| 1 | 33/11 KV 10 MVA Transformer | 33/11 KV 10 MVA Transformer |
| 2 | 3×300 mm2, 11 KV XLPE Cable | 3×300 mm2, 11 KV XLPE Cable |
| 3 | 11 KV cable jointing kit 3×300 mm outdoor heat shrinkable Type | 11 KV cable jointing kit 3×300 mm outdoor heat shrinkable Type |
| 4 | 11 KV cable jointing kit 3×300mm indoor heat shrinkable Type | 11 KV cable jointing kit 3×300mm indoor heat shrinkable Type |
| 5 | Digging & Laying of 11 KV Cable including cost of sand & Bricks | Digging & Laying of 11 KV Cable including cost of sand & Bricks |
| 6 | 2×2.5 mm2 Control Cable | 2×2.5 mm2 Control Cable |
| 7 | Laying of various type of control cables | Laying of various type of control cables |
| 8 | Chemical Pipe Earthing | Chemical Pipe Earthing |
| 9 | \\"L\\" Type Structure for Neutral : Fabrication and grouting of Channel 100x50x6 mm. in L shape & in proper size and alignment to provide support for separate Earthing strips for power transformer neutral including supply & fixing of flexible copper earth braid (0.5 Mtr. long 65x8 mm size) bonds for neutral Earthing. Making delta by 6 nos. earthing electrodes of 32 mm dia. (including fabrication of earthing electrodes) will be connected to neutral earthing through separate earthing strip (as per RESPO). The work also includes painting of Channel with two coats of aluminium paint and the cost of all material with all labour and T&P etc. complete in all respect. | \\"L\\" Type Structure for Neutral : Fabrication and grouting of Channel 100x50x6 mm. in L shape & in proper size and alignment to provide support for separate Earthing strips for power transformer neutral including supply & fixing of flexible copper earth braid (0.5 Mtr. long 65x8 mm size) bonds for neutral Earthing. Making delta by 6 nos. earthing electrodes of 32 mm dia. (including fabrication of earthing electrodes) will be connected to neutral earthing through separate earthing strip (as per RESPO). The work also includes painting of Channel with two coats of aluminium paint and the cost of all material with all labour and T&P etc. complete in all respect. |
| 10 | Structure For cable support : Fabrication and erection of cable support made of two pieces of 100x50x6 mm. (4.5 x 2 No. = 9.0 mtr. long), joined to each other by means of 5 Nos. flat 50x6 mm. pieces of size 150 mm. long each by welding at equal intervals as per drawing and exacavation of earth in all type of soil (0.75x0.7x0.5 Mtr.) and grouting and plinthing of cable stand (1x0.75x0.5 Mtr.). Above work also include two coats of Aluminum paint and the cost of all material with all labour and T&P etc. complete in all respect. | Structure For cable support : Fabrication and erection of cable support made of two pieces of 100x50x6 mm. (4.5 x 2 No. = 9.0 mtr. long), joined to each other by means of 5 Nos. flat 50x6 mm. pieces of size 150 mm. long each by welding at equal intervals as per drawing and exacavation of earth in all type of soil (0.75x0.7x0.5 Mtr.) and grouting and plinthing of cable stand (1x0.75x0.5 Mtr.). Above work also include two coats of Aluminum paint and the cost of all material with all labour and T&P etc. complete in all respect. |
| 11 | Chakkered Rubber Mat 2000x1000x10 mm I.S.I. Mark | Chakkered Rubber Mat 2000x1000x10 mm I.S.I. Mark |
| 12 | Sundries (Protection board with connection, etc.) | Sundries (Protection board with connection, etc.) |
| 13 | Making Connection of Transformer LT & HT,Dismantling and Re-welding of Body and Neutral Earthing of Transformer | Making Connection of Transformer LT & HT,Dismantling and Re-welding of Body and Neutral Earthing of Transformer |
| 14 | Dismantling of old Transformer from plinth and kept aside in switchyard | Dismantling of old Transformer from plinth and kept aside in switchyard |
| 15 | Hiring of D/G Set 63 KVA 3 Phase for Testing of T/F | Hiring of D/G Set 63 KVA 3 Phase for Testing of T/F |
| 16 | Carriage of following material from Center Store to Site: 3×300 mm2, 11 KV XLPE Cable | Carriage of following material from Center Store to Site: 3×300 mm2, 11 KV XLPE Cable |