| 1 | Items |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(i) Ordinary soil.(B). Mechanical Means (Depth upto 3 m) |
| 3 | Dry rubble Flooring / Stone Soling. |
| 4 | Centring and shuttering including strutting proping etc. and removal of form work for:a) Foundations and plinth. |
| 5 | Centring and shuttering including strutting proping etc. and removal of form work for:b) Walls including attached buttresses, pilasters etc. |
| 6 | Centring and shuttering including strutting proping etc. and removal of form work for:c) Columns, pillars and piers. |
| 7 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth |
| 8 | Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/TMT steel |
| 9 | Reinforced concrete work in foundations, footings, bases of columns etc.and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal |
| 10 | Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominalsize) |
| 11 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominalsize). |
| 12 | Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 13 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 14 | 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand). |
| 15 | Neat cement punning |
| 16 | Sand filling in wells complete as per drawing and technical specifications |
| 17 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications including loading, unloading, transportation, etc.(A) Random Rubble Masonry |
| 18 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications including loading, unloading, transportation, etc. |
| 19 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand).d) Raised and Cut pointing |
| 20 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (B) Sandy material |
| 21 | Providing and fixing brass full way valve with wheel of approved quality.e) 80 mm nominal bore |
| 22 | Providing and fixing brass full way valve with wheel of approved quality.b) 32 mm nominal bore |
| 23 | Providing and fixing brass full way valve with wheel of approved quality.e) 40 mm nominal bore |
| 24 | Providing and fixing, fly proof galvanized MS wire gauge of IS gauge designation 85 g with wire of dia 0.56 mm to windows and clerestory windows including 62 x 19 mm beading of best available local wood |
| 25 | Providing best available local wood (Class - B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position. |
| 26 | Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses.b) 0.63 mm thick GI sheet |
| 27 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.a) External work.iv) 32 mm nominal outer dia Pipes |
| 28 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.a) External work.ii) 15 mm nominal outer dia Pipes |
| 29 | Providing and fixing ball valve (brass) of approved quality complete.A) High pressure with copper floatsa) 15 mm nominal bore |
| 30 | Providing and fixing normal gauge HD polythene pipes of approved quality complete with appropriate fittings including including trenching and refilling etc (external work). |
| 31 | Providing and fixing PVC connection pipe with brass union.B) 45 cm length.b) 20 mm nominal bore |
| 32 | Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip. |
| 33 | Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads. |
| 34 | Cost of Haulage of Excluding Loading and Unloading on hill roads. Haulage of materials by truck excluding cost of loading, unloading and stacking.Surfaced Road Please Enable Macros to View BoQ information |