| 1 | Loading, carriage & unloading of following centralized materials from centre store (ESC Lakhimpur) to work site and its stacking. Distance approx (0-90) kms. Under work area of EDD Nighasan. |
| 2 | PCC/ST pole 8.5/9/11 Mtr long |
| 3 | 11 kv Polymeric Disc Insulator with fitting |
| 4 | 11 kv Polymeric Pin Insulator with GI pins |
| 5 | ACSR Rabit/Dog /Racoon/weasel/ conductor |
| 6 | ABC( 3x95+ 1x70 + 1x16) Sqmm. |
| 7 | 11 KV Fuse Set |
| 8 | Earth Rod |
| 9 | 11 KV Stay Set |
| 10 | Line Material (V-type X-arm, F-Clamp, T-off, Channel, Angles, Top , Dropper, GI Wire 5mm, stay wrie etc) |
| 11 | Loading, carriage & unloading of 100 kVA Additional TF with other material which are included in estimate from centre store to work site at NEAR BUS STOP DHAURAHRA, NEAR CINEMA CHAURAHA DHAURAHRA, VILLAGE DEVIPURWA, VILLAGE SISIYYA CHAURAHA, VILLAGE SISIYYAPANI TANKI, VILLAGE SISIYYAPANI HOSPITAL and VILLAGE RAMNAGAR LAHBADI with its stacking. successfully energization Under work area of EDD-Nighasan. |
| 12 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only stay rod and Stay wire shall be supplied by the Department. |
| 13 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. |
| 14 | Supply & fixing of Decentralized Materials |
| 15 | Danger board with Clamp |
| 16 | Barbed wire |
| 17 | Alluminium Lug 120 mm |
| 18 | LT Clamp |
| 19 | Eye hook |
| 20 | Suspension Clamp |
| 21 | Dead end Clamp |
| 22 | Holding Clamp |
| 23 | Stay Clamp |
| 24 | Stay Insulator |
| 25 | Loading, carriage, unloading & Errection of 250 kVA TF with other material which are included in estimate from centre store to work site VILL.BEERSINGPUR CHAURAHA and VILL.ISANAGR CENTER with its stacking. Dismounting & carriage of old TF of 100 kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. |
| 26 | Construction new plinth of 250 KVA Distribution transformer of size 5x5x4 Fit with first class bricks, cement and coarse sand as per RESPO Norms alongwith cost of materials. to work site VILL.BEERSINGPUR CHAURAHA and VILL.ISANAGR CENTER work area of under EDD-Nighasan. |
| 27 | Construction of new FRP (Fiber Reinforced Plastic) Fencing Up to 14 RMT (running meter) with gate of 250kVA distribution Transformers installed under EDD-Nighasan. Work area work site VILL.BEERSINGPUR CHAURAHA and VILL.ISANAGR CENTER (Sub Station Dhaurahra) Under EDD-Nighasan. |
| 28 | Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 40 feet deep) as per standard practice (Al materials shall be provided by the contractor) in work area of VILL.BEERSINGPUR CHAURAHA and VILL.ISANAGR CENTER Under EDD-Nighasan. |
| 29 | Fabrication of structure for 2 no.Tailless Units using 65x65x6 mm MS Angle (8 mtr. total length) including grouting of 2 no. angles 900 mm depth, providing and fixing of 8 no. suitable size of lugs and making ends of the LT cable of 250 kva distribution T/F and necessary extension of the fencing will be done by the contractor as per site requirement upto total length of fencing 2 mtr. with providing by the Contractor all material, labour and t&p required for proper completion under EDD Nighasan. |
| 30 | Supply & fixing of Decentralized Materials |
| 31 | Alluminium Lug 400 mm |
| 32 | Alluminium Lug 240 mm sq. |
| 33 | Copper L-Pice 50x50x06 mm |
| 34 | Loading, carriage, unloading & Errection of 100 kVA TF with other material which are included in estimate from centre store to work site VILLEGE KALUWAPUR FIRST, VILLEGE KALUWAPUR SECUND and VILLEGE MOHAMMDAPUR with its stacking. Dismounting & carriage of old TF of 63 kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. |
| 35 | Work for earthing of Distribution Transformer with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 40 feet deep) as per standard practice (All materials shall be provided by the contractor) in work area of VILLEGE KALUWAPUR FIRST, VILLEGE KALUWAPUR SECUND and VILLEGE MOHAMMDAPUR Under EDD-Nighasan. |
| 36 | Loading, carriage, unloading & Errection of 63 kVA New TF with other material which are included in estimate from centre store to work site VILL BLOCK DHAURAHRA, VILLEGE JASWANT NAGAR, VILLEGECHAHLUA CHAURAHA, VILLEGE SWARGLOG, VILLEGE SISSIYYA, VILLEGE LAHBADI NEAR FIRST TOWER, VILLEGE LAHBADI SECUND BINJAHA LINE, VILLEGE LAHBADI THIRD GAS AGENCY, VILLEGE GULRIPURWA, VILLEGE BHATTPURWA GANV, VILLEGE DHARIDASPURWA, VILLEGE SARGADA, VILLEGE SAMULI DEEH, VILLEGE HARDASPUR, VILLEGE MAHRAJNAGRA SECUND, VILLEG NAYAGANV, VILLEG BABURI, VILL LAKHUN 1, VILL PARSIYA MEN ROAD, VILL PARSIYA BAGIYA, VILL RAIPUR, VILL KAJIPUR-1, VILL. SULTANPUR, VILL. JETHRA, VILL. SINGAWAR, VILL. JETHRA NEAR CHANDAN HOUSE, VILL. BADALIPUR, VILL. CHAUDHARY TRADERS ISHANAGAR, VILL MUKHLISHPURUNDER, VILL ALLIPUR, VILL BHADAI PURWA, VILL DHUNDHA KALA NEAR SCHOOL, VILL LAKHUN 2, VILL CHAURA, VILL SAMAISA, VILL DILAWALPUR, VILL CHAPKAHA, VILL KAJIPUR-2, VILL GANESHPUR, VILL DARIGAPUR, VILL SIRSI and VILL NARGADA with its stacking. Dismounting & carriage of old TF of 25 kVA from site to DTC centre and Proper connection at HT/LT of New T/F and successfully energization Under work area of EDD-Nighasan. Please Enable Macros to View BoQ information |