| 1 | Detail of Work |
| 2 | Safely carriage of 11 KV XLPE cable size 3x185 (300 Mtr) & 3x300 (250 Mtr) sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 3 | Safely carriage of 33 KV XLPE cable size 3x300 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 4 | Safely carriage of 11 KV cable jointing kit Indoor (4 No.) and jointing kit outoor (4 No.) 3x185 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 5 | Fixing of 11 KV cable jointing kit Indoor and Outdoor 3x185 sq mm for XLPE Cable as per RESPO specification. |
| 6 | Safely carriage of 11 KV/33 KV cable jointing kit Indoor (17 No.) and jointing kit outdoor (17 No.) 3x300 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 7 | Fixing of 33 KV cable jointing kit Indooe and Outdoor 3x300 sq mm for XLPE Cable as per RESPO specification. |
| 8 | Providing & fixing of G.I. Pipe 100/120 mm 4/6\\" dia (Classs B) 3.5 mtr. Long at the both side of double pole |
| 9 | Providing and fixing Clamp for GI Pipe. |
| 10 | laying and testing of 11 KV XLPE Cable 3x185 sq mm insulated power cable proper dressing, with sand cushioning and bricks/tiles, backfilling, and all associated works complete |
| 11 | Laying of 11 KV XLPE cable size 3x300 sq mm as per RESPO specification. |
| 12 | Laying of 11 KV XLPE Cable 3x185 sq mm hoisting, dressing, and termination including providing and fixing necessary loops, supports, clamps, and accessories, complete in all respects |
| 13 | Laying and testing of 33 KV XLPE Cable 3x300 sq mm insulated power cable proper dressing, with sand cushioning and bricks/tiles, backfilling, and all associated works complete |
| 14 | Laying of 33 KV XLPE Cable 3x300 sq mm hoisting, dressing, and termination including providing and fixing necessary loops, supports, clamps, and accessories, complete in all respects |
| 15 | Safely carriage of 11 KV O/G VCB (CTR 200/100/5A/ 350 MVA) 1250 AMP. from ESC, SRE to site of work including loading & unloading at both ends. |
| 16 | Safely carriage of 11 KV I/C VCB (CTR 600/300/5A 350 MVA). from ESC, SRE to site of work including loading & unloading at both ends. |
| 17 | Safely carriage of 33 KV VCB (800A, 750 MVA & 1250A). from ESC, SRE to site of work including loading & unloading at both ends. |
| 18 | Safely Installation of 11 KV I/C VCB (CTR 600/300/5A 350 MVA) complete with fixing and making cable connection with proper alignment in all respect. |
| 19 | Safely Installation of 11 KV O/G VCB complete with fixing and making cable connection with proper alignment in all respect. |
| 20 | Safely Installation of 33 KV VCB (800A, 750 MVA & 1250A) complete with fixing and making cable connection with proper alignment in all respect. |
| 21 | Removal of old & damaged 11 KV VCB after opening of all connection and nuts & bolts with carriage from site to ESC SRE including loading & unloading at both ends. |
| 22 | Water Level Earthing of 11 KV Incoming /Outgoing VCB by boring 60 ft. deep and providing & fixing 60 ft. G.I. pipe 1½ dia (Jindal class B) and connecting with G.I. strip of size 40x5 mm with providing of requireed charcoal and salt in the pipe properly. |
| 23 | Complete reparing Overhauling & Maintenance of tripping mechanism system and replacement of lever bush, spring etc.of 11 KV O/G VCB. |
| 24 | Supply, & laying, testing & commissioning of 4 x 2.5 sq.mm Copper conductor, PVC insulated, PVC sheathed, armoured control cable of 1.1 kV grade conforming to IS complete with glands, lugs and all accessories. |
| 25 | Supply, & laying, testing & commissioning of LT PVC Un-armoured cable size 2Cx6 sq.mm complete with glands, lugs and all accessories. |
| 26 | Safely carriage of 33 KV New Contral panel Single/Double T/F from ESC, SRE to site of work including loading & unloading at both ends.. |
| 27 | Safely Installation of 33 KV New Contral panel Single/Double T/F complete with fixing and making cable connection with proper alignment in all respect. |
| 28 | Repairing of 33 KV double Transformer Control Pannel with all requaired necessary material complete. |
| 29 | Removal of old & damaged 33 KV Contral panel (02 No.) after opening of all connection and nuts & bolts with carriage from site to ESC SRE including loading & unloading at both ends. |
| 30 | Safely & Laying of Un-armoured Control Cable size 4x2.5/2x2.5 sq mm from ESC, SRE to site of work including loading & unloading at both ends. Please Enable Macros to View BoQ information |