| 1 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (For Road Patri) |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification |
| 3 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm.) (ODR) |
| 4 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm.) (SH, MDR & ODR) |
| 5 | Filling of crack using slow - curing bitumen emulsion (SS-2) and applying crusher dust in case crack are wider than 3mm. Crack Filling |
| 6 | Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of grith upto 30 cm measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 m. out side the periphery of area cleared. |
| 7 | Empty Bag Filling by sandSupply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, cost of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment. SOR Lucknow |
| 8 | Empty Bag Filling by EarthSupply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, cost of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment. SOR Lucknow ll be paid extra for above all items as per Govt. Norms. Please Enable Macros to View BoQ information |