| 1 | Hire charges of Back Hoe Loader for cleaning of running slip during monsoon season and clearance of balance slip after completion of monsoon season including driver, fuel, helper charges and maintenance work of machine etc . required for proper completion of the work as directed by by Engineer in charge. |
| 2 | Block - Chamba |
| 3 | Block - Jakhnidhar/Bhilangna |
| 4 | Block -Kirtinagar |
| 5 | Hire charges of Tipper 5.5 cum/10 ton capacity for disposal of slip upto dumping zone including driver, fuel, helper charges etc . required for proper completion of the work as directed by by Engineer in charge. |
| 6 | Block - Chamba |
| 7 | Block - Jakhnidhar/Bhilangna |
| 8 | Block -Kirtinagar |
| 9 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) |
| 10 | Block -Jakhnidhar |
| 11 | Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914 |
| 12 | Block -Chamba |
| 13 | Block -Jakhnidhar |
| 14 | Block -Bhilangna |
| 15 | Block -Kirtinagar |
| 16 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. |
| 17 | Block -Jakhnidhar |
| 18 | Block -Bhilangna |
| 19 | Block -Kirtinagar |
| 20 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineerin-charge. |
| 21 | Block -Jakhnidhar |
| 22 | Block -Bhilangna |
| 23 | Block -Kirtinagar |
| 24 | Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge. |
| 25 | Block -Jakhnidhar |
| 26 | Block -Bhilangna |
| 27 | Block -Kirtinagar |
| 28 | Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. ( Removal of all failed material,trimming of completed excavation to provide firm vertical faces, cleaning of urface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a mooth continuous surface, all as per clause 3004.2) for grading I -19 mm nominalsize |
| 29 | Block -Chamba |
| 30 | Block -Jakhnidhar |
| 31 | Block -Bhilangna |
| 32 | Block -Kirtinagar |
| 33 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) |
| 34 | Block -Jakhnidhar |
| 35 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction |
| 36 | Block -Jakhnidhar Please Enable Macros to View BoQ information |