|
| 1 | Safe Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. :- |
| 2 | STP Pole 13 mtr long |
| 3 | PCC Pole 8.5 mtr long |
| 4 | PCC Pole 11 mtr long |
| 5 | ACSR Weasal Conductor |
| 6 | ACSR DOG Conductor |
| 7 | ACSR Rabbit Conductor |
| 8 | 11 KV Pin Insulator with nut and bolt |
| 9 | 11 KV Disc Insulator with nut and bolt |
| 10 | BINDING WIRE |
| 11 | 11 KV CROSS ARM |
| 12 | GUarding ANGLE 65*65*6*1600 MM |
| 13 | LT ABC 3*120 SQMM |
| 14 | BARBED WIRE |
| 15 | 11 KV XLPE CABLE 3*185 SQMM |
| 16 | EARTH WIRE |
| 17 | Joint Kit 11 KV XPLE Cable 3*185 sqmm |
| 18 | Stay set |
| 19 | TOP CHANNEL |
| 20 | M. S . ANGLE 75*75*6 MM |
| 21 | T-off channel |
| 22 | DROPPER CHANNEL |
| 23 | Earthing rod |
| 24 | Guarding Wire 6/8 SWG |
| 25 | LT ABC 3*50 SQMM |
| 26 | 11 KV TPMO |
| 27 | 11 KV Fues Set |
| 28 | 1-PHASE BOX |
| 29 | 33 KV X-ARM |
| 30 | 33 KV Stay Set Complete |
| 31 | 33 KV PIN INS. |
| 32 | 33 KV TOP CHANNEL |
| 33 | 33 KV DISC INS. |
| 34 | Errection STP Pole 13 mtr long/PCC pole 8.5 mtr long/ STP Pole 11 mtr long/PCC Pole 11 mtr longafter digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. |
| 35 | Errection of Double PCC Pole 8.5 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of Soil for each pole including grouting ratio (1:4:8) of the pole with proper ramming after completion of work. |
| 36 | Laying, lifting, Stringing & Proper sagging of ACSR RABBIT CONDUCTOR For HT/LT Line including binding & junpering properly. (as per UPPCL Respo) |
| 37 | Laying, lifting, Stringing & Proper sagging of ACSR DOG CONDUCTOR For HT/LT Line including binding & junpering properly. (as per UPPCL Respo) |
| 38 | Laying, lifting, Stringing & Proper sagging of ACSR WEASAL CONDUCTOR For HT/LT Line including binding & junpering properly. (as per UPPCL Respo) |
| 39 | Fixing of Stay rod complete as per norms. |
| 40 | Fixing of MS Earthing of each 11 KV line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. |
| 41 | Providing and Fixing of MS Nut and Bolts. |
| 42 | Providing and Fixing Clamp with nut and bolt |
| 43 | Providing and Fixing Danger Board with clamp |
| 44 | Providing and Fixing LT Clamp For PCC/STP Pole |
| 45 | Febrication and Fixing of MS Channel 125*65*2240 mm fixing all HT/LT assesories Fues Set HT/LT Pin Insulator on D/P Pole.(as per UPPCL Respo) |
| 46 | Febrication and Fixing of MS Angle 75*75*6 mm fixing all HT/LT assesories Fues Set HT/LT Pin Insulator on D/P Pole.(as per UPPCL Respo) |
| 47 | Febrication and Fixing of Guarding Angle 65*65*6*1600 mm fixing all HT/LT assesories Fues Set HT/LT Pin Insulator on D/P Pole.(as per UPPCL Respo) |
| 48 | Fixing of 11 KV X-ARM |
| 49 | Fixing of guarding wire |
| 50 | Laying of 11 KV XPLE Cable 3*185 sqmm pit of the size 1.5 in the trunch and roas crossing in the air. (as per UPPCL Respo) |
| 51 | Filling of Joint Kit 11 KV XPLE Cable 3*185 sqmm |
| 52 | Laying of LT ABC 3*120 sqmm including fixing of all LT ABC assesories on support (as per UPPCL Respo) |
| 53 | Laying of LT ABC 3*50 sqmm including fixing of all LT ABC assesories on support (as per UPPCL Respo) |
| 54 | Providing and Fixing of ABC Suspension Clamp |
| 55 | Providing and Fixing of ABC Dead & Clamp |
| 56 | Providing and Fixing of ABC Huck for PCC Pole |
| 57 | Providing and Fixing of ABC Peircing Clamp |
| 58 | Providing and Fixing of LT Sackle Insulator |
| 59 | Providing and Fixing Stone Pad |
| 60 | Dismentaling Of Pole/Double Pole Please Enable Macros to View BoQ information |