| 1 | Carriage of the following material from Store Centre, Rampur to work site including loading & unloading. |
| 2 | 33 KV PT Unit |
| 3 | 33 KV CT Unit |
| 4 | Lighting Arrester |
| 5 | 33 KV TPMO |
| 6 | 33 KV Isolator |
| 7 | 11 KV 3X300 MM SQ XPLE Cable |
| 8 | 11 KV 3X300 MM SQ Jonting KIT I/D |
| 9 | 11 KV 3X300 MM SQ Jonting KIT O/D |
| 10 | 33 KV Control Pannel Double T/F |
| 11 | 33 KV Control Pannel Double T/F(Recived Back Site to Store) |
| 12 | 33 KV TPMO(Recived Back Site to Store) |
| 13 | Isolator(Recived Back Site to Store) |
| 14 | CT(Recived Back Site to Store) |
| 15 | PT(Recived Back Site to Store) |
| 16 | Installation/fixing of 33 KV PT Unit as per RESPO Norms and as per direction of Supervising Engineer. |
| 17 | Installation/fixing of 33 KV CT Unit as per RESPO Norms and as per direction of Supervising Engineer. |
| 18 | Installation/fixing of Lighting Arrester as per RESPO Norms and as per direction of Supervising Engineer. |
| 19 | Installation/fixing of 33 KV TPMO as per RESPO Norms and as per direction of Supervising Engineer. |
| 20 | Installation/fixing of 33 Kv Isolator as per RESPO Norms and as per direction of Supervising Engineer. |
| 21 | Installation/fixing of 33 KV Control Pannel Double T/F as per RESPO Norms and as per direction of Supervising Engineer. |
| 22 | laying, sagging, binding of 11 KV 3x300 sqmm XLPE Cable with the help of cable jointing kit as per RESPO Norms and as per direction of Supervising Engineer. |
| 23 | Providing and doing Pipe earthing as per RESPO Norms and as per direction of Supervising Engineer. |
| 24 | Providing and doing Chemical earthing with GI strip for switch gear as per RESPO Norms and as per direction of Supervising Engineer. |
| 25 | Dismentaling of old and used 33 KV Control Pannel Double T/f as RESPO Norms and as per direction of Supervising Engineer |
| 26 | Dismentaling of old and used 33 KV TPMO as RESPO Norms and as per direction of Supervising Engineer |
| 27 | Dismentaling of old and used Isolator as RESPO Norms and as per direction of Supervising Engineer |
| 28 | Dismentaling of old and used CT as RESPO Norms and as per direction of Supervising Engineer |
| 29 | Dismentaling of old and used PT as RESPO Norms and as per direction of Supervising Engineer Please Enable Macros to View BoQ information |