| 1 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre depth and getting out in hard/dense soil in foul position complete all as specified and as directed by the Engineer-in-Charge |
| 2 | Excavation in trenches exceeding 1.5 metre and not exceeding 3 metre depth and getting out in hard/dense soil in foul position complete all as specified and as directed by the Engineer-in-Charge |
| 3 | Notes for Item No 1 & 2: (a) Excavating either straight or curved on plan.(b) Clearing away all grass vegetation, sappings, shrubs, brushwood, undergrowth, roots, and trees not exceeding 30cm girth (measured one metre above ground level) and removing rubbish upto a distance of 50 metres outside the periphery of the area under clearance except in the case of surface dressing which includes for all the foregoing except clearing away of trees |
| 4 | (c) Bailing out, pumping out or otherwise removing all water which may accumulate in the excavations.(d) Setting out the work profiles, etc. as well as for all tools and plants.(e) All materials and labour required protecting against risk of accidents, etc.(f) Watching and lighting, whenever necessary.(g) Forming (or leaving) ‘Dead men’ or ‘Tell tales’ in borrow pits and their removal after record of measurements where required. |
| 5 | (h) Forming (or leaving) steps in sides of deep excavations and their removal or covering up, after record of measurements(j) Excavation for insertion of planking and strutting where required(k) Removing slips or falls in excavations(l) Authorised battering or benching of excavations(m) Slinging or supporting pipes, electric cables, etc. met with during excavation |
| 6 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick in excavated soil complete all as specified and as directed. |
| 7 | Removing excavated soil to a distance exceeding 1.5Km not exc 5.0Km and depositing where directed at a level, not exceeding 1.5 metre above the starting point complete all as specified and as directed |
| 8 | Supply and fix salt-glazed stoneware drain pipes of 200mm bore, laid in trenches and jointed including demolition of existing pipe any size complete all as specified and as directed. |
| 9 | Material and labour for concrete bed to drain pipes of 200mm bore with cement concrete 1:3:6 type C2 using 40 mm graded stone aggregate including packing under and haunching against the sides of pipes and tested complete all as specified and as directed. |
| 10 | Supply and fix salt-glazed stoneware drain pipes of 150mm bore, laid in trenches and jointed including demolition of existing pipe any size complete all as specified and as directed. |
| 11 | Material and labour for concrete bed to drain pipes of 150mm bore with cement concrete 1:3:6 type C2 using 40 mm graded stone aggregate including packing under and haunching against the sides of pipes and tested complete all as specified and as directed. |
| 12 | Supply and fix salt-glazed stoneware drain pipes of 100mm bore, laid in trenches and jointed including demolition of existing pipe any size complete all as specified and as directed. |
| 13 | Material and labour for concrete bed to drain pipes of 100mm bore with cement concrete 1:3:6 type C2 using 40 mm graded stone aggregate including packing under and haunching against the sides of pipes and tested complete all as specified and as directed. |
| 14 | Demolition of reinforced cement concrete of any description and in any position (Reinforcement cut as required to facilitate demolition) complete all as specified and as directed by Engineer-in-charge. |
| 15 | Material and labour for reinforced precast cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate as in landings, cover slabs (for man holes etc.) and similar articles with plain fair faces setting in CM 1:4 including necessary form work complete all as specified and as directed. Note: Reinforcement will be measured seperatley |
| 16 | Material and labour for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. |
| 17 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc. and precast concrete articles complete all as specified and as directed. |
| 18 | Material and labour for brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius with old size bricks in cement mortar 1:4 complete all as specified and as directed |
| 19 | Ditto- all as per item No 13 here-in-before, but except bricks complete all as specified and as directed. Note: Serviceable bricks obtained from Sl item No 13 be reused Please Enable Macros to View BoQ information |
| 20 | Ditto- all as per item No 13 here-in-before, but except bricks complete all as specified and as directed. Note: Serviceable bricks obtained from Sl item No 13 be reused Please Enable Macros to View BoQ information |