| 1 | Carriage of the following material from Store Centre, Rampur to work site including loading & unloading. |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | Polymeric 11 KV Pin Insulator |
| 4 | Disc insulator with fiting 11 KV |
| 5 | 400 KVA 11/0.4 KV |
| 6 | 3 Phase do Fuse Set |
| 7 | 11 KV Fuse Set |
| 8 | 11 KV XPLE Cable 3x70 SQMM |
| 9 | 11 KV Jointing Kit O/D Type 3X70 SQMM |
| 10 | LT Cable 1x400 SQMM Single Core |
| 11 | a) Single/Double support structure as required (rate given by for single pole )Excavation of foundation Pit in size of 75x45cm having depth of 1/6th of the full length of the support(pole), providing and laying of stone pad (300x300x75 mm) in the Bottom of the pit. Erection of support(pole) complete with fixing of 11 KV V-type cross-Arms and other accessories by providing clamps made of MS flat of size 65x65xc6 mm with Nuts & Bolts, as per RESPO Norms. |
| 12 | 8.5 Mtr long PCC Pole |
| 13 | Grouting of support in CC 1:4:8(cement, sand & 40 mm. brick ballast) Grouting will be done in the block of size 45x45cmx1/6th of full length of the support upto ground level, 30 cm plinth above the ground level with CC 1:3:6 (cement, course sand and stone grit) with muffing. The work includes back filling and proper ramming etc.Single/Double support structure(rate given by for single pole ) |
| 14 | 8.5 Mtr long PCC Pole |
| 15 | Earthing of support with MS Earth Rod of (20x2500)mm long including excavation of pit and driving MS Rod 3.0 M apart from support and 0.5 M below the ground level and connecting below the earth electrodes with the help of GI wire No. 8SWG and earthing lugs. |
| 16 | fixing of 11 KV Pin Insulator with Pin as per RESPO Norms and as per direction of Supervising Engineer. |
| 17 | fixing of 11 KV Disc Insulator with Fitting as per RESPO Norms and as per direction of Supervising Engineer. |
| 18 | Installation of Healthy 400 KVA Transformer with all respect as per RESPO Norms and as per direction of Supervising Engineer. |
| 19 | fixing of 3 phase DO fuse set as per RESPO Norms and as per direction of Supervising Engineer. |
| 20 | fixing of 11 KV Fuse Set as per RESPO Norms and as per direction of Supervising Engineer. |
| 21 | laying ,stringing and binding of 11 KV 3x70 Sqmm XLPE Cable with the help of cable jointing kit as per RESPO Norms and as per direction of Supervising Engineer. |
| 22 | laying ,stringing and binding of LT Cable 1x400 SQMM single core as per RESPO Norms and as per direction of Supervising Engineer. |
| 23 | Providing and fixing of Stone pad as per RESPO Norms and as per direction of Supervising Engineer |
| 24 | Providing and fixing of Clamp with nut and bolt as per RESPO Norms and as per direction of Supervising Engineer |
| 25 | Providing and fixing of Top channel as per RESPO Norms and as per direction of Supervising Engineer |
| 26 | Providing and fixing Dropper channel of per RESPO Norms and as per direction of Supervising Engineer |
| 27 | Providing and fixing of MS Angle base per RESPO Norms and as per direction of Supervising Engineer |
| 28 | Providing and fixing of fencing of transformer per RESPO Norms and as per direction of Supervising Engineer |
| 29 | Providing and fixing of Pipe earthling of Transformer per RESPO Norms and as per direction of Supervising Engineer |
| 30 | Providing mobile trolly with fencing for 400 KVA transformer per RESPO Norms and as per direction of Supervising Engineer |
| 31 | Repair of plinth as per RESPO Norms and as per direction of Supervising Engineer(material i.e cement, brick, sand will be provide by the constractor) |
| 32 | Providing and fencing of Transformer as per RESPO Norms and as per direction of Supervising Engineer |
| 33 | Providing and fixing of GI strip for earthing (body and natural) of per RESPO Norms and as per direction of Supervising Engineer |
| 34 | Providing and fixing of Alluminum Lug per RESPO Norms and as per direction of Supervising Engineer Please Enable Macros to View BoQ information |