| 1 | Supply, Installation, Testing, and Commissioning (SITC) of pressure gauges, including all necessary accessories, fittings, mounting hardware, and connections, complete in all respects and ensuring satisfactory operation of the system in perfect working condition. |
| 2 | Pressure Gauge 21psi (0-350kg/cm2) |
| 3 | Pressure Gauge 7 psi (0-350kg/cm2) |
| 4 | Supply, Installation, Testing, and Commissioning (SITC) of ¾-inch Stainless Steel (SS) Ball Valve, complete with all necessary fittings, accessories, sealing materials, and connections, as required for proper installation and commissioning, and ensuring leak-proof operation in perfect working condition. |
| 5 | Supply, Installation, Testing, and Commissioning (SITC) of a Flow Meter of 1200 LPH (Litres per Hour), including all associated accessories, fittings, supports, and interconnections required for complete installation, calibration, and commissioning, so as to ensure accurate flow measurement and satisfactory operation of the system in all respects. |
| 6 | Supply and replacement of O-Ring suitable for 20-inch Filter Housing, including removal of the worn-out O-ring and providing and fixing the new O-ring complete with all necessary materials and consumables, as required, to ensure leak-proof sealing and satisfactory operation of the filter housing in perfect working condition. |
| 7 | Supply, Installation, Testing and Commissioning (SITC) of 20-inch Filter Housing with 1-inch inlet and outlet connections, complete with housing body, sealing O-ring, mounting arrangement, and all necessary accessories, fittings, and connections required for proper installation and commissioning, ensuring leak-proof operation and satisfactory performance of the system in perfect working condition. |
| 8 | Supply, Installation, Testing and Commissioning (SITC) of a Float Switch, complete with all necessary accessories, fittings, mounting arrangements, cabling connections, and associated materials required for proper installation and commissioning, ensuring reliable level sensing and satisfactory operation of the system in perfect working condition. |
| 9 | Supply, Installation, Testing and Commissioning (SITC) of 1-inch (25 NB) Multiport Valve suitable for filtration systems, with a maximum operating pressure of 5 kg/cm², complete with integral positions for Service, Bypass, Drain, Rinse, and Backwash, including all necessary accessories, fittings, unions, gaskets, sealing materials, and interconnections required for proper installation and commissioning, ensuring leak-proof operation and satisfactory performance of the system in perfect working condition. |
| 10 | Supply, Installation, Testing and Commissioning (SITC) of 50-Litre polypropylene Dosing Tank, complete with screw cap and all necessary accessories, fittings, and connections, as required for proper installation and satisfactory operation in perfect working condition. |
| 11 | Supply, Installation, Testing and Commissioning (SITC) 4040 End cap (ABS/PP) for RO Membrane Housing include all necessary componets/accessories. |
| 12 | Supply, Installation, Testing, and Commissioning (SITC) of Dosing pump as per the specification below:Max Discharge: mL/min -100 L/h - 6Max Discharge Pressure: 4BarStroke Speed: 30 to 300 strokes/minStroke length - Fixed at 1.0mmPower Supply - 1Ph/50Hz |
| 13 | Supply, Installation, Testing, and Commissioning (SITC) of Capacitor(150µF). |
| 14 | Supply and fixing of chemical-resistant flexible PVC/LDPE hose, 6 mm ID × 8 mm OD, suitable for chemical dosing applications in 500 LPH RO plants, complete with all necessary fittings, clamps, and connections, as required for proper installation and satisfactory operation in perfect working condition. |
| 15 | Supply, Installation, Testing, and Commissioning (SITC) of the following CPVC Fittings: |
| 16 | 3/4\\" FTA |
| 17 | 3/4\\" MTA |
| 18 | 1/2\\" FTA |
| 19 | 1/2\\" MTA |
| 20 | 1\\" MTA |
| 21 | 1\\" FTA |
| 22 | 3/4\\" Coupling |
| 23 | 1/2\\" Coupling |
| 24 | 1\\" Coupling |
| 25 | 3/4\\" Ball Valve |
| 26 | 1\\" Ball Valve |
| 27 | 3/4\\" Tee |
| 28 | 1/2\\" Tee |
| 29 | 1\\" Tee |
| 30 | 3/4\\" L |
| 31 | 1/2\\" L |
| 32 | 3/4\\" union |
| 33 | 1/2\\" Union |
| 34 | 1\\" Union |
| 35 | 3/4\\" Pipe |
| 36 | 1/2\\" Pipe |
| 37 | 1\\" Pipe |
| 38 | 3/4\\" Brass Tee (1/2\\") |
| 39 | 3/4\\" Brass L |
| 40 | 3/4\\" - 1/2\\" reducer |
| 41 | 1\\" -3/4\\" reducer |
| 42 | 1\\" Brass Tee (1/2\\") |
| 43 | CPVC paste |
| 44 | Supply and Installation of Black Saddle Nylon Clamp for 4040 RO Membrane with all required for secure mounting of the membrane. |
| 45 | Supply of all materials, labour, and commissioning for replacement of pretreatment filter media in the 500 LPH Reverse Osmosis (RO) Plant, including removal and disposal of the existing media and supply, filling, leveling, and commissioning of new Quartz Silica Sand of exisitng graded sizes and Activated Carbon (and, where applicable, Softener Resin), complete with backwashing, rinsing, testing, and commissioning. The scope shall also include chemical cleaning (chemical wash) of the existing RO Membranes using suitable cleaning chemicals to restore membrane performance, complete in all respects and ensuring satisfactory operation of the 500 LPH RO Plant in perfect working condition. Please Enable Macros to View BoQ information |