| 1 | Loading, carriage & unloading of following centralized materials from centre store (ESC Lakhimpur) to work site and its stacking. Distance approx (0-90) kms. Under work area of EDD Nighasan. |
| 2 | PCC/ST pole 8.5/9/11 Mtr long |
| 3 | 11 kv Polymeric Disc Insulator with fitting |
| 4 | 11 kv Polymeric Pin Insulator with GI pins |
| 5 | Distribution Box 3 Phase |
| 6 | ACSR Rabit/Dog /Racoon/weasel/ conductor |
| 7 | ABC( 3x95+ 1x70 + 1x16) Sqmm. |
| 8 | 11 KV Fuse Set |
| 9 | 11 KV Stay Set |
| 10 | Earth rod |
| 11 | Line Material (V-type X-arm, F-Clamp, T-off, Channel, Angles, Top , Dropper etc) |
| 12 | Loading, carriage & unloading of 100kVA Additional New TF with other material which are included in estimate from centre store to work site at RAKEHTI DHAKHERWA ROAD, VILLAGE- TIKONIYA and VILLAGE - BELARAYA with its stacking. successfully energization Under work area of EDD-Nighasan. |
| 13 | Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 40 feet deep) as per standard practice (All materials shall be provided by the contractor) in work area of RAKEHTI DHAKHERWA ROAD, VILLAGE- TIKONIYA and VILLAGE - BELARAYA Under EDD-Nighasan. |
| 14 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only stay rod and Stay wire shall be supplied by the Department. |
| 15 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. |
| 16 | Supply and Fixing of Decentralized Material |
| 17 | Danger board with Clamp |
| 18 | Barbed wire |
| 19 | Alluminium Lug 120 mm |
| 20 | LT Clamp |
| 21 | Eye hook |
| 22 | Suspension Clamp |
| 23 | Dead end Clamp |
| 24 | Holding Clamp |
| 25 | Stay Clamp |
| 26 | Stay Insulator |
| 27 | Loading, carriage & unloading of 25kVA Additional New TF with other material which are included in estimate from centre store to work site at VILLAGE BHAGAUDIYA with its stacking. successfully energization Under work area of EDD-Nighasan. |
| 28 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only stay rod and Stay wire shall be supplied by the Department. |
| 29 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. |
| 30 | Supply and Fixing of Decentralized Material |
| 31 | Danger board with Clamp |
| 32 | Barbed wire |
| 33 | Alluminium Lug 120 mm |
| 34 | LT Clamp |
| 35 | Eye hook |
| 36 | Suspension Clamp |
| 37 | Dead end Clamp |
| 38 | Holding Clamp |
| 39 | Stay Clamp |
| 40 | Stay Insulator |
| 41 | Loading, carriage, unloading & Errection of 250kVA TF with other material which are included in estimate from centre store to work site BARSOLA KALA TIKONIYA, SINDHAUNA TIKONIYA, BELAPRSUWA, BANVEER PUR TIKONIYA, SAHENKHERA TIKONIYA, KHAMARIYA KOILAR TIKONIYA, BELRAYAN STATION KE PAS TIKONIYA, BANVEERPUR GANO KE ANSDAR TIKONIYA, MURTIHA TIKONIYA and NIBORIYA TIKONIYA with its stacking. Dismounting & carriage of old TF of 100kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. |
| 42 | Constrution of plinth for 250kVA Distribution Transformer of size 5X7X4 cu.ft. with first class bricks, cement and coarse sand as per RESPO Norms alongwith cost of materials. work site BARSOLA KALA TIKONIYA, SINDHAUNA TIKONIYA, BELAPRSUWA, BANVEER PUR TIKONIYA, SAHENKHERA TIKONIYA, KHAMARIYA KOILAR TIKONIYA, BELRAYAN STATION KE PAS TIKONIYA, BANVEERPUR GANO KE ANSDAR TIKONIYA, MURTIHA TIKONIYA, NIBORIYA TIKONIYA (Sub Station Tikonia) Under EDD-Nighasan. |
| 43 | Construction of new FRP (Fiber Reinforced Plastic) Fencing Up to 14 RMT (running meter) with gate of 250kVA distribution Transformers installed under EDD-Nighasan. Work area work site BARSOLA KALA TIKONIYA, SINDHAUNA TIKONIYA, BELAPRSUWA, BANVEER PUR TIKONIYA, SAHENKHERA TIKONIYA, KHAMARIYA KOILAR TIKONIYA, BELRAYAN STATION KE PAS TIKONIYA, BANVEERPUR GANO KE ANSDAR TIKONIYA, MURTIHA TIKONIYA and NIBORIYA TIKONIYA (Sub Station Tikonia) Under EDD-Nighasan. |
| 44 | Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 40 feet deep) as per standard practice (All materials shall be provided by the contractor) in work area of BARSOLA KALA TIKONIYA, SINDHAUNA TIKONIYA, BELAPRSUWA, BANVEER PUR TIKONIYA, SAHENKHERA TIKONIYA, KHAMARIYA KOILAR TIKONIYA, BELRAYAN STATION KE PAS TIKONIYA, BANVEERPUR GANO KE ANSDAR TIKONIYA, MURTIHA TIKONIYA, NIBORIYA TIKONIYA (Sub Station Tikonia) Under EDD-Nighasan. |
| 45 | Fabrication of structure for 10 no. Tailless Unit using 65x65x6 mm MS Angle (8 mtr. total length) including grouting of 2 no. angles 900 mm depth, providing and fixing of 8 no. suitable size of lugs and making ends of the LT cable of 250 kva distribution T/F and necessary extension of the fencing will be done by the contractor as per site requirement upto total length of fencing 2 mtr. with providing by the Contractor all material, labour and t&p required for proper completion under EDD Nighasan. |
| 46 | Supply & fixing of Decentralized Materials |
| 47 | Alluminium Lug 400 mm |
| 48 | Alluminium Lug 240 mm sq. |
| 49 | Copper L-Pice 50x50x06 mm |
| 50 | Loading, carriage, unloading & Errection of 100 kVA New TF with other material which are included in estimate from centre store to work site PANJABI COLONY TIKONIYA, TAYAR CHAURAHA TIKONIYA, BELAPRSUWA, KHAMARIYA KOILAR, ATKATAHILA FARM, SAHEN KHERA, RAMUA PUR, BANVEERPUR CHAMRAUDHA, GANGA NAGAR, BABBU SAHAB, BAGIYA MOHALLA TIKONIYA, BELRAYAN TIKONIYA, KHAIRATIYA STATION TIKONIYA and JASNAGAR TIKONIYA with its stacking. Dismounting & carriage of old TF of 63 kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. |
| 51 | Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 40 feet deep) as per standard practice (All materials shall be provided by the contractor) in work area of PANJABI COLONY TIKONIYA, TAYAR CHAURAHA TIKONIYA, BELAPRSUWA, KHAMARIYA KOILAR, ATKATAHILA FARM, SAHEN KHERA, RAMUA PUR, BANVEERPUR CHAMRAUDHA, GANGA NAGAR, BABBU SAHAB, BAGIYA MOHALLA TIKONIYA, BELRAYAN TIKONIYA, KHAIRATIYA STATION TIKONIYA and JASNAGAR TIKONIYA (Sub Station Tikonia) Under EDD-Nighasan. |
| 52 | Loading, carriage, unloading & Errection of 63 kVA New TF with other material which are included in estimate from centre store to work site VILLEGE AJAMUDDIN KE SAMNE TIKONIYA, GURUDWARA BELAPARSUWA, BAIJNATH PURWA, SINDHAUNA, BABA PUR KAUDIYALA GHAT, BELAPARSUWA ROAD KADIYA, SIDHAUNA, VILLEGE MAL GODAM TIKONIYA,VILLEGE AT SUTHANA BARSOLA TIKONIYA, VILLEGE AT NAYI KOTWALI TIKONIYA, VILLEGE AT CHAKKAR PUR TIKONIYA, VILLEGE AT DEVI MANDIR TIKONIYA, VILLEGE AT KHAIRATIYA GURDWARA TIKONIYA, VILLEGE AT KHAIRAGAUDI TIKONIYA, VILLEGE AT KHAIRATIYA PARGAT PRADHAN TIKONIYA, VILLEGE AT BANVEERPUR BAJRANGBALI MANDIR KE PAS TIKONIYA, VILLEGE AT GANGANAGAR GURUDWARA KE PICHHE TIKONIYA, VILLEGE AT GURUCHARAN SINGH GANGA NAGAR TIKONIYA, VILLEGE AT RAN NAGAR CHAURAHA TIKONIYA, VILLEGE AT MALUK PRADHAN RAN NAGAR TIKONIYA, VILLEGE AT BHAJAN CHAHEL RAN NAGAR TIKONIYA, VILLEGE AT BASANTAPUR TIKONIYA and VILLEGE AT SINDHAUNA DURGA MANDIR TIKONIYA with its stacking. Dismounting & carriage of old TF of 25 kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. Please Enable Macros to View BoQ information |