| 1 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 2 | PCC Pole 11 mtr long |
| 3 | PCC Pole 8.5 mtr long |
| 4 | 11 KV X-arm |
| 5 | 33 KV V type X-arm |
| 6 | Stay Set Complete |
| 7 | Earthing Rod Complete |
| 8 | 11 KV Pin Insulator with Pin |
| 9 | 33 KV Pin Insulator with Pin |
| 10 | T-off channel |
| 11 | ACSR Dog Conductor |
| 12 | 11 KV XLPE Cable 3x300 sq.mm |
| 13 | 11 KV XLPE Cable 3x185 sq.mm |
| 14 | 11 KV Cable Box 3x300 sq.mm Outdoor |
| 15 | 11 KV Cable Box 3x185 sq.mm |
| 16 | ACSR Rabbit Conductor |
| 17 | 11 KV Disc Insulator |
| 18 | 33 KV Disc Insulator with fitting |
| 19 | GI Wire 6 SWG |
| 20 | Gaurding Angle |
| 21 | ACSR Weasal Conducotr |
| 22 | 11 KV Cable Box 3x120 sq.mm |
| 23 | 11 KV XLPE Cable 3x120 sq.mm |
| 24 | MS Channel |
| 25 | 33 KV XLPE Cable 3x300 sq.mm |
| 26 | 33 KV XLPE Cable 3x120 sq.mm |
| 27 | 33 KV Cable Jointing Kit 3x300 sq.mm |
| 28 | Bracing Angle |
| 29 | Errection PCC Pole 11/8.5 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting of the pole with proper ramming after completion of work. |
| 30 | Errection of Double PCC Pole 11 mtr long/PCC pole 8.5 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of Soil for each pole including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. |
| 31 | Laying of 11 KV XLPE Cable 3x300 sq.mm |
| 32 | Laying of 11 KV XLPE Cable 3x185 sq.mm |
| 33 | Laying of 11 KV XLPE Cable 3x120 sq.mm |
| 34 | Laying of 33 KV XLPE Cable 3x300 sq.mm |
| 35 | Laying of 33 KV XLPE Cable 3x120 sq.mm |
| 36 | Laying of ACSR Dog Conductor |
| 37 | Laying of ACSR Rabbit Conductor |
| 38 | Laying of GI Wire 6 SWG |
| 39 | Fixing of 11 KV X-arm |
| 40 | Fixing of 11 KV Cable Box 3x300 sq.mm Outdoor |
| 41 | Fixing of 11 KV Cable Box 3x185 sq.mm |
| 42 | Fixing of 11 KV Cable Box 3x120 sq.mm |
| 43 | Fixing of 11 KV Pin Insulator with Pin |
| 44 | Fixing of T-off channel |
| 45 | Fixing of Gaurding Angle |
| 46 | Fixing of MS Channel |
| 47 | Fixing of 11 kv disc insulator |
| 48 | Fixing of Bracing Angle |
| 49 | Fixing of 33 kv Pin Insulator with fitting |
| 50 | Fixing of 33 kv Disc Insulator with fitting |
| 51 | Fixing of 33 KV V Type X-arm |
| 52 | Fixing of 33 KV Jointing Kit 3x300 sq.mm |
| 53 | Fixing of Stay set for 33 kv & 11 kv complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 54 | Fixing of MS Earthing rod of each 33 kv & 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. |
| 55 | Providing and fixing GI Pipe 6\\" dia (Supporting for Cable for DP) |
| 56 | Providing and fixing HDPE Pipe |
| 57 | Providing and fixing Holding Clamp |
| 58 | Laying Charges |
| 59 | Providing and fixing Stone Pad |
| 60 | Providing and fixing F bracket |
| 61 | Grouting of Pole |
| 62 | Grouting of Stay |
| 63 | Laying of digging charges |
| 64 | Providing and fixing of J hook |
| 65 | Providing and fixing of Clamp with nut and bolt |
| 66 | Providing and fixing of MS Nut and bolts |
| 67 | Providing and fixing of Suspension Clamp |
| 68 | Received back material for ST Pole off size |
| 69 | Received back material ACSR Weasal conducor old and used |
| 70 | Received back material ACSR Dog conducor old and used |
| 71 | Received back material 3x300 sq.mm XLPE Cable |
| 72 | Received back material 3x185 sq.mm XLPE Cable |
| 73 | Received back material GI Wire |
| 74 | Received back material AB Cable 3z120 sq.mm |
| 75 | Received back material 11 KV XLPE Cable Please Enable Macros to View BoQ information |