| 1 | Description of Work (Additional/New Distribution Transformer Installation, Pole and Line Erection etc. Under EDSD-II Gulaothi and EDSD-lll Sikandrabad ,Bulandshahr). |
| 2 | Safe carriage of Pole, from store center to site store with loading & unloading at both ends respectively distance within- 0 to 80 Kms. |
| 3 | PCC Poles 8.5 mtr. long . |
| 4 | PCC Poles 11 mtr. long . |
| 5 | LT PVC Cable 3.5x150 Sq mm. |
| 6 | LT PVC Cable 1x400 Sq mm. |
| 7 | 3x95+1x50+1x16 Sq mm LT AB Cable. |
| 8 | 3x120+1x95+1x25 Sq mm LT AB Cable. |
| 9 | ACSR Weasel Conductor. |
| 10 | T/F 10 KVA 11/0.4 KV. |
| 11 | T/F 16 KVA 11/0.4 KV. |
| 12 | T/F 25 KVA 11/0.4 KV. |
| 13 | T/F 100 KVA 11/0.4 KV. |
| 14 | T/F 250 KVA 11/0.4 KV. |
| 15 | 3-Ph LT Distribution Box |
| 16 | Loading, Safe carriage & unloading of heavy stock material As Stay Set, LT Distribution Box, 11 KV Pin & Disc Insulator With Fitting, etc from store center to site store with proper stacking of material, distance within-150Kms. |
| 17 | Erection of Complete Single 8.5 mtr long PCC Pole ,Pin & Disc Insulator With Fitting, Shakle Insulator, Susension, Ded End Clamp, j & I-Hook, Holding Clamp With Nut Bolt, F-Clamp, T-Off, PG Clamp, Stay etc As Per Respo Mannual. |
| 18 | Erection of Complete Single 11Mtr. long PCC Pole Work With All LT & HT Accesseries As Stone Pad, X-Arm, Earthing Rod,11 KV Pin & Disc Insulator With Fitting, Shakle Insulator, Susension, Ded End Clamp, j & I-Hook, Holding Clamp With Nut Bolt, F-Clamp, T-Off, PG Clamp, Stay etc As Per Respo Mannual. |
| 19 | Erection of Complete Double 8.5 mtr long PCC Pole ,Pin & Disc Insulator With Fitting, Shakle Insulator, Susension, Ded End Clamp, j & I-Hook, Holding Clamp With Nut Bolt, F-Clamp, T-Off, PG Clamp, Stay etc As Per Respo Mannual. |
| 20 | Erection of Complete Double 11Mtr. long PCC Pole Work With All LT & HT Accesseries As Stone Pad, X-Arm, Earthing Rod,11 KV Pin & Disc Insulator With Fitting, Shakle Insulator, Susension, Ded End Clamp, j & I-Hook, Holding Clamp With Nut Bolt, F-Clamp, T-Off, PG Clamp, Stay etc As Per Respo Mannual. |
| 21 | Grouting Of Single Pole |
| 22 | Grouting Of Double Pole |
| 23 | Grouting Of Stay Set |
| 24 | Laying of Cables,conductors and Installation Of 10 To 250 KVA Distribution Transformer With By Crane/Hydra & Laying sagging stringing and binding and jumpering etc of following ACSR Conductor/wisel/Rabit/ABC all size on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. |
| 25 | LT PVC Cable 3.5x150/70 Sq mm. |
| 26 | LT PVC Cable 1x400 Sq mm. |
| 27 | 3x95+1x50+1x16 Sq mm LT AB Cable. |
| 28 | 3x120+1x95+1x25 Sq mm LT AB Cable. |
| 29 | ACSR Weasel Conductor. |
| 30 | 10 KVA T/F With LT Fuse Unit,11 KV D.O Fuse Set.,Eathing, And LT Distibution Box. |
| 31 | 16 KVA T/F With LT Fuse Unit,11 KV D.O Fuse Set.,Eathing, And LT Distibution Box. |
| 32 | T/F 25 KVA 11/0.4 KV. |
| 33 | T/F 100 KVA 11/0.4 KV. |
| 34 | T/F 250 KVA 11/0.4 KV. |
| 35 | Dismantling and Receive back 10 KVA TF from site to esc store. |
| 36 | Dismantling and Receive back 100 KVA TF from site to esc store. |
| 37 | The follwing material will be providing & Fixing by the contractor . |
| 38 | providing & Fixing MS Channel (Dropper) 100x50x2028mm (for fuse set) as per RESPO mannual . |
| 39 | providing & Fixing Stone Pad 300x300x75mm as per RESPO mannual . |
| 40 | providing & Fixing Clamp for LT T-Off with bolts & Nuts as per RESPO mannual . |
| 41 | providing & Fixing T-Off Channel for LT with Clamp as per RESPO mannual . |
| 42 | providing & Fixing Danger Board With Barbed Wire & Jumpher as per RESPO mannual . |
| 43 | providing & Fixing MS Angle 75x75x6x2028 mm with Clamp & Bolt and nut as per RESPO mannual . |
| 44 | providing & Fixing MS Top channel 125x65x2240 mm as per RESPO mannual . |
| 45 | providing & Fixing MS Channel 75x75x6x2028 (T-Off) as per RESPO mannual |
| 46 | providing & Fixing Barbed wire G.I. (1.5 Kg per Pole) as per RESPO mannual . |
| 47 | providing & Fixing Plinth for size 2x2x1.5m as per RESPO mannual . |
| 48 | providing & Fixing TF Fencing as per RESPO mannual . |
| 49 | providing & Fixing Chemical Earthing (Neutral / Body) Complete with G.I Strip as per RESPO mannual . |
| 50 | providing & Fixing AL Lug long barrel as per RESPO mannual . |
| 51 | providing & Fixing LT XLPE Cable Al 3.5x150 sq mm as per RESPO mannual . |
| 52 | providing & Fixing Suspension Clamp |
| 53 | providing & Fixing Dead end Clamp |
| 54 | providing & Fixing J-Hook |
| 55 | providing & Fixing LT Piercing Connector for 95/120 sqmm |
| 56 | providing & Fixing Holding clamps for top channel & fuse set etc. with bolts & nuts |
| 57 | providing & Fixing Three Phase Distribution Box Clamp |
| 58 | providing & Fixing LT Fuse Unit with Box & All Accessories as per site requirment |
| 59 | providing & Fixing LT Telless Unit with Box & with 2 No. LT Line Circuit Arrengment with all accessories as per site requirement |
| 60 | providing & Fixing Pole & T/F Body Earthign Complete by M.S Earthing rod 20x2540 mm and 6 SWG Earthing wire etc as per RESPO mannual . |
| 61 | providing & Fixing Connecting Lead for Distribution Box 1x16 as per RESPO mannual . |
| 62 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |