| 1 | fo|qr forj.k [k.M&[kqtkZ] ds fctusl Iyku ;kstuk 2026&27 ds vUrxZr 33 ds0oh0 ykbZuksa ds e/; vkj0,e0;w0 yxkus laca/kh dk;ZA |
| 2 | DESCRIPTION OF WORK/ITEM (S) |
| 3 | Safe carriage of store material from store center to Pit site with loading & unloading at both ends respectively without contractor porvading all item etc. distance within- 0 to 50 Km |
| 4 | ST Poles 13 mtr. long |
| 5 | PCC Poles 11 mtr. long |
| 6 | Safe carriage of store material from store center to JE Store/Sub Station with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 50 Km |
| 7 | ACSR Dog Conductor |
| 8 | 33 KV XLPE CABLE (3X300) sq.mm |
| 9 | 33 KV V TYPE CROSS ARM |
| 10 | 33 kv pin insulater |
| 11 | 33 KV Disc Insulater |
| 12 | Loading, Safe carriage & unloading of heavy stock material channel, Angle and other site requerment any mattrial ETC from store center to JE Store/Sub Station with proper stacking of material, distance within 30 Kms. |
| 13 | Safe carriage of store material from JE Store/Sub Station to Pit site as per site requirtement with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 30 Km |
| 14 | ACSR Dog Conductor |
| 15 | 33 KV XLPE CABLE (3X300) sq.mm |
| 16 | 33 KV V TYPE CROSS ARM |
| 17 | 33 kv pin insulater |
| 18 | 33 KV Disc Insulater |
| 19 | ST Poles 13 mtr. long |
| 20 | PCC Poles 11 mtr. long |
| 21 | Loading, Safe carriage & unloading of heavy stock material channel, Angle and other site requerment any mattrial ETC from JE Store/Sub Station to Pit site as per site requirement with proper stacking of material, distance within 30 Kms. |
| 22 | Erection of Single pole all size as per RESPO Drawing, fitting with all accessories Pin Insulator, F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 23 | STP Poles 13 mtr. long |
| 24 | Excavation of For Each and grouting of Single Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement |
| 25 | STP Poles 13 mtr. long |
| 26 | Erection of Dobule Pole all size as per RESPO Drawing, fitting with all accessories Pin Insulator, F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 27 | PCC Poles 9/11/13 mtr. long |
| 28 | Excavation of For Each and grouting of Dobule Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Bricks/Stone Ballast, etc. as per actual site requirement |
| 29 | PCC Poles 9/11/13 mtr. long |
| 30 | Laying sagging stringing and binding and jumpering etc of following Conductor/ABC/XLPE of size on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. |
| 31 | 33 KV XLPE CABLE (3X300) sq.mm |
| 32 | ACSR Dog Conductor |
| 33 | Cutting/drilling/Welding of MS Channel Top Channal, site channel, site angle, Dropper Channal & Cross brassing angle and MS mattriel Including the work of fixing on STP Pole for construction of the line. |
| 34 | Making Jumpers on Section Points, by fixing of proper sizes, suitable for ACSR Conductor. Sectional Double/Four Pole. |
| 35 | Fixing of 33 KV V TYPE CROSS ARM |
| 36 | Fixing of 33 KV Disc Insulater |
| 37 | Fixing of 33 KV Pin Insulater |
| 38 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. |
| 39 | Providing of 33 KV XLPE Cable Jointing Kit off size 3X300 |
| 40 | Fixing of 33 KV XLPE Cable Jointing Kit off size 3X300 |
| 41 | CLAMP FOR CROSS ARM |
| 42 | MS CHANEL, ANGEL, DROPER, |
| 43 | manual digging and laying of xlpe 33 kv cable in switch yard from double pole to control room (LS) |
| 44 | PROVIDING AND FIXING 33 KV LINE RMU UNIT 2 way 2out Please Enable Macros to View BoQ information |