| 1 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by departmental officers A) Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 2 | Supply and Delivery of 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. |
| 3 | Supply and Delivery of 75 mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. |
| 4 | Supply and delivey of 80 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000 |
| 5 | Supply and delivey of 65 MM GI PIPE ISI As per standard specification including all charges etc,complete conforming to IS 4985/2000 |
| 6 | Conveyance and lowering of 90mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications |
| 7 | Conveyance and lowering of 75mm dia HDPE PIPES -pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications |
| 8 | Towards Jointing of 90 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications |
| 9 | Towards Jointing of 75 MM HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications |
| 10 | Supply and Delivery of 80mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete. |
| 11 | Supply and Delivery of 65 mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete. |
| 12 | Laying and joining of 80 mm diameter I.S.I.make GI pipes with Proper gradient including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers. |
| 13 | Laying and joining of65 mm diameter I.S.I.make GI pipes with Proper gradient including cost and conveyance Complete complying with standard specifications and as directed by the departmental Engineers. |
| 14 | Refilling the Excavated earth including well Consolidation including cost and conveyance complete complying with standard specifications and as directed by the departmental Engineers. Please Enable Macros to View BoQ information |