| 1 | Painting and maintenance work of residential colony at 220/33 KV GIS substation Baram, Jauljivi (Pithoragarh) |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 4 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter |
| 5 | 15 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand). |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : new work (Two or more coat applied @ 1.67 ltr/ 10 sqm over and including priming coat of extreior primer applied @ 0.90 litre/10 sqm). |
| 7 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 8 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs scratches etc. complete. |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface. |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work. |
| 11 | Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account). |
| 12 | Cleaning of drains upto 0.30m wide and disposal of debris/garbage up to nearest dustbin including sprinkling lime powder near drain as per schedule approved E/I including cost of all labour and T&P etc. required for proper completion of work. |
| 13 | Cleaning of nala more than 0.30m wide and disposal of debris/garbage up to nearest dustbin including sprinkling lime powder near drain as per schedule approved E/I including cost of all labour and T&P etc. required for proper completion of work. |
| 14 | Sweeping of colony roads and surrounding area of residences and disposal of debries/garbage upto nearest dustbin as per time schedule approved by E/I including cost of all labour and T&P etc. required for proper completion of work. |
| 15 | Cleaning of Over head tank/Underground water tank capacity ranging from 1001 to 30000 liters with brush, scraping of walls and bottom and disposal of rubbish out side the tank all labour and T&P etc. required for proper completion of work. |
| 16 | Disposal of rubbish/debris from dustbin or places as directed by E/I out side the sub station area including sprinkling white lime powder near dustbin and surrounding area,including all labour T&P etc required for proper completion of work. |
| 17 | Manual chlorination of water by adding bleaching powder as per direction by engineer in charge including all T&P labour etc required for proper completion of work. |
| 18 | Painting work of boundary wall at 220/33 KV GIS substation Baram, Jauljivi (Pithoragarh). |
| 19 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs scratches etc. complete. |
| 20 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface. Please Enable Macros to View BoQ information |