|
| 1 | fctusl Iyku ;kstuk ds vUrxZr fo|qr forj.k [k.M eksnhuxj ds dk;Z{ks= esa 11@-04 dsoh midsUnzksa dh {kerko`f)@fuekZ.k dk dk;ZAv½ ykbZu fuekZ.k dk;ZA c½ vfrfjDr ifjorZd dh LFkkiuk A |
| 2 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM STORE CENTER MODINAGAR/ANY OTHER PLACE TO JE STORE/SITE OF WORK INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 3 | PCC POLE 8.5 MTR LONG |
| 4 | PCC POLE 11 MTR LONG |
| 5 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM STORE CENTER MODINAGAR/ANY OTHER PLACE TO JE SUB STATION INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 6 | 25 KVA T/F |
| 7 | 100 KVA T/F |
| 8 | 250 KVA T/F |
| 9 | STAY SET COMPLETE WITH GROUT |
| 10 | 11 KV POLYMERIC PIN INSULATOR |
| 11 | 11 KV POLYMERIC DISC INSULATOR |
| 12 | ACSR WEASEL CONDUCTOR |
| 13 | ACSR RABBIT CONDUCTOR |
| 14 | LT XLPE CABLE 1X240 SQ MM |
| 15 | LT ABC 3X95 SQ MM |
| 16 | LT ABC 3X120 SQ MM |
| 17 | 11 KV FUSE SET |
| 18 | 11 KV X ARM |
| 19 | DISTRIBUTION BOX 3 PHASE |
| 20 | MS CHANNEL |
| 21 | MS ANGLE |
| 22 | EARTHING COMPLETE |
| 23 | 11 KV XLPE CABLE 3X70 SQ MM |
| 24 | 11 KV CABLE J/KIT 3X70 SQ MM O/D |
| 25 | 11 KV XLPE CABLE 3X120 SQ MM |
| 26 | 11 KV CABLE J/KIT 3X120 SQ MM O/D |
| 27 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM JE SUB STATION TO MODINAGAR/ANY OTHER PLACE/AT SITE TO PIT SITE INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 28 | 25 KVA T/F |
| 29 | 100 KVA T/F |
| 30 | 250 KVA T/F |
| 31 | STAY SET COMPLETE WITH GROUT |
| 32 | 11 KV POLYMERIC PIN INSULATOR |
| 33 | 11 KV POLYMERIC DISC INSULATOR |
| 34 | ACSR WEASEL CONDUCTOR |
| 35 | ACSR RABBIT CONDUCTOR |
| 36 | LT XLPE CABLE 1X240 SQ MM |
| 37 | LT ABC 3X95 SQ MM |
| 38 | LT ABC 3X120 SQ MM |
| 39 | 11 KV FUSE SET |
| 40 | 11 KV X ARM |
| 41 | DISTRIBUTION BOX 3 PHASE |
| 42 | MS CHANNEL |
| 43 | MS ANGLE |
| 44 | EARTHING COMPLETE |
| 45 | 11 KV XLPE CABLE 3X70 SQ MM |
| 46 | 11 KV CABLE J/KIT 3X70 SQ MM O/D |
| 47 | 11 KV XLPE CABLE 3X120 SQ MM |
| 48 | 11 KV CABLE J/KIT 3X120 SQ MM O/D |
| 49 | SAFE CARTAGE OF DECNTRALIZED LINE MATERIAL FROM CONTRACTOR TO JE SUB STATION/ANY OTHER PLACE INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 50 | LT LUGS 240 SQ MM |
| 51 | LT PVC 3.5X150/70 SQ MM |
| 52 | LT LUGS 150 SQ MM |
| 53 | LT LEAD 1X16 SQ MM |
| 54 | LT LUGS 16 SQ MM |
| 55 | PEIRCING CLAMP |
| 56 | SUSPENSION CLAMP |
| 57 | DEAD END CLAMP |
| 58 | EYE HOOK |
| 59 | NUT & BOLTS |
| 60 | CLAMP WITH NUT & BOLT |
| 61 | DANGER BOARD WITH CLAMP |
| 62 | F CLAMP |
| 63 | CHEMICAL EARTHING |
| 64 | COPPER L PIECE |
| 65 | LT SHACKLE INSULATOR |
| 66 | ERECTION OF SINGLE POLE ALL SIZE AS PER RESPO DRAWING, FITTING WITH ALL ACCESSORIES PIN INSULATOR, F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 67 | PCC POLE 8.5 MTR LONG |
| 68 | PCC POLE 11 MTR LONG |
| 69 | ERECTION OF DOBULE POLE ST POLE 11 MTR LONG OF 33 KV FITTINGS AS PER RESPO DRAWING TOP CHANNAL, DROPPER CHANNAL, X BRACING SET, DISC INSULATOR, PIN INSULATOR, GUARDING ANGLE F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 70 | PCC POLE 8.5 MTR LONG |
| 71 | PCC POLE 11 MTR LONG |
| 72 | EXCAVATION OF FOR EACH AND GROUTING OF SINGLE POLE AS PER RESPO DRAWING AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE PAD ETC. AS PER ACTUAL SITE REQUIREMENT |
| 73 | PCC POLE 8.5 MTR LONG |
| 74 | PCC POLE 11 MTR LONG |
| 75 | EXCAVATION OF FOR EACH AND GROUTING OF D/P AND S/C POLE AS PER RESPO DRAWING AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE PAD ETC. AS PER ACTUAL SITE REQUIREMENT |
| 76 | PCC POLE 8.5 MTR LONG |
| 77 | PCC POLE 11 MTR LONG |
| 78 | PROVIDING & FIXING OF PLINTH OF POLE/KIKING OF POLE UP NUTUREL GROUND LEVEL. |
| 79 | FIXING OF GUARDING OF 11 KV LINE 6/8 SWG WIRE. |
| 80 | FIXING OF 11 KV STAY SET |
| 81 | GROUTING OF 11 KV STAY SET INCLUDING THE WORK OF NOZELLING ETC. AS PER RESPO MANUAL AND ALSO INCLUDING THE COST OF ALL THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE ETC. AS PER ACTUAL SITE REQUIREMENT , LABOUR, T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 82 | MAKING/FILLING OF 11 KV CABLE JOINTING KIT VARIOUS SIZE XLPE CABLE |
| 83 | 11 KV CABLE J/KIT 3X120 SQ MM O/D |
| 84 | 11 KV CABLE J/KIT 3X70 SQ MM O/D |
| 85 | LAYING SAGGING STRINGING AND BINDING AND JUMPERING ETC OF FOLLOWING CONDUCTOR/ABC/XLPE OF SIZE ON THE NEWLY ERECTED POLES AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDES THE COST OF LABOUR, T&P, CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 86 | 11 KV XLPE CABLE 3X70 SQ MM |
| 87 | 11 KV XLPE CABLE 3X120 SQ MM |
| 88 | LT XLPE CABLE 1X240 SQ MM |
| 89 | LT PVC 3.5X150/70 SQ MM |
| 90 | LT ABC 3X95 SQ MM |
| 91 | LT ABC 3X120 SQ MM |
| 92 | ACSR WEASEL CONDUCTOR |
| 93 | ACSR RABBIT CONDUCTOR |
| 94 | HANGING OF XLPE CABLE OF VARIOUS SIZE ON POLE WITH ALL ACCESSORIES. |
| 95 | 11 KV XLPE CABLE 3X70 SQ MM |
| 96 | 11 KV XLPE CABLE 3X120 SQ MM |
| 97 | LT XLPE CABLE 1X240 SQ MM |
| 98 | MOUNTING OF DISTRIBUTION TRANSFORMERS. |
| 99 | 11.2 T/F 100 KVA 11/0.4 KV |
| 100 | 11.3 T/F 250 KVA 11/0.4 KV |
| 101 | 11.4 T/F 25 KVA 11/0.4 KV |
| 102 | INSTALLATION AND FIXING OF DISTRIBUTION TRANSFORMERS. |
| 103 | 11.2 T/F 100 KVA 11/0.4 KV |
| 104 | 11.3 T/F 250 KVA 11/0.4 KV |
| 105 | 11.4 T/F 25 KVA 11/0.4 KV |
| 106 | FIXING AND HANGING OF LT LEAD 1X16 SQ MM ON POLE. |
| 107 | FIXING OF EARTHING ROD AND WIRE AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER INCLUDING THE COST OF LABOUR, T&P ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 108 | CUTTING/DRILLING/WELDING OF MS CHANNEL TOP CHANNAL, SITE CHANNEL, SITE ANGLE, DROPPER CHANNAL & CROSS BRASSING ANGLE AND MS MATTRIEL INCLUDING THE WORK OF FIXING ON STP POLE FOR CONSTRUCTION OF THE LINE. |
| 109 | MAKING JUMPERS ON SECTION POINTS, BY FIXING OF PROPER SIZES, SUITABLE FOR ACSR CONDUCTOR. SECTIONAL DOUBLE/FOUR POLE. |
| 110 | MAKING OF NEW PLINTH WITH MATERIAL SAND BRICK ETC.OF SIZE 6X6X6 SQ FT FOR DISTRIBUTION TRANSFORMERS. |
| 111 | MAKING OF FENCING FOR DISTRIBUTION TRANSFORMERS. |
| 112 | FIXING OF 11 KV V TYPE CROSS ARM |
| 113 | FIXING OF 11 KV PIN INSULATER |
| 114 | FIXING OF 11 KV DISC INSULATER |
| 115 | FIXING OF THREE PHASE DISTRIBUTION BOX DIRECTION OF ENGINEER INCHARGE |
| 116 | FIXING OF 11 KV FUSE SET |
| 117 | CHOPPING OF BRANCHES OF TREES OF EUCALYPTUS, NEEM, KEEKAR AND OTHER KIND OF TREES ALONG THE ROUTE OF THE LINE AND DISPOSAL OF THE SAME AT SUITABLE PLACE. |
| 118 | PROVIDING AND FIXING OF CHEMICAL EARTHING |
| 119 | PROVIDING AND FIXING OF GI STRIP FOR EARTHING REGARDING |
| 120 | POVIDING AND FIXING OF COPPER L PIECE |
| 121 | PROVIDING AND FIXING OF LT LUGS 240 SQ MM |
| 122 | PROVIDING AND FIXING OF LT LUGS 150 SQ MM |
| 123 | PROVIDING AND FIXING OF LT LUGS 16 SQ MM |
| 124 | THE FOLLWING MATERIAL WILL BE PROVIDED AND FIXING BY THE CONTRACTOR |
| 125 | PEIRCING CLAMP |
| 126 | SUSPENSION CLAMP |
| 127 | DEAD & CLAMP |
| 128 | I-HOOK |
| 129 | HOLDING CLAMP WITH NUT & BOLT |
| 130 | NUT & BOLT |
| 131 | DANGER BOARD WITH CLAMP |
| 132 | F-CLAMP |
| 133 | fctusl Iyku ;kstuk ds vUrxZr fo|qr forj.k [k.M eksnhuxj ds dk;Z{ks= esa 11@-04 dsoh midsUnzksa dh {kerko`f)@fuekZ.k dk dk;ZAc½ vfrHkkfjr ifjorZdksa dh {kerko`f) dk dk;ZA |
| 134 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM STORE CENTER MODINAGAR/ANY OTHER PLACE TO JE STORE/SITE OF WORK INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 135 | PCC POLE 8.5 MTR LONG |
| 136 | PCC POLE 11 MTR LONG |
| 137 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM STORE CENTER MODINAGAR/ANY OTHER PLACE TO JE SUB STATION INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 138 | LT ABC 3X120 |
| 139 | LT ABC 3X95 |
| 140 | LT ABC 3X50 |
| 141 | LT LEAD 1X240 |
| 142 | 250 KVA TF |
| 143 | 100 KVA TF |
| 144 | 63 KVA TF |
| 145 | 11 KV FUSE SET |
| 146 | EARTHING COMPLETE |
| 147 | ACSR WEASEL |
| 148 | 11 KV POLYMERIC PIN |
| 149 | MS CHANNEL |
| 150 | 11 KV POLYMERIC DISC |
| 151 | DISTRIBUTION BOX |
| 152 | STAY SET WITH COMPLETE |
| 153 | SAFE CARTAGE OF CENTRALIZED LINE MATERIAL FROM JE SUB STATION TO MODINAGAR/ANY OTHER PLACE TO PIT SITE INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 154 | LT ABC 3X120 |
| 155 | LT ABC 3X95 |
| 156 | LT ABC 3X50 |
| 157 | LT LEAD 1X240 |
| 158 | 250 KVA TF |
| 159 | 100 KVA TF |
| 160 | 63 KVA TF |
| 161 | 11 KV FUSE SET |
| 162 | EARTHING COMPLETE |
| 163 | ACSR WEASEL |
| 164 | 11 KV POLYMERIC PIN |
| 165 | MS CHANNEL |
| 166 | 11 KV POLYMERIC DISC |
| 167 | DISTRIBUTION BOX |
| 168 | STAY SET WITH COMPLETE |
| 169 | SAFE CARTAGE OF DECNTRALIZED LINE MATERIAL FROM CONTRACTOR TO JE SUB STATION/ANY OTHER PLACE/AT SITE INCLUDING LOADING AND UNLOADING AT BOTH END. |
| 170 | DEAD END CLAMP |
| 171 | EYE HOOK |
| 172 | PRC CLAMP |
| 173 | SUSPENSION CLAMP |
| 174 | CLAMP WITH NUT & BOLT |
| 175 | LT LUGS 1X240 |
| 176 | LT LUGS 150 SQ MM |
| 177 | LT PVC CABLE 3.5X150/70 SQ MM |
| 178 | DANGER BOARD WITH CLAMP |
| 179 | LT LEAD 1X16 |
| 180 | LT LUGS 1X16 |
| 181 | CHEMICAL EARTHING |
| 182 | COPPER L PIECE |
| 183 | ERECTION OF SINGLE POLE ALL SIZE AS PER RESPO DRAWING, FITTING WITH ALL ACCESSORIES PIN INSULATOR, F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 184 | PCC POLE 8.5 MTR LONG |
| 185 | PCC POLE 11 MTR LONG |
| 186 | ERECTION OF DOBULE POLE ST POLE 11 MTR LONG OF 33 KV FITTINGS AS PER RESPO DRAWING TOP CHANNAL, DROPPER CHANNAL, X BRACING SET, DISC INSULATOR, PIN INSULATOR, GUARDING ANGLE F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 187 | PCC POLE 8.5 MTR LONG |
| 188 | PCC POLE 11 MTR LONG |
| 189 | EXCAVATION OF FOR EACH AND GROUTING OF SINGLE POLE AS PER RESPO DRAWING AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE PAD ETC. AS PER ACTUAL SITE REQUIREMENT |
| 190 | PCC POLE 8.5 MTR LONG |
| 191 | PCC POLE 11 MTR LONG |
| 192 | ERECTION OF DOBULE POLE ALL SIZE AS PER RESPO DRAWING, FITTING WITH ALL ACCESSORIES PIN INSULATOR, F BRACKET AND ETC AS PER DIRECTION OF ENGINEER INCHARGE INCLUDING THE COST OF LABOUR, T&P AND CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 193 | PCC POLE 8.5 MTR LONG |
| 194 | PCC POLE 11 MTR LONG |
| 195 | PROVIDING & FIXING OF PLINTH OF POLE/KIKING OF POLE UP NUTUREL GROUND LEVEL. |
| 196 | FIXING OF 11 KV STAY SET |
| 197 | GROUTING OF 11 KV STAY SET INCLUDING THE WORK OF NOZELLING ETC. AS PER RESPO MANUAL AND ALSO INCLUDING THE COST OF ALL THE SUPPORT SHALL BE GROUTED WITH CEMENT, SAND AND STONE BALLAST IN RATIO 1:4:8 INCLUDING THE COST OF CEMENT, SAND, STONE BALLAST, STONE ETC. AS PER ACTUAL SITE REQUIREMENT , LABOUR, T&P ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 198 | LAYING SAGGING STRINGING AND BINDING AND JUMPERING ETC OF FOLLOWING CONDUCTOR/ABC/XLPE OF SIZE ON THE NEWLY ERECTED POLES AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDES THE COST OF LABOUR, T&P, CARRIER ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 199 | LT ABC 3X120 |
| 200 | LT ABC 3X95 |
| 201 | LT ABC 3X50 |
| 202 | ACSR WEASEL CONDUCTOR |
| 203 | MOUNTING OF DISTRIBUTION TRANSFORMERS. |
| 204 | 11.2 T/F 100 KVA 11/0.4 KV |
| 205 | 11.3 T/F 250 KVA 11/0.4 KV |
| 206 | 11.4 T/F 63 KVA 11/0.4 KV |
| 207 | INSTALLATION AND FIXING OF DISTRIBUTION TRANSFORMERS. |
| 208 | 11.2 T/F 100 KVA 11/0.4 KV |
| 209 | 11.3 T/F 250 KVA 11/0.4 KV |
| 210 | 11.4 T/F 63 KVA 11/0.4 KV |
| 211 | FIXING AND HANGING OF LT LEAD 1X16 AND 1X240 SQ MM ON POLE. |
| 212 | FIXING OF EARTHING ROD AND WIRE AS PER RESPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER INCLUDING THE COST OF LABOUR, T&P ETC. REQUIRED FOR PROPER COMPLETION OF WORK. |
| 213 | CUTTING/DRILLING/WELDING OF MS CHANNEL TOP CHANNAL, SITE CHANNEL, SITE ANGLE, DROPPER CHANNAL & CROSS BRASSING ANGLE AND MS MATTRIEL INCLUDING THE WORK OF FIXING ON STP POLE FOR CONSTRUCTION OF THE LINE. |
| 214 | MAKING JUMPERS ON SECTION POINTS, BY FIXING OF PROPER SIZES, SUITABLE FOR ACSR CONDUCTOR. SECTIONAL DOUBLE/FOUR POLE. |
| 215 | MAKING OF NEW PLINTH WITH MATERIAL SAND BRICK ETC.OF SIZE 6X6X6 SQ FT FOR DISTRIBUTION TRANSFORMERS. |
| 216 | MAKING OF FENCING FOR DISTRIBUTION TRANSFORMERS. |
| 217 | FIXING OF 11 KV PIN INSULATER |
| 218 | FIXING OF 11 KV DISC INSULATER |
| 219 | FIXING OF THREE PHASE DISTRIBUTION BOX DIRECTION OF ENGINEER INCHARGE |
| 220 | FIXING OF 11 KV FUSE SET |
| 221 | PROVIDING AND FIXING OF CHEMICAL EARTHING |
| 222 | PROVIDING AND FIXING OF GI STRIP FOR EARTHING REGARDING |
| 223 | POVIDING AND FIXING OF COPPER L PIECE |
| 224 | PROVIDING AND FIXING OF LT LUGS 240 SQ MM |
| 225 | PROVIDING AND FIXING OF LT LUGS 150 SQ MM |
| 226 | PROVIDING AND FIXING OF LT LUGS 16 SQ MM |
| 227 | THE FOLLWING MATERIAL WILL BE PROVIDED AND FIXING BY THE CONTRACTOR |
| 228 | PEIRCING CLAMP |
| 229 | SUSPENSION CLAMP |
| 230 | DEAD & CLAMP |
| 231 | I-HOOK |
| 232 | HOLDING CLAMP WITH NUT & BOLT |
| 233 | NUT & BOLT |
| 234 | DANGER BOARD WITH CLAMP |
| 235 | F-CLAMP |
| 236 | MATERIAL RECEIVED BACK FROM SITE TO JE SUB STATION/STORE CENTRE MODINAGAR |
| 237 | 100 KVA OLD AND USED |
| 238 | 63 KVA OLD AND USED |
| 239 | 25 KVA OLD AND USED |
| 240 | STP POLE SCRAP Please Enable Macros to View BoQ information |