| 1 | Carriage of followings from ESC BSR to pit site on kachcha pakkaa road including loading and unloading chagres at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 2 | PCC Poles 8.5 Mtr. Long |
| 3 | 11 KV Disc Insulator T&C type 4500kg. |
| 4 | 11 KV Disc fitting |
| 5 | 11 KV Pin insulator (Polymeric) |
| 6 | 11/0.4 KV T/F 100 KVA |
| 7 | 11 KV TPMO |
| 8 | 11 KV fuse Set |
| 9 | Stay set Complete 16x1800 |
| 10 | Earthing of pole by MS earthing rod of 20x2500mm & SWG earthing wire |
| 11 | 11 KV Pin with nut |
| 12 | Weasel Conductor |
| 13 | Three Phase Distribution box |
| 14 | Three Phase Distribution box Clamps |
| 15 | 11 KV V-type Steel Cross Arm |
| 16 | LT ABC Cable 3x120 Sq. Mm. |
| 17 | ABC Cable 3x95+1x0+1x16)Sq Mm. |
| 18 | PCC Poles 11 Mtr. Long |
| 19 | LT XLPE ABC Cable Al. 3.5x150 Sq. Mm. |
| 20 | The following material Erection & Fixing as per RESPO manual andas per direction fo Supervising Engineer. It includes the cost of labour, T&P, Carrier etc. required for proper completion of work. |
| 21 | PCC Poles 8.5 Mtr. Long |
| 22 | 11 KV Disc Insulator T&C type 4500kg. |
| 23 | 11 KV Disc fitting |
| 24 | 11 KV Pin insulator (Polymeric) |
| 25 | 11/0.4 KV T/F 100 KVA |
| 26 | 11 KV TPMO |
| 27 | 11 KV fuse Set |
| 28 | Stay set Complete 16x1800 |
| 29 | Earthing of pole by MS earthing rod of 20x2500mm & SWG earthing wire |
| 30 | 11 KV Pin with nut |
| 31 | Weasel Conductor |
| 32 | Three Phase Distribution box |
| 33 | Three Phase Distribution box Clamps |
| 34 | 11 KV V-type Steel Cross Arm |
| 35 | LT ABC Cable 3x120 Sq. Mm. |
| 36 | ABC Cable 3x95+1x0+1x16)Sq Mm. |
| 37 | PCC Poles 11 Mtr. Long |
| 38 | LT XLPE ABC Cable Al. 3.5x150 Sq. Mm. |
| 39 | Providing & Fixing of the following material by the Contractor as perUPPCL/RESPO Rules. |
| 40 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 41 | Stone pad 300x300x75mm |
| 42 | Clamps for LT T-off with bolts & Nuts |
| 43 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 44 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 45 | MS Top channel (125x65x2240mm) |
| 46 | MS Channel 125x65x1300mm (T-off) |
| 47 | LT incoming panel with metering equipment, Fuse & fixing arrangement (LS) |
| 48 | LT PVC Cable 3.5x70/35 sq mm |
| 49 | LT PVC Cable 3.5x150/70 sq mm |
| 50 | Danger baord Barbed wire including jumper |
| 51 | Concreting of poles |
| 52 | Concreting Stay set |
| 53 | LT fuse set Protection Unit for 100 KVA DT with SMC Box |
| 54 | Cross Arm Holding Clamps with nuts&bolts |
| 55 | PRC Connector |
| 56 | Dead End Clamps |
| 57 | Sspension Clamps |
| 58 | EYE- Hook |
| 59 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |