| 1 | Description of Work (Additional/New Distribution Transformer Installation, Pole and Line Erection Etc Under SDO-l Kakore and SDO-II Baral Bulandshahr). |
| 2 | Safe carriage of Pole, from store center to site store with loading & unloading at both ends respectively distance within- 0 to 80 Kms. |
| 3 | PCC Poles 8.5 mtr. long . |
| 4 | Loading, Safe carriage & unloading of stock material As Stay Set, LT Distribution Box, 11 KV Pin & Disc Insulator With Fitting, etc from store center to site store with proper stacking of material, distance within-150Kms. |
| 5 | Loading, Safe carriage & unloading of LT/HT Conductor, T/F, etc from store center to site store with proper stacking of material, distance within-150Kms. |
| 6 | LT PVC Cable 3.5x150/70 Sq mm. |
| 7 | LT PVC Cable 1x400 Sq mm. |
| 8 | LT Lead 1x25 Sq mm For LT Distribution Box. |
| 9 | 3x95+1x50+1x16 Sq mm LT AB Cable. |
| 10 | 3x120+1x95+1x25 Sq mm LT AB Cable. |
| 11 | ACSR Weasel Conductor. |
| 12 | T/F 10 KVA 11/0.4 KV. |
| 13 | T/F 100 KVA 11/0.4 KV. |
| 14 | T/F 250 KVA 11/0.4 KV. |
| 15 | Erection of Complete Single 8.5 PCC Pole mtr long as per Respo. |
| 16 | PCC Poles 8.5 mtr. long With All LT & HT Accesseries As Stone Pad, X-Arm, Earthing Rod,11 KV Pin & Disc Insulator With Fitting, Shakle Insulator, Susension, Ded End Clamp, j & I-Hook, Holding Clamp With Nut Bolt, F-Clamp, T-Off, 11 KV Fuse Set,LT Distribution Box, LT Fuse Unit Box, PG Clamp, Stay etc As Per Respo Mannual. |
| 17 | Erection of Complete PCC Dobule Pole 8.5 mtr long as per Respo. |
| 18 | PCC Poles 8.5 mtr. long With All HT Accesseries As Stone Pad, 11 KV Pin & Disc Insulator With Fitting, Holding Clamp With Nut Bolt, T-Off, Top & Dropper Channel, TF Base Angle, LT Fuse Unit Box, 11 KV Fuse Set, Earth Rod, Shakle Insulator, PG Clamp, Stay Set With Grouting, Danger Board, Barbed Wire,Jumphering, LT Lead With Lug etc As Per Respo Mannual. |
| 19 | Excavation of For grouting of Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement . |
| 20 | PCC Poles 8.5/11 mtr long. |
| 21 | Grouting Of Stay Set |
| 22 | Installation Of 10 To 250 KVA Distribution Transformer With By Crane/Hydra & Laying sagging stringing and binding and jumpering etc of following ACSR Conductor/wisel/Rabit/ABC all size on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. |
| 23 | LT PVC Cable 3.5x150/70 Sq mm. |
| 24 | LT PVC Cable 1x400 Sq mm. |
| 25 | LT Lead 1x25 Sq mm For LT Distribution Box. |
| 26 | 3x95+1x50+1x16 Sq mm LT AB Cable. |
| 27 | 3x120+1x95+1x25 Sq mm LT AB Cable. |
| 28 | ACSR Weasel Conductor. |
| 29 | 10 KVA T/F With LT Fuse Unit,11 KV D.O Fuse Set.,Eathing, And LT Distibution Box. |
| 30 | T/F 100 KVA 11/0.4 KV. |
| 31 | T/F 250 KVA 11/0.4 KV. |
| 32 | Dismantling and Receive back All Type Material from site to esc store. |
| 33 | Dismantling and Receive back 100 KVA TF from site to esc store. |
| 34 | The follwing material will be providing & Fixing by the contractor . |
| 35 | Providing of Earthing Complete With Earth Rod, Earth Wire & Clamp as per RESPO manual. |
| 36 | Providing & Fixing of Chemical Earthing Complete per RESPO manual. |
| 37 | Providing of MS Channel With Cuting-Drilling 125x65x2240 mm For T-Off, Top & Dropper as per RESPO manual . |
| 38 | Providing of MS TF Base Angle 75x75x6x2028 mm With Cuting-Drilling as per RESPO manual . |
| 39 | Providing of 11 KV V-Type X-arm 10.2 KG each as per RESPO mannual . |
| 40 | Providing of Stone Pad 3x300x75 as per RESPO mannual . |
| 41 | Providing & Fixing of MS Nut & Bolt Off Size as per RESPO mannual . |
| 42 | Providing of Holding Clamp With Nut & Bolt as per RESPO mannual . |
| 43 | Providing LT 1-P Distribution Box With Clamp as per RESPO mannual |
| 44 | Providing of Danger Board With Barbed Wire & Jumpher as per RESPO mannual . |
| 45 | Providing of Suspention Clamp With I-J Hook as per RESPO mannual . |
| 46 | Providing of Ded End Clamp With i-J Hook as per RESPO mannual . |
| 47 | Providing & Fixing of LT PRC Off Size as per RESPO mannual. |
| 48 | Providing & Fixing of Al Lug Long Berrel Off Size as per RESPO mannual. |
| 49 | Providing of LT Fuse Unit Box With Fuse Wire as per RESPO mannual . |
| 50 | Providing of 11 KV F-Clamp With Nut & Bolt as per RESPO mannual . |
| 51 | Providing of PG Clamp With Nut & Bolt as per RESPO mannual . |
| 52 | Making of 250 KVA TF Plinth as per RESPO mannual . |
| 53 | Making of 250 KVA TF G.I Fancing With Material as per RESPO mannual . |
| 54 | Providing of Barbed Wire as per RESPO mannual . |
| 55 | Complete Telless Unit With Box |
| 56 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |