|
| 1 | fctusl Iyku ;kstuk 2026&27 ds vUrxZr fo/kqr forj.k [k.M eqjknuxj ds vUrxZr 11@-04 dsoh midsUnzksa dh {kerko`f)@fuekZ.k dk dk;ZA |
| 2 | Carriage of followings from ESC. to pit site on kachcha pacca road including loading and unloading chagres at both ends, required for proper completion of work, distance about to 60 Kms. |
| 3 | PCC Pole 8.5 mtr Long. |
| 4 | ST POLE 11 Mtr Long. |
| 5 | LT PVC Lead. |
| 6 | LT ABC Cable. |
| 7 | 25/63/100 KVA T/F |
| 8 | 250 KVA T/F |
| 9 | 400 KVA T/F |
| 10 | Carriage of All line Material from store centre to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthing Rods, Disc Insulator etc. |
| 11 | Erection of Single PCC/ST pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Erection of Double PCC/ST pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Grouting of Single support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | Construction of Plinth 0.4 KVA T/F. |
| 15 | Providing & Fixing of Wiremess Fencing Around the 11/0.4 KVA T/F Plinth. |
| 16 | Providing & fixing of Tail less Unit for T/F. |
| 17 | Providing & Fixing of Chemical Earthing for 0.4 KVA T/F. |
| 18 | Dismantling/ Opening of old T/F From Double Pole & Shifting up to J.E Store/Sub Station. |
| 19 | 25/63/100 KVA T/F |
| 20 | 250 KVA T/F |
| 21 | Erection & Mounting & Installation of Transformers on DP/Plinth including loading and unloading charges at both ends, required for proper completion of work and Jumpering Properly. |
| 22 | 25/63/100 KVA T/F |
| 23 | 250 KVA T/F |
| 24 | 400 KVA T/F |
| 25 | Erection & Fixing of 11 Kv Stay rod with Stay wire in proper way with Nozeling |
| 26 | Grouting of 11 Kv Stay rods |
| 27 | Jumpering Work. |
| 28 | Laying, sagging. Stringing and binding and jumpering of Condcutor, newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. |
| 29 | ACSR Weasel Conductor. |
| 30 | ABC Cable. |
| 31 | ABC Cable 3*95 sq mm. |
| 32 | ABC Cable 3*120 sq mm. |
| 33 | Laying & Properly Connection of LT PVC Cable Leads With Transformers. |
| 34 | Erection & Fixing of Fuse Set. |
| 35 | Fixing of Earthing rod |
| 36 | Fixing of pin insulator |
| 37 | Fixing disc insulator |
| 38 | Fabrication & Fixing of V Type X rm/Toff Channel |
| 39 | Fixing of Distribution Box. |
| 40 | Fixing of Top/Drop Channel |
| 41 | The following material is required to be supplied by the contractor. |
| 42 | LT clamp |
| 43 | Stay Clamp |
| 44 | MS Clamp |
| 45 | Nut & Bolt |
| 46 | Peircing Clamp |
| 47 | Dead & clamps |
| 48 | Suspension clamps |
| 49 | Al. Crimping Lugs 400 sq mm |
| 50 | Al. Crimping Lugs 240 sq mm |
| 51 | Al. Crimping Lugs 95/120 sq mm |
| 52 | Carriage of Old Material 25/63/100/250 KVA T/F. Please Enable Macros to View BoQ information |