structure from Electricity Store Centre at Hapur / J.E. Store to the site of work, including loading and unloading at both ends. The work shall be executed over kachha and pakka roads as per the directions of the Site In-charge. The scope includes arrangement of suitable transport, labour for loading/unloading, and all necessary Tools & Plants (T&P). The lead distance shall be up to 0–50 Km, covering stores located at Hapur / Ghaziabad / Bulandshahr. |
| 92 | Erection of 33 KV VCB 800A, 750MVA with steel structure in 33/11 KV Rampur road S/S inculding connection of control cables etc. the steel structure must be connected with existing earthing by 50x6 mm GI strip as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. Gi strip shall be provided by contractor |
| 93 | Providing and fixing of 4X2.5 sqmm Copper Control Cable in switch yard though trench and upto VCB panel as per RESPO Drawing/Norms includes all labour, tools & plants (T&P), fabrication, fitting, alignment, tightening, safety arrangements and all allied works will be provided by contractor, as per departmental standards and directions of the Engineer-in-Charge. Please Enable Macros to View BoQ information |