| 1 | Detail of Work |
| 2 | Safely cartage of PCC Pole 8.5/11 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 50 KM.) |
| 3 | Safely cartage of STP Pole 13 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 50 KM.) |
| 4 | Providing of Wheel base Mobile Transformer Trolley with fencing suitable for 100 KVA T/F . |
| 5 | Safely Fixing of 100 KVA T/F at Mobile Trolley and Connection properly with LT PVC Cable 3.5x240 sq.mm |
| 6 | Laying of LT PVC cable 3.5*240/3.5x150/70 sq.mm as per repo specification. |
| 7 | Providing and fixing of AI LEG LONG BARREL OFF SIZE (LS) |
| 8 | Providing And fixing of Stone Pad 300x300x75mm |
| 9 | Safe cartage of Line Matrial from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 50 km.) |
| 10 | Safe cartage of 25/63/100 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 50km.) |
| 11 | Safe cartage of 11 KV Fuse Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 40 km.) |
| 12 | Safe cartage of 11 KV TPMO from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 50 km.) |
| 13 | Safe cartage of ABC Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 50 km.) |
| 14 | Safe cartage of Rebbit Conductor from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 50 km.) |
| 15 | Safely Cartage of 11 KV XLPE Cable (3x120sq.mm) from ESC SRE to Site of work including loading and unloading at both ends. |
| 16 | Fabrication & Erection of double Pole on PCC poles up to 8.5/11 Mtr Long with complete fitting with all accessories complete. |
| 17 | Safe installation of 25/63/100 KVA T/F on the double pole with complete fittings including making connections and commissioning. |
| 18 | Safely Installation of 11 KV Fuse set and connection properly. |
| 19 | Safely Installation of 11 KV TPMO and connection properly. |
| 20 | Laying of 11 KV XLPE Cable size 3x120 sq,mm |
| 21 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line including complete. |
| 22 | Making and Filling the 11 KV cable jointing kit indoor/outdoor type size 3x120 Sqmm. sq.mm as per RESPO specification. |
| 23 | Fixing of 11 KV 3x120 sq.mm joiting kit straight through |
| 24 | Providing and fixing MS Channel 125x65x1300 mm (T-OFF) |
| 25 | Providing and fixing MS Channel 125x65x1300 mm (T-OFF) |
| 26 | Providing and fixing Top MS Channel 125x65x2240 mm |
| 27 | Providing and fixing MS Channel 100x50x2028 mm |
| 28 | Providing and fixing MS Channel |
| 29 | Providing and fixing MS Angle |
| 30 | Providing and fixing MS Angle 75x75x6x2028 mm with clamp and bolt and nut (T/F base) |
| 31 | Providing and fixing of Clamp of T-OFF with nut & Bolts |
| 32 | Fixing of 11 KV Disc insulator |
| 33 | Fixing of 11 KV Disc Fitting |
| 34 | Fixing of 11 KV Polymeric Pin Insulator 11 KV with pin |
| 35 | Fixing of V-type X-arm |
| 36 | Providing and fixing of Danger Board barbed wire including jumper. |
| 37 | Providing and fixing Barbed wire |
| 38 | Providing and fixing Dead & Clamp |
| 39 | Providing and fixing Suspension clamp |
| 40 | Providing and fixing PRC clamp |
| 41 | Providing and fixing of Holding clamp with nut & Bolt |
| 42 | Providing and fixing of J-hook |
| 43 | Providing and fixing of I-hook |
| 44 | Providing and fixing of PG Clamp |
| 45 | Providing and fixing LT Fuse Set protection unit for 100 KVA DT with SMC Box |
| 46 | Providing and fixing LT Fuse Set protection unit for 63 KVA DT with SMC Box |
| 47 | Fixing of Distribution Box |
| 48 | Erection of single support on PCC Pole up to 8.5/11Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 49 | Erection of single support on STP Pole up to 13 Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 50 | Concreting of Pole |
| 51 | Concreting of Stay |
| 52 | Earthing of pole/TF MS Earthing Road of 20x2500 mm & 6SWG earthwire etc |
| 53 | Providing and fixing of All type Clamp |
| 54 | Providing and fixing of Nut & Bolt defference size |
| 55 | Providing and fixing of I bolt |
| 56 | Fixing of 11 KV stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/8 SWG and fitting the same on the pole |
| 57 | Providing and fixing of AI LEG LONG BARREL OFF SIZE (LS) |
| 58 | Providing and fixing of LT INCOMING PANNEL WITH METERING EQUIPEMENT |
| 59 | Removal of 10/16/25/63/100 kva t/f from the D/P and cartage site of work to ESC SRE including loading and unloding at both ends |
| 60 | Removal of old and used weasel conductor and making roll site of work to ESC SRE including loading and unloding at both ends |
| 61 | Removal of old and used X-arm site of work to ESC SRE including loading and unloding at both ends |
| 62 | Laying, lifting, Stringing, proper sagging ABC cable of size 3x50/3x95/3x120 sq.mm. including fixing of all accessories. |
| 63 | Laying of Connecting lead 1x16 sq.mm/LT PVC Cable 3.5x150 Please Enable Macros to View BoQ information |